Providing for the capital budget for fiscal year 2025-2026;
itemizing public improvement projects, furniture and
equipment projects, transportation assistance, redevelopment
assistance projects, flood control projects and Pennsylvania
Fish and Boat Commission projects leased or assisted by the
Department of General Services and other State agencies,
together with their estimated financial costs; authorizing
the incurring of debt without the approval of the electors
for the purpose of financing the projects to be constructed,
acquired or assisted by the Department of General Services
and other State agencies; authorizing the use of current
revenue for the purpose of financing the projects to be
constructed, acquired or assisted by the Department of
General Services and other State agencies stating the
estimated useful life of the projects; and making
appropriations.
The General Assembly of the Commonwealth of Pennsylvania
hereby enacts as follows:
Section 1. Short title.
This act shall be known and may be cited as the Capital
Budget Project Itemization Act of 2025-2026.
Section 2. Total authorizations.
(a) Public improvements.--The total authorization for the
additional capital projects in the category of public
improvement projects itemized in section 3 and to be acquired or
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
constructed by the Department of General Services, its
successors or assigns, and to be financed by the incurring of
debt shall be $22,393,910,000 $22,525,410,000.
(b) Furniture and equipment.--The total authorization for
the additional capital projects in the category of public
improvement projects consisting of the acquisition of original
movable furniture and equipment to complete public improvement
projects itemized in section 4 and to be acquired by the
Department of General Services, its successors or assigns, and
to be financed by the incurring of debt shall be $654,994,000.
(c) Transportation assistance.--The total authorization for
the capital projects in the category of transportation
assistance projects itemized in section 5 with respect to which
an interest is to be acquired in or constructed by the
Department of Transportation, its successors or assigns and to
be financed by the incurring of debt shall be $1,808,850,000
$1,884,350,000.
(d) Redevelopment assistance.--The total authorization for
the capital projects in the category of redevelopment capital
projects itemized in section 6 for capital grants by the
Department of Community and Economic Development, its successors
or assigns and to be financed by the incurring of debt shall be
$6,143,330,500 $13,034,265,000.
(e) Flood control.--The total authorization for the capital
projects in the category of flood control projects itemized in
section 7 and to be constructed by the Department of
Environmental Protection, its successors or assigns and to be
financed by the incurring of debt shall be $109,900,000.
(f) Fish Fund and Boat Fund.--The total authorization for
the capital projects in the category of public improvement
20250HB1331PN2389 - 2 -
<--<--
<--
<--
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
projects itemized in section 8 to be acquired or developed by
the Pennsylvania Fish and Boat Commission and to be financed by
the incurring of debt or by current revenues of the Fish Fund
and the Boat Fund pursuant to executive authorization shall be
$199,400,000 $208,900,000.
Section 3. Itemization of public improvement capital projects.
Additional capital projects in the category of public
improvement projects to be acquired or constructed by the
Department of General Services, its successors or assigns, and
to be financed by the incurring of debt, are hereby itemized,
together with their respective estimated financial costs, as
follows:
Project
Total Project
Allocation
(1) Department of Agriculture
(i) Pennsylvania State University College of
Agricultural Sciences, Centre County
(A) Plant Science Facility to allow for
cross-disciplinary innovation and
research, including research facility,
greenhouse, head house and climate-
controlled plant production features
Project Allocation 30,000,000
(B) Animal Diagnostic Laboratory
construction, alterations,
renovations, site improvements,
infrastructure upgrades and land
acquisition
Project Allocation 6,127,000
(ii) Livestock Evaluation Center, Centre
20250HB1331PN2389 - 3 -
<--<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
County
(A) Construction, alterations,
renovations, site improvements and
infrastructure upgrades
Project Allocation 10,000,000
(iii) New Bolton Center, Chester County
(A) Construction of Pennsylvania Equine
Toxicology and Research Laboratory on
New Bolton Campus of The University of
Pennsylvania
Project Allocation 20,000,000
(iv) Annex, Dauphin County
(A) New construction, alterations,
renovations, site improvements,
infrastructure upgrades and land
acquisition
Project Allocation 8,000,000
(v) Farm Show Complex, Dauphin County
(A) Construction, alterations,
renovations, site improvements and
infrastructure upgrades
Project Allocation 35,000,000
(vi) Headquarters, Veterinary Laboratory and
Farm Show Complex, Dauphin County
(A) Upgrade security system and cameras
Project Allocation 10,000,000
(vii) Entomology Laboratory, Dauphin County
(A) New construction, alterations,
renovations, site improvements,
infrastructure upgrades and land
20250HB1331PN2389 - 4 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
acquisition
Project Allocation 10,000,000
(viii) Greenhouse and Nematology Laboratory,
Dauphin County
(A) New construction, alterations,
renovations, site improvements,
infrastructure upgrades and land
acquisition
Project Allocation 10,000,000
(ix) Animal Health Diagnostic Laboratory
(A) Renovations, additions and
construction, including site and
infrastructure improvements for design
and construction to satisfy modern
testing procedures
Project Allocation 75,500,000
(x) Headquarters, Department of Agriculture,
Dauphin County
(A) Renovations, additions and
construction, including site and
infrastructure improvements
Project Allocation 25,000,000
(2) Department of Conservation and Natural
Resources
(i) Point State Park, Allegheny County
(A) Portal bridge replacement and park
sidewalk rehabilitation and ADA
improvements
Project Allocation 3,750,000
(B) Construct new parking facilities,
20250HB1331PN2389 - 5 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
park office, rehabilitate flag bastion
area and install solar arrays
Project Allocation 14,000,000
(ii) Blue Knob State Park, Bedford County
(A) Rehabilitation of Blue Knob Ski area,
including improved facilities,
parking, roadway and viewscapes to
promote year-round recreation
Project Allocation 25,000,000
(iii) Delaware Canal State Park, Bucks County
(A) Visitor center, park office and site
rehabilitation
Project Allocation 25,000,000
(iv) Gallitzin State Forest, Cambria County
(A) Construct new district office
Project Allocation 12,000,000
(v) Elk State Forest, Cameron County
(A) Replace Brooks Run forest maintenance
headquarters and storage building
Project Allocation 3,750,000
(B) Hicks Run Forest maintenance
headquarters and five-bay pole
building
Project Allocation 1,250,000
(v.1) Glen Onoko, Carbon County
(A) Design and build the trail system at
Glen Onoko
Project Allocation 7,000,000
(vi) Forest Fire Protection, Centre County
(A) Construct new regional air operations
20250HB1331PN2389 - 6 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
facility
Project Allocation 3,750,000
(vi.1) Mira Lloyd Dock Conservation Center,
Centre County
(A) Repairs to Penn Nursery Dam or Breach
Dam and construct alternative water
supply for irrigation system
Project Allocation 4,000,000
(vii) Penn Nursery, Centre County
(A) Construct new seed extraction
building
Project Allocation 1,250,000
(viii) Sproul State Forest, Centre County
(A) Replace Snowshoe maintenance
headquarters
Project Allocation 2,500,000
(ix) Big Elk Creek State Park, Chester County
(A) State park development phase 2 and
land acquisition
Project Allocation 17,500,000
(x) Moshannon State Forest, Clearfield County
(A) Demolish Dague Mechanics Shop and
replace with modern mechanics shop
Project Allocation 2,500,000
(B) Repairs to Shaggers Inn Dam
Project Allocation 5,000,000
(xi) Parker Dam State Park, Clearfield County
(A) Dam repairs and lake dredging
Project Allocation 11,250,000
(xii) Bald Eagle State Forest, Clinton County
20250HB1331PN2389 - 7 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) Construct new wood shop, groomer
storage and pole storage building
Project Allocation 5,625,000
(xiii) Forestry Lab, Dauphin County
(A) Construction of new laboratory,
including site and infrastructure
improvements and land acquisition
Project Allocation 35,000,000
(xiv) Geologic Survey Headquarters, Dauphin
County
(A) Construct a new headquarters building
for the Bureau of Geologic Survey
Project Allocation 30,000,000
(xv) Presque Isle State Park, Erie County
(A) Sand nourishment
Project Allocation 25,000,000
(B) Dune replacement and resource work
Project Allocation 12,500,000
(C) Roads and multipurpose trail
rehabilitation
Project Allocation 8,750,000
(xv.1) Laurel Caverns, Fayette County
(A) Development of day-use facilities,
visitor center and overnight
facilities and acquisition
Project Allocation 30,000,000
(xvi) Cornplanter State Park, Forest County
(A) Construct new resource management
center and storage building
Project Allocation 7,000,000
20250HB1331PN2389 - 8 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(xvii) Michaux State Forest, Franklin County
(A) Construct resource management center
and storage building
Project Allocation 21,500,000
(B) CONSTRUCT, RENOVATE OR REDEVELOP
FACILITIES IN THE MICHAUX STATE FOREST
OR IN THE MONT ALTO AREA FOR A VISITOR
CENTER AND/OR RESOURCE MANAGEMENT
CENTER
PROJECT ALLOCATION 21,500,000
(xviii) Buchanan State Forest, Fulton County
(A) Replace Sideling Hill maintenance
headquarters and mechanics shop
Project Allocation 2,500,000
(xviii.1) Cowans Gap State Park, Fulton
County
(A) Rehabilitate Cowans Gap Dam
Project Allocation 7,000,000
(xix) Ryerson State State Park, Greene County
(A) Resource and recreation improvements
Phase 2
Project Allocation 12,500,000
(xx) Yellow Creek State Park, Indiana County
(A) Day use rehabilitation
Project Allocation 7,500,000
(xxi) Clear Creek State Forest, Jefferson
County
(A) New maintenance shop and equipment
storage
Project Allocation 1,875,000
20250HB1331PN2389 - 9 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(xxii) Pinchot State Forest, Lackawanna
County
(A) Breach and remove Edgerton Dam
Project Allocation 1,250,000
(B) Breach and remove Olyphant Dam No. 3
Project Allocation 1,875,000
(xxiii) Memorial Lake State Park, Lebanon
County
(A) Rehabilitate dam
Project Allocation 14,000,000
(xxiv) Forest Fire Protection, Luzerne County
(A) Rebuild Hazelton Air Operations
building, including site improvements
Project Allocation 5,000,000
(xxv) Pinchot State Forest, Luzerne County
(A) Construct Pinchot forest district
resource management center complex
Project Allocation 16,500,000
(xxvi) Tiadaghton State Forest, Lycoming
County
(A) Construct new Waterville mechanics
garage and storage
Project Allocation 5,000,000
(xxvii) Tuscarora State Forest, Mifflin
County
(A) Replace East Licking Creek forest
maintenance headquarters
Project Allocation 5,000,000
(xxviii) Norristown Farm Park, Montgomery
County
20250HB1331PN2389 - 10 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) Replace multiple vehicular and
pedestrian bridges
Project Allocation 6,250,000
(B) Transportation infrastructure and
bridges
Project Allocation 25,000,000
(xxix) Shikellamy State Park, Northumberland
County
(A) Full replacement of dam and permanent
causeway
Project Allocation 37,500,000
(xxx) Delaware State Forest, Pike County
(A) Lilly Pond Dam spillway repair and
replacement
Project Allocation 2,250,000
(xxxi) Denton Hill State Park, Potter County
(A) Upgrade, rehabilitation or
replacement of ski lift, lighting,
equipment, parking and structures to
improve operations, recreation and
public safety
Project Allocation 18,400,000
(xxxii) Gallitzin State Forest, Somerset
County
(A) Raze and replace the Babcock Forest
maintenance headquarters and storage
building
Project Allocation 5,625,000
(xxxiii) Kooser State Park, Somerset County
(A) Day use and dam rehabilitation
20250HB1331PN2389 - 11 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 6,250,000
(xxxiv) Leonard Harrison State Park, Tioga
County
(A) Turkey Path Trail rehabilitation and
realignment
Project Allocation 3,750,000
(xxxv) Tioga State Forest, Tioga County
(A) Construct new maintenance
headquarters
Project Allocation 2,500,000
(B) Construct new resource management
center
Project Allocation 40,000,000
(xxxv.1) Prompton State Park, Wayne County
(A) Construction, renovation,
infrastructure, redevelopment and
other related costs for improvements
to Prompton State Park
Project Allocation 750,000
(xxxvi) Vosburg Neck State Park, Wyoming
County
(A) State park development and land
acquisition Phase 2
Project Allocation 17,500,000
(xxxvii) Susquehanna Riverlands State Park,
York County
(A) State park development and land
acquisition Phase 2
Project Allocation 17,500,000
(xxxviii) State Parks - Statewide
20250HB1331PN2389 - 12 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) Upgrades and improvements to
campground washhouses, utilities, site
work and other amenities, including
new construction, renovations and
alterations
Project Allocation 25,000,000
(B) Rehabilitate historic structures
Project Allocation 12,500,000
(C) Critical regulatory system repairs
and replacements at multiple water and
wastewater treatment plants
Project Allocation 12,500,000
(D) New construction, renovations and
alterations at roofed overnight
colonies, including improvements to
supporting infrastructure at multiple
locations
Project Allocation 6,250,000
(E) Improvements to training academy
infrastructure and range
Project Allocation 37,500,000
(F) Dam rehabilitation, lake dredging and
various dam impoundments
Project Allocation 46,000,000
(G) Replacement and rehabilitation of
multiple maintenance facilities
Project Allocation 12,500,000
(3) Department of Corrections
(i) State Correctional Institution at Benner,
Centre County
20250HB1331PN2389 - 13 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
upgrade of utilities and related
infrastructure, land development and
site infrastructure improvements
Project Allocation 22,769,000
(ii) State Correctional Institution at
Rockview, Centre County
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
upgrade of utilities and related
infrastructure land development and
site infrastructure improvements
Project Allocation 79,151,000
(iii) State Correctional Institution at
Houtzdale, Clearfield County
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
upgrade of utilities and related
infrastructure land development and
site infrastructure improvements
Project Allocation 25,040,000
(iv) Quehanna Boot Camp, Clearfield County
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
upgrade of utilities and related
20250HB1331PN2389 - 14 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
infrastructure land development and
site infrastructure improvements
Project Allocation 10,150,000
(v) State Correctional Institution at
Cambridge Springs, Crawford County
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
upgrade of utilities and related
infrastructure land development and
site infrastructure improvements
Project Allocation 14,629,000
(vi) State Correctional Institution at Camp
Hill, Cumberland County
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
upgrade of utilities and related
infrastructure land development and
site infrastructure improvements
Project Allocation 212,961,000
(vii) State Correctional Institution at
Chester, Delaware County
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
upgrade of utilities and related
infrastructure land development and
site infrastructure improvements
Project Allocation 15,450,000
20250HB1331PN2389 - 15 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(viii) State Correctional Institution at
Albion, Erie County
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
upgrade of utilities and related
infrastructure land development and
site infrastructure improvements
Project Allocation 27,877,000
(ix) State Correctional Institution at
Fayette, Fayette County
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
upgrade of utilities and related
infrastructure land development and
site infrastructure improvements
Project Allocation 11,625,000
(x) State Correctional Institution at Forest,
Forest County
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
upgrade of utilities and related
infrastructure land development and
site infrastructure improvements
Project Allocation 42,053,000
(xi) State Correctional Institution at
Greene, Greene County
(A) Design and construction of building
20250HB1331PN2389 - 16 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
expansion, new construction,
renovations and alterations, including
upgrade of utilities and related
infrastructure land development and
site infrastructure improvements
Project Allocation 23,945,000
(xii) State Correctional Institution at
Huntingdon, Huntingdon County
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
upgrade of utilities and related
infrastructure land development and
site infrastructure improvements
Project Allocation 18,670,000
(xiii) State Correctional Institution at
Smithfield, Huntingdon County
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
upgrade of utilities and related
infrastructure land development and
site infrastructure improvements
Project Allocation 21,726,000
(xiv) State Correctional Institution at Pine
Grove, Indiana County
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
upgrade of utilities and related
20250HB1331PN2389 - 17 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
infrastructure land development and
site infrastructure improvements
Project Allocation 55,985,000
(xv) Elizabethtown Training Facility,
Lancaster County
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
upgrade of utilities and related
infrastructure land development and
site infrastructure improvements
Project Allocation 12,888,000
(xvi) State Correctional Institution at
Dallas, Luzerne County
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
upgrade of utilities and related
infrastructure land development and
site infrastructure improvements
Project Allocation 34,000,000
(xvii) State Correctional Institution at
Muncy, Lycoming County
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
upgrade of utilities and related
infrastructure land development and
site infrastructure improvements
Project Allocation 96,000,000
20250HB1331PN2389 - 18 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(xviii) State Correctional Institution at
Mercer, Mercer County
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
upgrade of utilities and related
infrastructure land development and
site infrastructure improvements
Project Allocation 14,837,000
(xix) State Correctional Institution at
Graterford, Montgomery County
(A) Demolition of facility, including
code, permit, site, utility and
infrastructure-related issues
Project Allocation 50,173,000
(xx) State Correctional Institution at
Phoenix, Montgomery County
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
upgrade of utilities and related
infrastructure land development and
site infrastructure improvements
Project Allocation 14,826,000
(xxi) State Correctional Institution at Coal
Township, Northumberland County
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
upgrade of utilities and related
20250HB1331PN2389 - 19 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
infrastructure land development and
site infrastructure improvements
Project Allocation 31,543,000
(xxii) State Correctional Institution at
Frackville, Schuylkill County
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
upgrade of utilities and related
infrastructure land development and
site infrastructure improvements
Project Allocation 42,136,000
(xxiii) State Correctional Institution at
Mahanoy, Schuylkill County
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
upgrade of utilities and related
infrastructure land development and
site infrastructure improvements
Project Allocation 41,252,000
(xxiv) State Correctional Institution at
Laurel Highlands, Somerset County
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
upgrade of utilities and related
infrastructure land development and
site infrastructure improvements
Project Allocation 22,471,000
20250HB1331PN2389 - 20 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(xxv) State Correctional Institution at
Somerset, Somerset County
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
upgrade of utilities and related
infrastructure land development and
site infrastructure improvements
Project Allocation 30,623,000
(xxvi) State Correctional Institution at
Waymart, Wayne County
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
upgrade of utilities and related
infrastructure land development and
site infrastructure improvements
Project Allocation 44,318,000
(4) Department of Education
(i) Department of Education Headquarters
(Reserved)
(ii) University of Pittsburgh
(A) Building to connect the multiple mid-
campus buildings - Oakland Campus,
Allegheny County. Renovation, new
construction and alterations,
including land development and site
infrastructure improvements
Project Allocation 180,000,000
(B) Campuswide programmatic and
20250HB1331PN2389 - 21 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
infrastructure upgrades to buildings -
Oakland Campus, Allegheny County. New
construction, land development, site
acquisition and site infrastructure
improvements and/or renovation and
upgrades to teaching, research, office
and support space, including upgrades
to mechanical, electric, plumbing and
fire protection systems
Project Allocation 100,000,000
(C) Existing apartment building or hotel
for student housing - Oakland Campus,
Allegheny County. Renovation, new
construction and alterations,
including land development and site
infrastructure improvements
Project Allocation 180,000,000
(D) Former PAA building - Oakland Campus,
Allegheny County. Renovation, new
construction and alterations,
including land development and site
infrastructure improvements
Project Allocation 180,000,000
(E) New laboratory and classroom building
- Oakland Campus, Allegheny County.
Renovation, new construction and
alterations, including land
development and site infrastructure
improvements
Project Allocation 480,000,000
20250HB1331PN2389 - 22 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(F) Old Engineering Hall - Oakland
Campus, Allegheny County. Renovation,
new construction and alterations,
including land development and site
infrastructure improvements
Project Allocation 480,000,000
(G) Parking garages - Oakland Campus,
Allegheny County. Renovation, new
construction and alterations,
including land development and site
infrastructure improvements
Project Allocation 60,000,000
(H) New residence hall - Oakland Campus,
Allegheny County. Renovation, new
construction and alterations,
including land development and site
infrastructure improvements
Project Allocation 132,000,000
(I) Space Research Coordination Center
(SRCC) building - Oakland Campus,
Allegheny County. Renovation, new
construction and alterations,
including land development and site
infrastructure improvements
Project Allocation 480,000,000
(J) Fitzgerald Fieldhouse - Oakland
Campus, Allegheny County. Renovation,
new construction and alterations,
including land development and site
infrastructure improvements
20250HB1331PN2389 - 23 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 360,000,000
(K) New indoor track and band facility -
Oakland Campus, Allegheny County. New
construction, land development, site
acquisition and site infrastructure
improvements
Project Allocation 180,000,000
(L) New multisport athletic and
entertainment facility - Oakland
Campus, Allegheny County. New
construction, land development, site
acquisition and site infrastructure
improvements, including extension of
utilities
Project Allocation 780,000,000
(M) One Bigelow Academic Teaching and
Research Complex - Oakland Campus,
Allegheny County. New construction,
land development, site acquisition and
site infrastructure improvements
Project Allocation 300,000,000
(N) New School of Dental Medicine
building - Oakland Campus, Allegheny
County. New construction, land
development, site acquisition and site
infrastructure improvements
Project Allocation 240,000,000
(O) New School of Health and
Rehabilitation Sciences building -
Oakland Campus, Allegheny County. New
20250HB1331PN2389 - 24 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
construction, land development, site
acquisition and site infrastructure
improvements
Project Allocation 150,000,000
(P) New School of Nursing building -
Oakland Campus, Allegheny County. New
construction, land development, site
acquisition and site infrastructure
improvements
Project Allocation 240,000,000
(Q) New Student Union Building - Oakland
Campus, Allegheny County. New
construction, land development, site
acquisition and site infrastructure
improvements
Project Allocation 240,000,000
(R) Track and Field Athletic Field
Complex - Oakland Campus, Allegheny
County. New construction, land
development, site acquisition and site
infrastructure improvements
Project Allocation 180,000,000
(S) Trees Hall - Oakland Campus,
Allegheny County. Renovation, new
construction, alterations, land
development, site infrastructure
improvements, including improvements
to meet current building codes and
ADA, and mechanical, electrical and
fire protection systems upgrades
20250HB1331PN2389 - 25 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 200,000,000
(T) Twentieth Century Club building -
Oakland Campus, Allegheny County.
Renovation, new construction,
alterations, land development, site
infrastructure improvement, including
improvements to meet current building
codes and ADA, and mechanical,
electrical and fire protection systems
upgrades
Project Allocation 100,000,000
(U) Western Psychiatric Hospital and
Clinic (WPIC) parking garage - Oakland
Campus, Allegheny County. Renovation,
new construction, alterations, land
development and site infrastructure
improvement, including improvements to
meet current building codes and ADA
Project Allocation 100,000,000
(V) Acquisition, demolition,
construction, infrastructure and other
related costs for the University of
Pittsburgh at Titusville, including
renovation and rehabilitation of
existing facilities and construction
of new facilities in the City of
Titusville
Project Allocation 10,000,000
(W) Acquisition, demolition,
infrastructure and other related costs
20250HB1331PN2389 - 26 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
for the University of Pittsburgh at
Bradford, including renovation and
rehabilitation of existing facilities
and construction of new facilities
Project Allocation 10,000,000
(iii) The Pennsylvania State University
(A) Smith Building - Altoona Campus,
Blair County. Design, construction
(new space or addition to and/or
renovation of existing space,
including demolition, abatement of
hazardous materials, extensions and/or
upgrading of utilities and other
infrastructure needs) and other
related costs for Smith Building at
Penn State Altoona. In order to
increase both the recruitment and
retention of students, the proposed
renovations will provide one-stop
shopping for student support as well
as provide a more-accessible and
visible space for the Robert L. Smith
Learning Resources Center. Funding
will be used for both design and
construction costs, as well as
necessary utility upgrades and
extensions, site improvements and
code-related upgrades. All costs for
both occupant and program relocation
or interim facilities will be
20250HB1331PN2389 - 27 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
included. The construction will both
meet all current building code
requirements and provide for barrier-
free access as required by the
Americans with Disabilities Act and
related codes.
Project Allocation 25,000,000
(B) Atherton Street steam line crossing -
University Park, Centre County.
Design, construction (new space or
addition to and/or renovation of
existing space, including demolition,
abatement of hazardous materials,
extensions and/or upgrading of
utilities and other infrastructure
needs) and other related costs for the
Atherton Street Steam Line Crossing at
Penn State University Park. This
project involves the installation of a
new steam line that traverses Atherton
Street and will connect West Campus
with the central steam system. Funding
will be used for both design and
construction costs, as well as
necessary utility upgrades and
extensions, site improvements and
code-related upgrades. All costs for
both occupant and program relocation
or interim facilities will be
included. The construction will both
20250HB1331PN2389 - 28 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
meet all current building code
requirements and provide for barrier-
free access as required by the
Americans with Disabilities Act and
related codes.
Project Allocation 15,000,000
(C) Chiller unit - University Park,
Centre County. Design, construction
(new space or addition to and/or
renovation of existing space,
including demolition, abatement of
hazardous materials, extensions and/or
upgrading of utilities and other
infrastructure needs) and other
related costs for a chiller unit at
Penn State University Park. This
chiller unit will replace an existing,
smaller chiller unit which will delay
the need of a new chilled water plant.
Funding will be used for both design
and construction costs, as well as
necessary utility upgrades and
extensions, site improvements and
code-related upgrades. All costs for
both occupant and program relocation
or interim facilities will be
included. The construction will both
meet all current building code
requirements and provide for barrier-
free access as required by the
20250HB1331PN2389 - 29 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Americans with Disabilities Act and
related codes.
Project Allocation 25,000,000
(D) Demolition program - University Park,
Centre County. Additional funding for
the design, construction (new space or
addition to and/or renovation of
existing space, including demolition,
abatement of hazardous materials,
extensions and/or upgrading of
utilities and other infrastructure
needs), and other related costs for
the Demolition Program at Penn State
University Park. This project involves
the demolition of campus facilities.
Funding will be used for both design
and construction costs, as well as
necessary utility upgrades and
extensions, site improvements and
code-related upgrades. All costs for
both occupant and program relocation
or interim facilities will be
included. The construction will both
meet all current building code
requirements and provide for barrier-
free access as required by the
Americans with Disabilities Act and
related codes
Project Allocation 20,000,000
(E) Electrical interconnection work -
20250HB1331PN2389 - 30 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
University Park, Centre County.
Design, construction (new space or
addition to and/or renovation of
existing space, including demolition,
abatement of hazardous materials,
extensions and/or upgrading of
utilities and other infrastructure
needs) and other related costs for
electrical interconnection work at
Penn State University Park. This
project will provide a new high-
voltage, electrical interconnection
between electrical substations to
provide a single electrical
distribution network. Funding will be
used for both design and construction
costs, as well as necessary utility
upgrades and extensions, site
improvements and code-related
upgrades. All costs for both occupant
and program relocation or interim
facilities will be included. The
construction will both meet all
current building code requirements and
provide for barrier-free access as
required by the Americans with
Disabilities Act and related codes.
Project Allocation 30,000,000
(F) Former Palmer Museum of Art -
University Park, Centre County.
20250HB1331PN2389 - 31 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Design, construction (new space or
addition to and/or renovation of
existing space, including demolition,
abatement of hazardous materials,
extensions and/or upgrading of
utilities and other infrastructure
needs) and other related costs for the
Former Palmer Museum of Art at Penn
State University Park. The general
project scope is to renew the
originally constructed 1971 and 1990
buildings to meet the new program
which includes both general purpose
classrooms and College of Arts and
Architecture support spaces. Funding
will be used for both design and
construction costs, as well as
necessary utility upgrades and
extensions, site improvements and
code-related upgrades. All costs for
both occupant and program relocation
or interim facilities will be
included. The construction will both
meet all current building code
requirements and provide for barrier-
free access as required by the
Americans with Disabilities Act and
related codes.
Project Allocation 50,000,000
(G) General academic building -
20250HB1331PN2389 - 32 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
University Park, Centre County.
Design, construction (new space or
addition to and/or renovation of
existing space, including demolition,
abatement of hazardous materials,
extensions and/or upgrading of
utilities and other infrastructure
needs) and other related costs for the
renovation of a general academic
building at Penn State University
Park. This project will include
administrative areas, support spaces,
instructional spaces, seminar rooms
and offices. The facility will be
equipped with state-of-the-art
technology. Funding will be used for
both design and construction costs, as
well as necessary utility upgrades and
extensions, site improvements and
code-related upgrades. All costs for
both occupant and program relocation
or interim facilities will be
included. The construction will both
meet all current building code
requirements and provide for barrier-
free access as required by the
Americans with Disabilities Act and
related codes.
Project Allocation 70,000,000
(H) General research building -
20250HB1331PN2389 - 33 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
University Park, Centre County.
Design, construction (new space or
addition to and/or renovation of
existing space, including demolition,
abatement of hazardous materials,
extensions and/or upgrading of
utilities and other infrastructure
needs) and other related costs for the
renovation of a general research
building at Penn State University
Park. This project will include new
research laboratories, support spaces,
instructional spaces, seminar rooms,
offices and administration space. The
facility will be equipped with state-
of-the-art technology. Funding will be
used for both design and construction
costs, as well as necessary utility
upgrades and extensions, site
improvements and code-related
upgrades. All costs for both occupant
and program relocation or interim
facilities will be included. The
construction will both meet all
current building code requirements and
provide for barrier-free access as
required by the Americans with
Disabilities Act and related codes.
Project Allocation 70,000,000
(I) Greenhouses and headhouse complexes
20250HB1331PN2389 - 34 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
relocation (PlantWorks) - University
Park, Centre County. Design,
construction (new space or addition to
and/or renovation of existing space,
including demolition, abatement of
hazardous materials, extensions and/or
upgrading of utilities and other
infrastructure needs) and other
related costs for the relocation of
the greenhouses and headhouse
complexes, also known as PlantWorks,
at Penn State University Park. The
existing, on-campus greenhouses in the
Curtin Road complex will be demolished
and relocated to an all-new research
greenhouse complex on campus. Funding
will be used for both design and
construction costs, as well as
necessary utility upgrades and
extensions, site improvements and
code-related upgrades. All costs for
both occupant and program relocation
or interim facilities will be
included. The construction will both
meet all current building code
requirements and provide for barrier-
free access as required by the
Americans with Disabilities Act and
related codes.
Project Allocation 200,000,000
20250HB1331PN2389 - 35 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(J) Hot water distribution system -
University Park, Centre County.
Design, construction (new space or
addition to and/or renovation of
existing space, including demolition,
abatement of hazardous materials,
extensions and/or upgrading of
utilities and other infrastructure
needs) and other related costs for a
hot water distribution system at Penn
State University Park. This project
will serve as the initial phase of a
transition from steam-based heating to
hot water-based heating. Funding will
be used for both design and
construction costs, as well as
necessary utility upgrades and
extensions, site improvements and
code-related upgrades. All costs for
both occupant and program relocation
or interim facilities will be
included. The construction will both
meet all current building code
requirements and provide for barrier-
free access as required by the
Americans with Disabilities Act and
related codes.
Project Allocation 70,000,000
(K) Millennium Science Complex II -
University Park, Centre County.
20250HB1331PN2389 - 36 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Design, construction (new space or
addition to and/or renovation of
existing space, including demolition,
abatement of hazardous materials,
extensions and/or upgrading of
utilities and other infrastructure
needs) and other related costs for
Millennium Science Complex II at Penn
State University Park. This state-of-
the-art facility will serve as the
'hub' for the Institutes for
Biomedical and Health Sciences and
will push the university to the
forefront of biomedical research.
Funding will be used for both design
and construction costs, as well as
necessary utility upgrades and
extensions, site improvements and
code-related upgrades. All costs for
both occupant and program relocation
or interim facilities will be
included. The construction will both
meet all current building code
requirements and provide for barrier-
free access as required by the
Americans with Disabilities Act and
related codes
Project Allocation 340,000,000
(L) Pasquerilla Spiritual Center -
University Park, Centre County.
20250HB1331PN2389 - 37 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Design, construction (new space or
addition to and/or renovation of
existing space, including demolition,
abatement of hazardous materials,
extensions and/or upgrading of
utilities and other infrastructure
needs) and other related costs for the
Pasquerilla Spiritual Center at Penn
State University Park. The project
will address both numerous building
deficiencies and the maintenance
backlog in the overall facility.
Funding will be used for both design
and construction costs, as well as
necessary utility upgrades and
extensions, site improvements and
code-related upgrades. All costs for
both occupant and program relocation
or interim facilities will be
included. The construction will both
meet all current building code
requirements and provide for barrier-
free access as required by the
Americans with Disabilities Act and
related codes
Project Allocation 25,000,000
(M) Reclaimed water system - University
Park, Centre County. Design,
construction (new space or addition to
and/or renovation of existing space,
20250HB1331PN2389 - 38 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
including demolition, abatement of
hazardous materials, extensions and/or
upgrading of utilities and other
infrastructure needs) and other
related costs for a reclaimed water
system at Penn State University Park.
Use of a reclaimed water system will
greatly reduce the demands of the
University on local groundwater
systems. Funding will be used for both
design and construction costs, as well
as necessary utility upgrades and
extensions, site improvements and
code-related upgrades. All costs for
both occupant and program relocation
or interim facilities will be
included. The construction will both
meet all current building code
requirements and provide for barrier-
free access as required by the
Americans with Disabilities Act and
related codes
Project Allocation 10,500,000
(N) Sackett Building Renovation -
University Park, Centre County.
Additional funding for the design,
construction (new space or addition to
and/or renovation of existing space,
including demolition, abatement of
hazardous materials, extensions and/or
20250HB1331PN2389 - 39 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
upgrading of utilities and other
infrastructure needs) and other
related costs for the Sackett Building
at Penn State University Park. Sackett
Building requires buildingwide renewal
to include building and life safety
system and accessibility upgrades.
Funding will be used for both design
and construction costs, as well as
necessary utility upgrades and
extensions, site improvements and
code-related upgrades. All costs for
both occupant and program relocation
or interim facilities will be
included. The construction will both
meet all current building code
requirements and provide for barrier-
free access as required by the
Americans with Disabilities Act and
related codes
Project Allocation 20,000,000
(O) South chiller plant - heat recovery
chillers - University Park, Centre
County. Design, construction (new
space or addition to and/or renovation
of existing space, including
demolition, abatement of hazardous
materials, extensions and/or upgrading
of utilities and other infrastructure
needs) and other related costs for
20250HB1331PN2389 - 40 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
heat recovery chillers at the South
chiller plant at Penn State University
Park. These heat recovery chillers
would add chilled water capacity and
provide efficiency, energy, resiliency
and operational improvements to the
overall system. Funding will be used
for both design and construction
costs, as well as necessary utility
upgrades and extensions, site
improvements and code-related
upgrades. All costs for both occupant
and program relocation or interim
facilities will be included. The
construction will both meet all
current building code requirements and
provide for barrier-free access as
required by the Americans with
Disabilities Act and related codes
Project Allocation 25,000,000
(P) Systems Renewal Program - University
Park, Centre County. Design,
construction (new space or addition to
and/or renovation of existing space,
including demolition, abatement of
hazardous materials, extensions and/or
upgrading of utilities and other
infrastructure needs) and other
related costs for the Systems Renewal
Program at Penn State University Park.
20250HB1331PN2389 - 41 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
This project will allow the university
to replace, install or upgrade as
appropriate systems in major academic,
research and administrative buildings
across Penn State University Park.
Funding will be used for both design
and construction costs, as well as
necessary utility upgrades and
extensions, site improvements and
code-related upgrades. All costs for
both occupant and program relocation
or interim facilities will be
included. The construction will both
meet all current building code
requirements and provide for barrier-
free access as required by the
Americans with Disabilities Act and
related codes
Project Allocation 120,000,000
(Q) Thermal Energy Storage Tank -
University Park, Centre County.
Design, construction (new space or
addition to and/or renovation of
existing space, including demolition,
abatement of hazardous materials,
extensions and/or upgrading of
utilities and other infrastructure
needs) and other related costs for a
thermal energy storage tank at Penn
State University Park. A thermal
20250HB1331PN2389 - 42 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
energy storage tank will provide much-
needed flexibility and improved
infrastructure to the central chilled
water system, all while saving energy
and reducing the university's overall
carbon footprint. Funding will be used
for both design and construction
costs, as well as necessary utility
upgrades and extensions, site
improvements and code-related
upgrades. All costs for both occupant
and program relocation or interim
facilities will be included. The
construction will both meet all
current building code requirements and
provide for barrier-free access as
required by the Americans with
Disabilities Act and related codes
Project Allocation 50,000,000
(R) XLP Cable Replacement Program -
University Park, Centre County.
Design, construction (new space or
addition to and/or renovation of
existing space, including demolition,
abatement of hazardous materials,
extensions and/or upgrading of
utilities and other infrastructure
needs) and other related costs for the
XLP Cable Replacement Program at Penn
State University Park. Replacement of
20250HB1331PN2389 - 43 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
the faulty, 1980s-era XLP cable is a
significant safety initiative of the
university. Funding will be used for
both design and construction costs, as
well as necessary utility upgrades and
extensions, site improvements and
code-related upgrades. All costs for
both occupant and program relocation
or interim facilities will be
included. The construction will both
meet all current building code
requirements and provide for barrier-
free access as required by the
Americans with Disabilities Act and
related codes
Project Allocation 16,500,000
(S) Classroom/Class Lab Building -
University Park, Centre County.
Additional funding for the design,
construction (new space or addition to
and/or renovation of existing space,
including demolition, abatement of
hazardous materials, extensions and/or
upgrading of utilities and other
infrastructure needs) and other
related costs for a classroom/class
lab building at Penn State University
Park. This project will include new
classrooms, science teaching
laboratories, computer labs, seminar
20250HB1331PN2389 - 44 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
rooms, classroom support space and
teaching auditoria. All costs for both
occupant and program relocation or
interim facilities will be included.
The construction will both meet all
current building code requirements and
provide for barrier-free access as
required by the Americans with
Disabilities Act and related codes
Project Allocation 33,700,000
(T) Systems Renewal Program - Milton S.
Hershey Medical Center, Dauphin
County. Design, construction (new
space or addition to and/or renovation
of existing space, including
demolition, abatement of hazardous
materials, extensions and/or upgrading
of utilities and other infrastructure
needs) and other related costs for the
Systems Renewal Program at the Milton
S. Hershey Medical Center. This
project is part of a continuing effort
to make significant, comprehensive
upgrades to infrastructure in the
College of Medicine facilities at the
Milton S. Hershey Medical Center.
Funding will be used for both design
and construction costs, as well as
necessary utility upgrades and
extensions, site improvements and
20250HB1331PN2389 - 45 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
code-related upgrades. All costs for
both occupant and program relocation
or interim facilities will be
included. The construction will both
meet all current building code
requirements and provide for barrier-
free access as required by the
Americans with Disabilities Act and
related codes
Project Allocation 30,000,000
(U) Water re-use system - Milton S.
Hershey Medical Center, Dauphin
County. Design, construction (new
space or addition to and/or renovation
of existing space, including
demolition, abatement of hazardous
materials, extensions and/or upgrading
of utilities and other infrastructure
needs) and other related costs for a
water re-use system at the Milton S.
Hershey Medical Center. A water re-use
system would treat on-site generated
wastewater in order to re-use the
treated water. Funding will be used
for both design and construction
costs, as well as necessary utility
upgrades and extensions, site
improvements and code-related
upgrades. All costs for both occupant
and program relocation or interim
20250HB1331PN2389 - 46 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
facilities will be included. The
construction will both meet all
current building code requirements and
provide for barrier-free access as
required by the Americans with
Disabilities Act and related codes
Project Allocation 10,000,000
(V) Stone Valley Forestry Building -
University Park, Huntingdon County.
Design, construction (new space or
addition to and/or renovation of
existing space, including demolition,
abatement of hazardous materials,
extensions and/or upgrading of
utilities and other infrastructure
needs) and other related costs for the
Stone Valley Forestry Building at Penn
State University Park. This
opportunity to erect a new, modern and
efficient Stone Valley Forestry
Building will certainly enhance the
Forestland Management Office's ability
to meet its mission, vision and
strategic objectives. Funding will be
used for both design and construction
costs, as well as necessary utility
upgrades and extensions, site
improvements and code-related
upgrades. All costs for both occupant
and program relocation or interim
20250HB1331PN2389 - 47 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
facilities will be included. The
construction will both meet all
current building code requirements and
provide for barrier-free access as
required by the Americans with
Disabilities Act and related codes
Project Allocation 10,000,000
(W) Systems Renewal Program - Statewide
Campuses. Design, construction (new
space or addition to and/or renovation
of existing space, including
demolition, abatement of hazardous
materials, extensions and/or upgrading
of utilities and other infrastructure
needs) and other related costs for the
Systems Renewal Program at the
Commonwealth Campuses. This project
will allow the University to replace,
install or upgrade as appropriate
systems in major academic, research
and administrative buildings across
the Commonwealth Campuses. Funding
will be used for both design and
construction costs, as well as
necessary utility upgrades and
extensions, site improvements and
code-related upgrades. All costs for
both occupant and program relocation
or interim facilities will be
included. The construction will both
20250HB1331PN2389 - 48 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
meet all current building code
requirements and provide for barrier-
free access as required by the
Americans with Disabilities Act and
related codes
Project Allocation 60,000,000
(iv) Temple University
(A) Alternative energy infrastructure -
Main Campus, Philadelphia County.
Design, infrastructure, abatement of
hazardous materials and installation
of alternative energy systems,
including utility upgrades and
extensions, and site improvements at
Temple's domestic campuses
Project Allocation 80,000,000
(B) Energy services facility - Main
Campus, Philadelphia County. Design,
infrastructure, abatement of hazardous
materials and construction or
renovation of a microgrid facility,
including utility upgrades and
extensions, site improvements, code-
related upgrades and ADA compliance-
related upgrades
Project Allocation 125,000,000
(C) Science, Technology, Engineering and
Mathematics (STEM) Academic Building -
Main Campus, Philadelphia County.
Design, infrastructure, abatement of
20250HB1331PN2389 - 49 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
hazardous materials and construction
or renovation of an energy services
facility, including utility upgrades
and extensions, and site improvements
Project Allocation 300,000,000
(D) Facilities and infrastructure renewal
- various campuses, Philadelphia
County. Design, infrastructure,
abatement of hazardous materials, site
improvements and other related costs
for renovations and retrofits to
improve energy efficiency,
sustainability and functionality of
buildings and infrastructure at
domestic campuses
Project Allocation 200,000,000
(E) Interdisciplinary research facility -
Main Campus, Health Sciences Center
Campus or Ambler Campus, Philadelphia
County. Design, infrastructure,
abatement of hazardous materials and
construction or renovation of a
research building, including utility
upgrades and extensions, site
improvements and code-related
upgrades, including ADA compliance-
related upgrades
Project Allocation 250,000,000
(F) Klein Hall - Main Campus,
Philadelphia County. Design,
20250HB1331PN2389 - 50 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
infrastructure, abatement of hazardous
materials and construction of an
academic/administrative building,
including utility upgrades and
extensions, site improvements and
code-related upgrades, including ADA
compliance-related upgrades
Project Allocation 185,000,000
(G) Microgrid facility - Main Campus,
Philadelphia County. Design,
infrastructure, abatement of hazardous
materials and construction or
renovation of a microgrid facility,
including utility upgrades and
extensions, and site improvements
Project Allocation 20,000,000
(H) Multiuse facility - Main Campus,
Philadelphia County. Design,
infrastructure, abatement of hazardous
materials, renovations and addition to
existing historical building for an
adaptive reuse as a multiuse facility,
including utility upgrades and
extensions, site improvements, code-
related upgrades and ADA compliance-
related upgrades.
Project Allocation 50,000,000
(I) Multiuse facility - Main Campus or
Health Sciences Center Campus,
Philadelphia County. Design,
20250HB1331PN2389 - 51 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
infrastructure, abatement of hazardous
materials and construction or
renovation of a multiuse facility,
including utility upgrades and
extensions, site improvements and
code-related upgrades, including ADA
compliance related upgrades
Project Allocation 100,000,000
(J) Storm water management systems - Main
Campus, Philadelphia County. Design,
infrastructure, abatement of hazardous
materials, demolition and installation
of storm water management systems,
including utility upgrades and
extensions, and site improvements at
the Main Campus
Project Allocation 50,000,000
(K) Revitalization of former University
of the Arts facilities - Main Campus,
Philadelphia County. Acquisition,
design, infrastructure improvements,
abatement of hazardous materials,
demolition, renovations and additions
to multiple facilities, including
utility upgrades and extensions, site
improvements, code-related upgrades
and ADA compliance-related upgrades
Project Allocation 300,000,000
(v) Lincoln University
(A) 3020 Market Street, University City
20250HB1331PN2389 - 52 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
District, Philadelphia County.
Renovation and alterations to third
and fourth floor, addition of exterior
signage and alterations, including
land development and site
infrastructure improvements
Project Allocation 2,000,000
(B) Campuswide fire alarm panel upgrades,
Chester County. Fire panel
replacement, upgrades and improvements
of failing and outdated components
throughout campus
Project Allocation 2,000,000
(C) Campuswide infrastructure
improvements, Chester County.
Infrastructure replacement, upgrades
and improvements of failing components
throughout campus
Project Allocation 37,500,000
(D) Campuswide Security Improvements,
Chester County. Active shooter
hardware upgrades for building doors
throughout campus
Project Allocation 750,000
(E) Campuswide HVAC Improvements, Chester
County. HVAC replacement, upgrades and
improvements of failing components
throughout campus
Project Allocation 856,000
(F) Center for Black Culture, Chester
20250HB1331PN2389 - 53 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
County. Renovation, new construction
and alterations, including land
development and site infrastructure
improvements
Project Allocation 25,000,000
(G) Faculty and staff housing upgrades,
Chester County. Renovation, new
construction and alterations,
including land development and site
infrastructure improvements
Project Allocation 5,000,000
(H) Heritage Center, Chester County.
Renovation, new construction,
alterations and site infrastructure
improvements for addition
Project Allocation 750,000
(I) Historic District, Chester County.
Renovation, new construction and
alterations, including land
development and site infrastructure
improvements
Project Allocation 12,500,000
(J) Houston Hall, Chester County.
Renovation, new construction and
alterations, including land
development and site infrastructure
improvements
Project Allocation 25,000,000
(K) Lincoln Hall, Chester County.
Renovation, new construction and
20250HB1331PN2389 - 54 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
alterations, including land
development and site infrastructure
improvements
Project Allocation 30,000,000
(L) Lucy Laney, Library and Amos House,
Chester County. Renovation, new
construction, alterations and site
infrastructure upgrades and
improvements
Project Allocation 10,000,000
(M) Manuel Rivero (Hall) Gymnasium,
Chester County. Renovation, new
construction and alterations,
including land development and site
infrastructure improvements
Project Allocation 45,570,000
(N) McCauley Hall, Chester County.
Renovation, new construction and
alterations, including land
development and site infrastructure
improvements
Project Allocation 31,250,000
(O) McRary Hall, Chester County.
Renovation, new construction and
alterations, including land
development and site infrastructure
improvements
Project Allocation 33,000,000
(P) Nelson Science Center, Chester
County. Renovation, new construction
20250HB1331PN2389 - 55 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
and alterations, including land
development and site infrastructure
improvements
Project Allocation 25,000,000
(Q) Perimeter road, Chester County.
Perimeter road reconfiguration and new
guard booth
Project Allocation 6,000,000
(R) Physical plant, Chester County.
Renovation, new construction and
alterations, including land
development and site infrastructure
improvements
Project Allocation 15,000,000
(S) New residence hall - Chester County.
Renovation, new construction and
alterations, including land
development and site infrastructure
improvements
Project Allocation 62,500,000
(T) Thurgood Marshall Living Learning
Center, Chester County. HVAC
replacement, upgrades and improvements
of failing components
Project Allocation 12,678,000
(U) University Hall, Chester County.
Renovation, new construction and
alterations, including land
development and site infrastructure
improvements
20250HB1331PN2389 - 56 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 31,250,000
(V) Ware Center for the Performing Arts,
Chester County. Renovation, new
construction and alterations,
including land development and site
infrastructure improvements
Project Allocation 31,250,000
(vi) Thaddeus Stevens College of Technology
(A) Cottage and Orange Street houses,
Lancaster County. Renovations,
alterations, infrastructure upgrades
and associated design and construction
to update and provide for missing and
outdated safety and security equipment
Project Allocation 6,000,000
(B) Griscom Learning Center and Orange
Street Campus, Lancaster County.
Renovations, repairs, alterations,
additions, infrastructure upgrades,
HVAC improvements and associated
design and construction
Project Allocation 14,400,000
(C) Hartzell Building, Lancaster County.
Renovation, replacement and upgrade of
all systems, roof, HVAC,
infrastructure and interiors to
standards and code, including
alterations, new construction,
infrastructure upgrades and associated
design and construction
20250HB1331PN2389 - 57 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 17,250,000
(D) Historic Almshouse Building,
Lancaster County. Renovations,
repairs, alterations, additions,
infrastructure upgrades and associated
design and construction
Project Allocation 24,150,000
(E) Jones Building, Lancaster County.
Renovations, alterations, additions,
infrastructure upgrades, site
improvements, HVAC improvements and
associated design and construction
Project Allocation 16,000,000
(F) Mellor Building, Lancaster County.
Renovations, alterations, additions,
infrastructure upgrades, site
improvements, exterior painting and
associated design and construction
Project Allocation 113,000,000
(G) Multipurpose activity center
building, Lancaster County.
Replacement and upgrade of campus
athletic center roof
Project Allocation 6,000,000
(H) Schwalm Building Student Center,
Lancaster County. Renovate existing
facility to provide expanded and
improved student center adjacent to
planned new dormitory and dining
facility
20250HB1331PN2389 - 58 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 15,350,000
(I) Snyder Building, Lancaster County.
Renovations, alterations, additions,
infrastructure upgrades, site
improvements and associated design and
construction
Project Allocation 22,000,000
(J) Warehouse, Lancaster County.
Renovations and upgrades to main
central warehouse, including roof,
mechanical and exterior upgrades
Project Allocation 4,600,000
(K) Dormitories, campuswide, Lancaster
County. Renovations, alterations,
repairs, infrastructure upgrades and
associated design and construction,
including HVAC improvements
Project Allocation 36,000,000
(L) Improvements, campuswide, Lancaster
County. Improvements to meet current
and future demands, including land
acquisition, site and building
infrastructure improvements, new
construction, renovations, additions
and building system upgrades and
improvements, including associated
design and construction
Project Allocation 34,000,000
(M) Safety and security upgrades,
campuswide, Lancaster County.
20250HB1331PN2389 - 59 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Renovations, alterations,
infrastructure upgrades and associated
design and construction to update and
provide for missing and outdated
safety and security equipment,
including replacement and upgrade of
door entrances, swipe card systems and
camera monitoring systems
Project Allocation 12,000,000
(N) Safety and security upgrades,
campuswide, Lancaster County.
Renovations, alterations,
infrastructure upgrades and associated
design and construction to update and
provide for missing and outdated
safety and security equipment,
including replacement of missing and
outdated lighting and equipment
Project Allocation 6,000,000
(O) Sidewalks and roads, campuswide,
Lancaster County. Sidewalk and road
repairs
Project Allocation 6,000,000
(vii) Beaver County Community College School
of Aviation
(A) Construction, infrastructure,
redevelopment, renovation and other
related costs for hangars and
facilities, classrooms and a control
tower at the Beaver County Community
20250HB1331PN2389 - 60 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
College School of Aviation in Chippewa
Township
Project Allocation 3,750,000
(5) Pennsylvania Emergency Management Agency
(i) Headquarters building, Dauphin County
(A) Infrastructure improvements,
including replacement of electrical
switch gear
Project Allocation 6,000,000
(B) Renovations, alterations and new
construction, including site
improvements
Project Allocation 5,000,000
(ii) Western Area Office, Indiana County
(A) Construction of a state-of-the-art
emergency operations and coordination
center in the western area of this
Commonwealth, including land
acquisition, site development and
infrastructure improvements
Project Allocation 6,000,000
(iii) State Fire Academy, Mifflin County
(A) Construction of a state-of-the-art
training facility, including land
acquisition, site development and
infrastructure improvements
Project Allocation 10,000,000
(iv) Special Operations Center
(A) Construction of a state-of-the-art
training facility, including land
20250HB1331PN2389 - 61 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
acquisition, site development and
infrastructure improvements
Project Allocation 95,000,000
(6) Department of Environmental Protection
(i) Pitcairn Borough Flood Control Project,
Allegheny County
(A) New flood protection project along
Dirty Camp Run
Project Allocation 4,000,000
(ii) Streets Run Flood Control Project,
Allegheny County
(A) New flood protection project along
Streets Run
Project Allocation 20,000,000
(iii) New Kernsville, Berks County
(A) Demolition of warehouse structure and
scrap removal
Project Allocation 700,000
(iv) Northern Cambria Borough flood control,
Cambria County
(A) Rehabilitation project
Project Allocation 2,400,000
(v) Wilmore Borough Flood Protection Project,
Cambria County
(A) New levee project along Little
Conemaugh River and North Branch of
Little Conemaugh River
Project Allocation 3,000,000
(vi) Solomon Run Flood Protection Project,
Cambria County
20250HB1331PN2389 - 62 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) Rehabilitation project
Project Allocation 10,000,000
(vii) Saint Clair Run Flood Protection
Project, Cambria County
(A) Rehabilitation project
Project Allocation 2,000,000
(viii) Sam's Run Flood Protection Project,
Cambria County
(A) Rehabilitation project
Project Allocation 7,000,000
(ix) Pine Glen/Avery Cola Company, Centre
County
(A) Upgrade and rebuild aging lime plant
used to treat acid mine drainage
Project Allocation 3,700,000
(x) Alder Run/Thompson Brother Coal Company,
Centre County
(A) Upgrade and rebuild aging lime plant
used to treat acid mine drainage
Project Allocation 2,700,000
(xi) Fye/Larry D. Baumgardner Coal Company,
Centre County
(A) Construction of a chemical treatment
system to treat acid mine drainage
Project Allocation 1,350,000
(xii) Timothy A. Keck/Keck 1, Clarion County
(A) Reclamation of dangerous highwalls
and revegetation of the site
Project Allocation 1,100,000
(xiii) Buck Run/Al Hamilton Treatment Trust,
20250HB1331PN2389 - 63 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Clearfield County
(A) Upgrade and rehabilitate failing
passive treatment system
Project Allocation 600,000
(xiv) Reed/Sky Haven Treatment Trust,
Clearfield County
(A) Upgrade and rehabilitate failing
passive treatment system
Project Allocation 425,000
(xv) Manor Mine/Al Hamilton Treatment Trust,
Clearfield County
(A) Upgrade and rebuild aging lime plant
used to treat acid mine drainage
Project Allocation 5,175,000
(xvi) Stinky Run Flood Control Project,
Clearfield County
(A) Culvert project
Project Allocation 6,000,000
(xvii) Big Run/Avery Coal, Clinton County
(A) Rehabilitate failing passive
treatment system
Project Allocation 2,000,000
(xvii.1) Rachel Carson State Office Building,
Dauphin County
(A) Statewide projects for space
consolidation efforts
Project Allocation 11,000,000
(xviii) Isabella Mine Site, Fayette County
(A) Comprehensive reclamation project to
address land reclamation, primary
20250HB1331PN2389 - 64 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
discharge structure and conveyance
channel for freshwater impoundment
and AMD discharge collection and
treatment system
Project Allocation 25,000,000
(xix) Brockway Clay Company, Jefferson County
(A) Reclamation of two abandoned noncoal
mining permits
Project Allocation 1,480,000
(xx) Weisner Hollow Slurry Dam Reclamation,
Jefferson County
(A) Regrade a stream channel and close
off a coal refuse channel, including
the overflow channels
Project Allocation 27,200,000
(xxi) Hull Creek, Lackawanna County
(A) Rehabilitation project
Project Allocation 1,000,000
(xxii) Roaring Brook Flood Protection
Project, Lackawanna County
(A) Rehabilitation project
Project Allocation 11,000,000
(xxiii) Ashley - Sulfur Run, Luzerne County
(A) Flood protection project
Project Allocation 6,000,000
(xxiv) Brown Creek Flood Protection Project,
Luzerne County
(A) Rehabilitation project
Project Allocation 10,000,000
(xxv) 21st Centuramics, McKean County
20250HB1331PN2389 - 65 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) Reclamation of dangerous highwalls
and revegetation of the site
Project Allocation 2,860,000
(xxvi) Port Allegany Borough Flood Control,
McKean County
(A) Levee project
Project Allocation 25,000,000
(xxvii) Glenside Area Flood Protection
Project, Montgomery County
(A) Flood protection project
Project Allocation 5,000,000
(xxviii) Flat Rock Dam facilities,
Philadelphia County
(A) Rehabilitation of canal wall and
erosion protection
Project Allocation 19,600,000
(xxix) Auburn Dam, Schuylkill County
(A) Dewatering outfall structure for the
dam and dredging/desilting of the
reservoir
Project Allocation 63,600,000
(xxx) Auburn Dam, Schuylkill County
(A) Rehabilitation of warehouse and scrap
removal
Project Allocation 700,000
(xxxi) Tamaqua Dam facilities, Schuylkill
County
(A) Demolition of warehouse and scrap
removal
Project Allocation 700,000
20250HB1331PN2389 - 66 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(xxxi.1) Elkland Borough Flood Protection
Project, Tioga County
(A) Flood protection project
Project Allocation 17,000,000
(xxxi.2) Harvey's Lake - Wordon Place Flood
Protection Project, Tioga County
(A) Rehabilitation of flood protection
project
Project Allocation 2,000,000
(xxxii) S&K Energy, Inc., Lounder Mine,
Washington County
(A) Reclamation of highwalls and
revegetate the site
Project Allocation 3,220,000
(xxxiii) Banning #4 and Euclid Combination
Treatment Facility, Westmoreland County
(A) Combination treatment facility will
be constructed to eliminate the two
independent facilities that maintain
the underground mine pool
Project Allocation 22,000,000
(xxxiv) Northmont Area-Greensburg City Flood
Control, Westmoreland County
(A) Culvert channel and culvert
improvement
Project Allocation 5,000,000
(xxxv) Jeannette - Brush Creek, Westmoreland
County
(A) Rehabilitation and extension of levee
and floodwall flood protection system
20250HB1331PN2389 - 67 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 5,000,000
(xxxvi) Flood Protection Reconstruction
Project, Statewide
(A) Reconstruction of multiple existing
levee street and railroad closure
projects
Project Allocation 30,000,000
(xxxvii) New laboratory
(A) Construction of new laboratory,
including site and infrastructure
improvements and land acquisition
Project Allocation 45,500,000
(7) Department of General Services
(i) Pedestrian bridges, Dauphin County
(A) Construction of bridges across
Forster Street and 7th Street,
including site acquisition and land
development, design and construction
and utility work
Project Allocation 45,000,000
(i.1) State Street Bridge, Dauphin County
(A) Renovations and improvement to State
Street Bridge
Project Allocation 50,000,000
(ii) Warehouse and fleet garage
(A) Construction of warehouse and garage
facilities, including auxiliary
support buildings, site acquisition
and land development, design and
construction and utility work
20250HB1331PN2389 - 68 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 200,000,000
(iii) Statewide
(A) Renovations, alterations,
construction, site improvements,
infrastructure upgrades and land
acquisition for Department of General
Services-owned buildings and
structures
Project Allocation 200,000,000
(B) Design and construct solar panel and
electric vehicle charging stations at
Commonwealth facilities, including
land acquisition and site and utility
work
Project Allocation 10,000,000
(C) Professional services for the
development of agency facility
strategic master plans and capital
planning
Project Allocation 40,000,000
(8) Department of Health
(i) Bureau of Laboratories
(A) Construct new laboratory, including
site and infrastructure improvements
and land acquisition
Project Allocation 30,500,000
(9) Pennsylvania Historical and Museum
Commission
(i) Fort Pitt, Allegheny County
(A) Building, site and infrastructure
20250HB1331PN2389 - 69 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
improvements
Project Allocation 1,000,000
(ii) Old Economy Village, Beaver County
(A) Exhibit upgrades
Project Allocation 2,000,000
(iii) Conrad Weiser Homestead, Berks County
(A) Building, site and infrastructure
improvements
Project Allocation 5,000,000
(B) Exhibit improvements
Project Allocation 1,500,000
(iv) Daniel Boone Homestead, Berks County
(A) Building, site and infrastructure
improvements
Project Allocation 10,000,000
(v) Pennsbury Manor, Bucks County
(A) Building, infrastructure and site
improvements
Project Allocation 10,000,000
(vi) Eckley Miners Village, Carbon County
(A) Building, site and infrastructure
improvements
Project Allocation 10,000,000
(vii) Pennsylvania Military Museum, Centre
County
(A) Building, site and infrastructure
improvements
Project Allocation 10,000,000
(viii) State Museum of Pennsylvania, Dauphin
County
20250HB1331PN2389 - 70 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) Building, site and infrastructure
improvements
Project Allocation 20,000,000
(B) Exhibit improvements
Project Allocation 30,000,000
(ix) State Archives, Dauphin County
(A) Building, site and infrastructure
improvements
Project Allocation 4,000,000
(x) Anthracite Heritage Museum, Lackawanna
County
(A) Building, site and infrastructure
improvements
Project Allocation 10,000,000
(xi) Landis Valley Village and Farm Museum,
Lancaster County
(A) Building, site and infrastructure
improvements
Project Allocation 10,000,000
(xii) Railroad Museum of Pennsylvania,
Lancaster County
(A) Exhibit upgrades
Project Allocation 2,000,000
(B) Building, site and infrastructure
improvements
Project Allocation 10,000,000
(xiii) Cornwall Iron Furnace, Lebanon County
(A) Building, site and infrastructure
improvements
Project Allocation 5,000,000
20250HB1331PN2389 - 71 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(B) Exhibit improvements
Project Allocation 2,000,000
(xiv) Hope Lodge, Montgomery County
(A) Building, site and infrastructure
improvements
Project Allocation 3,000,000
(xv) Joseph Priestley House, Northumberland
County
(A) Building, site and infrastructure
improvements
Project Allocation 1,000,000
(xvi) Pennsylvania Lumber Museum, Potter
County
(A) Building, site and infrastructure
improvements
Project Allocation 5,000,000
(xvii) Somerset Historical Center, Somerset
County
(A) Building, site and infrastructure
improvements
Project Allocation 3,000,000
(B) Exhibit upgrades
Project Allocation 1,000,000
(xviii) Drake Well Museum, Venango County
(A) Building, site and infrastructure
improvements
Project Allocation 10,000,000
(xix) Bushy Run Battlefield, Westmoreland
County
(A) Building, site and infrastructure
20250HB1331PN2389 - 72 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
improvements
Project Allocation 7,000,000
(B) Exhibit improvements
Project Allocation 2,000,000
(xx) Statewide historic sites
(A) Renovations, alterations and site
upgrades for long-term maintenance,
ADA, code and energy improvements
Project Allocation 15,000,000
(10) Department of Human Services
(i) Wernersville State Hospital, Berks County
(A) Renovate the institution, including
new construction, alterations,
renovations, site improvements and
infrastructure upgrades and land
acquisition
Project Allocation 50,000,000
(ii) Western Secure Treatment Unit, Butler
County
(A) Renovate the institution, including
new construction, alterations,
renovations, site improvements and
infrastructure upgrades and land
acquisition
Project Allocation 50,000,000
(iii) Ebensburg Center, Cambria County
(A) Renovate the institution, including
new construction, alterations,
renovations, site improvements and
infrastructure upgrades and land
20250HB1331PN2389 - 73 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
acquisition
Project Allocation 50,000,000
(iv) South Mountain Restoration Center,
Franklin County
(A) Renovate the institution, including
new construction, alterations,
renovations, site improvements and
infrastructure upgrades and land
acquisition
Project Allocation 50,000,000
(v) South Mountain Secure Treatment Unit,
Franklin County
(A) Renovate the institution, including
new construction, alterations,
renovations, site improvements and
infrastructure upgrades and land
acquisition
Project Allocation 50,000,000
(vi) Youth Forestry Camp No. 3, Huntingdon
County
(A) Renovate the institution, including
new construction, alterations,
renovations, site improvements and
infrastructure upgrades and land
acquisition
Project Allocation 50,000,000
(vii) Clarks Summit State Hospital,
Lackawanna County
(A) Renovate the institution, including
new construction, alterations,
20250HB1331PN2389 - 74 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
renovations, site improvements and
infrastructure upgrades and land
acquisition
Project Allocation 50,000,000
(viii) North East Secure Treatment Unit,
Luzerne County
(A) Renovate the institution, including
new construction, alterations,
renovations, site improvements and
infrastructure upgrades and land
acquisition
Project Allocation 50,000,000
(ix) Norristown State Hospital, Montgomery
County
(A) Renovate the institution, including
new construction, alterations,
renovations, site improvements and
infrastructure upgrades and land
acquisition
Project Allocation 50,000,000
(B) Additional funds for the design and
construction of a psychiatric forensic
building on existing lands of the
Commonwealth at Norristown State
Hospital in West Norriton Township to
be utilized for the care and treatment
of clients admitted to the institution
Project Allocation 250,000,000
(x) South East Youth Development Center,
Montgomery County
20250HB1331PN2389 - 75 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) Renovate the institution, including
new construction, alterations,
renovations, site improvements and
infrastructure upgrades and land
acquisition
Project Allocation 50,000,000
(xi) Danville State Hospital, Montour County
(A) Renovate the institution, including
new construction, alterations,
renovations, site improvements and
infrastructure upgrades and land
acquisition
Project Allocation 50,000,000
(xii) North Central Secure Treatment Unit,
Montour County
(A) Renovate the institution, including
new construction, alterations,
renovations, site improvements and
infrastructure upgrades and land
acquisition
Project Allocation 50,000,000
(xiii) Loysville Youth Development Center,
Perry County
(A) Renovate the institution, including
new construction, alterations,
renovations, site improvements and
infrastructure upgrades and land
acquisition
Project Allocation 50,000,000
(xiv) Selinsgrove Center, Snyder County
20250HB1331PN2389 - 76 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) Renovate the institution, including
new construction, alterations,
renovations, site improvements and
infrastructure upgrades and land
acquisition
Project Allocation 50,000,000
(xv) Warren State Hospital, Warren County
(A) Renovate the institution, including
new construction, alterations,
renovations, site improvements and
infrastructure upgrades and land
acquisition
Project Allocation 50,000,000
(xvi) Torrance State Hospital, Westmoreland
County
(A) Renovate the institution, including
new construction, alterations,
renovations, site improvements and
infrastructure upgrades and land
acquisition
Project Allocation 50,000,000
(11) Department of Military and Veterans Affairs
(i) Gettysburg Readiness Center, Adams County
(A) Renovate the Readiness Center,
including demolition, new
construction, correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 20,000,000
(ii) Combined Support Maintenance Shop, West
20250HB1331PN2389 - 77 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Pittsburgh, Allegheny County
(A) Renovate the facilities, including
demolition, new construction,
correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 25,000,000
(iii) Pittsburgh Crane Readiness Center,
Allegheny County
(A) Renovate the Readiness Center,
including demolition, new
construction, correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 15,000,000
(iv) Ford City Readiness Center, Armstrong
County
(A) Renovate the Readiness Center,
including demolition, new
construction, correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 15,000,000
(v) Beaver Falls Readiness Center, Beaver
County
(A) Renovate the Readiness Center,
including demolition, new
construction, correcting structure and
infrastructure deficiencies and
security system upgrades
20250HB1331PN2389 - 78 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 10,000,000
(vi) Bedford Readiness Center land, Bedford
County
(A) Acquisition of land and/or facilities
to build or renovate buildings for a
new Readiness Center
Project Allocation 5,000,000
(vii) Berks County Readiness Centers, Berks
County
(A) Renovate the Readiness Centers,
including demolition, new
construction, correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 10,000,000
(viii) Hollidaysburg Readiness Center, Blair
County
(A) Renovate the Readiness Center,
including demolition, new
construction, correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 27,000,000
(ix) Bucks County Readiness Centers, Bucks
County
(A) Renovate the Readiness Centers,
including demolition, new
construction, correcting structure and
infrastructure deficiencies and
security system upgrades
20250HB1331PN2389 - 79 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 62,000,000
(x) Bucks County Readiness Centers and
maintenance facilities, Bucks County
(A) Renovate the facilities, including
demolition, new construction,
correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 15,000,000
(xi) Butler Readiness Center, Butler County
(A) Renovate the Readiness Center,
including demolition, new
construction, correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 25,000,000
(xii) Cambria County Readiness Centers,
Cambria County
(A) Renovate the Readiness Centers,
including demolition, new
construction, correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 35,000,000
(xiii) Cambria County Readiness Centers and
maintenance facilities, Cambria County
(A) Renovate the facilities, including
demolition, new construction,
correcting structure and
infrastructure deficiencies and
20250HB1331PN2389 - 80 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
security system upgrades
Project Allocation 10,000,000
(xiv) New Cambria Readiness Center, Cambria
County
(A) Acquisition of land and/or facilities
to build or renovate buildings for a
new Readiness Center
Project Allocation 5,000,000
(xv) Lehighton Readiness Center, Carbon
County
(A) Renovate the Readiness Center,
including demolition, new
construction, correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 20,000,000
(xvi) Centre County Readiness Centers, Centre
County
(A) Renovate the Readiness Centers,
including demolition, new
construction, correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 12,000,000
(xvii) Centre County Readiness Centers and
maintenance facilities, Centre County
(A) Renovate the facilities, including
demolition, new construction,
correcting structure and
infrastructure deficiencies and
20250HB1331PN2389 - 81 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
security system upgrades
Project Allocation 20,000,000
(xviii) State College Army and Air Readiness
Center, Centre County
(A) Renovate the Readiness Center,
including demolition, new
construction, correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 10,000,000
(xix) Chester County Readiness Centers,
Chester County
(A) Renovate the Readiness Centers,
including demolition, new
construction, correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 25,000,000
(xx) Chester County Readiness Centers and
maintenance facilities, Chester County
(A) Renovate the facilities, including
demolition, new construction,
correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 15,000,000
(xxi) Southeastern Veterans Center, Spring
City, Chester County
(A) Construction of new replacement
Community Living Center
20250HB1331PN2389 - 82 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 14,400,000
(xxii) Clearfield Readiness Center,
Clearfield County
(A) Renovate the Readiness Center,
including demolition, new
construction, correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 15,000,000
(xxiii) Lock Haven Readiness Center, Clinton
County
(A) Renovate the Readiness Center,
including demolition, new
construction, correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 19,000,000
(xxiv) Crawford County Readiness Centers and
maintenance facilities, Crawford County
(A) Renovate the facilities, including
demolition, new construction,
correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 15,000,000
(xxv) Carlisle Readiness Center, Cumberland
County
(A) Renovate the Readiness Center,
including demolition, new
construction, correcting structure and
20250HB1331PN2389 - 83 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
infrastructure deficiencies and
security system upgrades
Project Allocation 15,000,000
(xxvi) Cumberland Readiness Centers and
maintenance facilities, Cumberland County
(A) Renovate the facilities, including
demolition, new construction,
correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 15,000,000
(xxvii) Dauphin County Readiness Centers,
Dauphin County
(A) Renovate the Readiness Centers,
including demolition, new
construction, correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 60,000,000
(xxviii) Erie Readiness Center, Erie County
(A) Renovate the Readiness Center,
including demolition, new
construction, correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 70,000,000
(xxix) Fayette County Readiness Centers,
Fayette County
(A) Renovate the Readiness Center,
including demolition, new
20250HB1331PN2389 - 84 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
construction, correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 20,000,000
(xxx) Chambersburg Readiness Center, Franklin
County
(A) Renovate the Readiness Center,
including demolition, new
construction, correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 5,000,000
(xxxi) Indiana Readiness Center, Indiana
County
(A) Renovate the Readiness Center,
including demolition, new
construction, correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 12,000,000
(xxxii) Carbondale Readiness Center,
Lackawanna County
(A) Renovate the Readiness Center,
including demolition, new
construction, correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 15,000,000
(xxxiii) Lackawanna County Readiness
Center/Field Maintenance Shop, Lackawanna
20250HB1331PN2389 - 85 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
County
(A) Renovate facilities, including
demolition, new construction,
correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 15,000,000
(xxxiv) Scranton Maintenance Shop, Lackawanna
County
(A) Renovate the facilities, including
new construction, correcting structure
and infrastructure deficiencies and
security system upgrades
Project Allocation 10,000,000
(xxxv) Elizabethtown Readiness Center,
Lancaster County
(A) Renovate the Readiness Center,
including demolition, new
construction, correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 22,000,000
(xxxvi) New Castle Readiness Center, Lawrence
County
(A) Renovate the Readiness Center,
including demolition, new
construction, correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 65,000,000
20250HB1331PN2389 - 86 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(xxxvii) Fort Indiantown Gap, Lebanon County
(A) Renovate facilities, including
demolition, new construction,
correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 140,000,000
(B) Acquisition of privately owned
properties within boundaries of Fort
Indiantown Gap for training and
activities of the installation
Project Allocation 8,000,000
(C) Purchase in-holdings on Fort
Indiantown Gap property and/or
surrounding property for Joint Land
Use agreements/Army Compatible Use
Buffers, including acquisition of land
Project Allocation 8,000,000
(xxxviii) New Lehigh County Readiness Center,
Lehigh County
(A) Acquisition of land and/or facilities
to build or renovate buildings for a
new readiness center
Project Allocation 10,000,000
(xxxix) New Lehigh County Readiness Center,
Lehigh County
(A) Acquisition of land and/or facilities
to build or renovate buildings for a
new readiness center
Project Allocation 10,000,000
20250HB1331PN2389 - 87 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(xl) Allentown Readiness Center, Lehigh
County
(A) Renovate the Readiness Center,
including demolition, new
construction, correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 70,000,000
(xli) Luzerne County Readiness Centers,
Luzerne County
(A) Renovate the Readiness Centers,
including demolition, new
construction, correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 75,000,000
(xlii) New Luzerne County Readiness Center,
Luzerne County
(A) Acquisition of land and/or facilities
to build or renovate buildings for a
new readiness center
Project Allocation 15,000,000
(xliii) Williamsport Readiness Center,
Lycoming County
(A) Renovate the Readiness Center,
including demolition, new
construction, correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 15,000,000
20250HB1331PN2389 - 88 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(xliv) Mercer County Readiness Centers,
Mercer County
(A) Renovate the Readiness Centers,
including demolition, new
construction, correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 30,000,000
(xlv) Mercer County Readiness Centers and
maintenance facilities, Mercer County
(A) Renovate the facilities, including
demolition, new construction,
correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 15,000,000
(xlvi) Montgomery County Readiness Centers,
Montgomery County
(A) Renovate the Readiness Centers,
including demolition, new
construction, correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 25,000,000
(xlvii) Montgomery Readiness Centers and
maintenance facilities, Montgomery County
(A) Renovate the facilities, including
demolition, new construction,
correcting structure and
infrastructure deficiencies and
20250HB1331PN2389 - 89 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
security system upgrades
Project Allocation 50,000,000
(xlviii) Danville Field Maintenance Building,
Montour County
(A) Renovate facilities, including new
construction, correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 5,000,000
(xlix) Montour County Readiness Centers and
maintenance facilities, Montour County
(A) Renovate the facilities, including
demolition, new construction,
correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 10,000,000
(l) Easton Readiness Center, Northampton
County
(A) Renovate facilities, including new
construction, correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 20,000,000
(li) Philadelphia County Readiness Centers,
Philadelphia County
(A) Renovate the Readiness Centers,
including demolition, new
construction, correcting structure and
infrastructure deficiencies and
20250HB1331PN2389 - 90 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
security system upgrades
Project Allocation 30,000,000
(lii) Schuylkill Readiness Center, Schuylkill
County
(A) Renovate the Readiness Center,
including demolition, new
construction, correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 20,000,000
(liii) Friedens Readiness Center, Somerset
County
(A) Renovate the Readiness Centers,
including demolition, new
construction, correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 10,000,000
(liv) Washington County Readiness Centers,
Washington County
(A) Renovate the Readiness Centers,
including demolition, new
construction, correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 17,000,000
(lv) Honesdale Readiness Center, Wayne County
(A) Renovate the Readiness Center,
including demolition, new
construction, correcting structure and
20250HB1331PN2389 - 91 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
infrastructure deficiencies and
security system upgrades
Project Allocation 5,000,000
(lvi) Westmoreland County Readiness Centers,
Westmoreland County
(A) Renovate the Readiness Centers,
including demolition, new
construction, correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 55,000,000
(lvii) York County Readiness Centers, York
County
(A) Renovate the Readiness Centers,
including demolition, new
construction, correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 10,000,000
(lviii) New Central Pennsylvania Readiness
Center
(A) Acquisition of land and/or facilities
to build or renovate buildings for a
new readiness center
Project Allocation 10,000,000
(lix) New Northeastern Pennsylvania Readiness
Center
(A) Acquisition of land and/or facilities
to build or renovate buildings for a
new readiness center
20250HB1331PN2389 - 92 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 2,000,000
(lx) New Southeastern Pennsylvania Readiness
Center
(A) Acquisition of land and/or facilities
to build or renovate buildings for a
new readiness center
Project Allocation 30,000,000
(lxi) Veterans Homes, Statewide
(A) Feasibility study, design and
construction of building upgrades.
Demolition, renovation, general
repairs and expansion, including land
development and site infrastructure
improvements of the six Veterans Homes
Project Allocation 126,000,000
(lxii) Military and Veterans Affairs
buildings, Statewide
(A) Improvements, including the addition
of veterans outreach centers, to
provide services in areas that have
demonstrated the greatest need
Project Allocation 21,000,000
(12) Office of Administration
(i) Commonwealth Technology Center, Dauphin
County
(A) Miscellaneous replacement of building
systems equipment, including
mechanical, electrical and plumbing
equipment
Project Allocation 11,500,000
20250HB1331PN2389 - 93 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(B) UPS system replacement. Miscellaneous
replacement of building systems
equipment, including mechanical,
electrical and plumbing equipment
Project Allocation 2,500,000
(13) Pennsylvania State Police
(i) Pennsylvania State Police Academy,
Dauphin County
(A) Rehabilitate the Academy complex,
including site acquisition and
development
Project Allocation 163,000,000
(ii) Regional forensic laboratory
(A) Renovate and/or construct new
laboratory in Central Pennsylvania,
including site and infrastructure
improvements and land acquisition
Project Allocation 90,500,000
(iii) Statewide
(A) Capital renewal of facilities and new
construction, including site and
building improvements, interior
renovations, building system upgrades,
code-required improvements, security
enhancements such as perimeter fencing
and upgrade or replacement of fueling
stations, including, if applicable,
establishment of electric vehicle
charging stations
Project Allocation 200,000,000
20250HB1331PN2389 - 94 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(B) Land acquisition or purchase of
facility to replace buildings or
provide new facilities to further the
mission of the State Police, to
include exercising an option to
purchase real property contained in a
lease that was fully executed before
the effective date of this statute,
and deemed in the best interest of the
Commonwealth and State Police
Project Allocation 250,000,000
(14) State System of Higher Education
(i) Commonwealth University
(A) Lock Haven University, Clinton
County. Renovation, replacement or
upgrades to campus infrastructure.
Project Allocation 20,000,000
(B) Lock Haven University, Clinton
County. Renovation, new construction,
alterations and infrastructure
upgrades to Stevenson Library
Project Allocation 25,000,000
(C) Bloomsburg University, Columbia
County. Renovation, replacement or
upgrades to campus infrastructure
Project Allocation 30,000,000
(D) Mansfield University, Tioga County.
Provide for deferred maintenance needs
and capital renewal repairs
Project Allocation 20,000,000
20250HB1331PN2389 - 95 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(ii) PennWest University
(A) Clarion, Clarion County. Renovation,
replacement or upgrades to campus
infrastructure
Project Allocation 15,000,000
(B) Clarion, Clarion County.
Construction, renovation and
acquisition of student housing
facilities
Project Allocation 29,000,000
(C) Edinboro, Erie County. Renovation,
replacement or upgrades to campus
infrastructure
Project Allocation 40,000,000
(D) Edinboro, Erie County. Construction,
renovation and acquisition of student
housing facilities
Project Allocation 23,000,000
(E) California, Washington County.
Renovation, replacement or upgrades to
campus infrastructure
Project Allocation 15,000,000
(F) California, Washington County.
Construction, renovation and
acquisition of student housing
facilities
Project Allocation 30,000,000
(iii) Kutztown University, Berks County
(A) Demolition of underutilized and
obsolete buildings
20250HB1331PN2389 - 96 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 30,000,000
(B) Renovations, new construction,
alterations and infrastructure
upgrades to Old Main
Project Allocation 15,000,000
(C) Renovations, new construction,
alterations and infrastructure
upgrades
Project Allocation 15,000,000
(iv) Slippery Rock University, Butler County
(A) Renovations, new construction,
alterations and infrastructure
upgrades to Eisenberg classroom
building
Project Allocation 40,000,000
(B) Renovation, replacement or upgrade of
campus infrastructure
Project Allocation 40,000,000
(v) West Chester University, Chester County
(A) Renovation, replacement or upgrade of
campus infrastructure
Project Allocation 40,000,000
(vi) Cheyney University, Chester and Delaware
Counties
(A) Renovation, replacement or upgrades
to campus infrastructure
Project Allocation 25,000,000
(B) Renovations, new construction,
alterations and infrastructure
upgrades to Dudley Center for the Arts
20250HB1331PN2389 - 97 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 8,000,000
(vii) Shippensburg University, Cumberland
County
(A) Heiges Field House renovation and
addition
Project Allocation 20,000,000
(B) Renovation, replacement or upgrade of
campus infrastructure
Project Allocation 25,000,000
(viii) Indiana University, Indiana County
(A) Renovation, replacement or upgrade of
campus infrastructure
Project Allocation 15,000,000
(B) New construction, alterations, and
infrastructure upgrades for a new
academic commons replacement
Project Allocation 45,000,000
(ix) Millersville University, Lancaster
County
(A) Renovations, new construction,
alterations and infrastructure
upgrades to Pucillo Hall
Project Allocation 15,000,000
(B) Renovations, new construction,
alterations, and infrastructure
upgrade
Project Allocation 15,000,000
(C) Renovation, replacement or upgrade of
campus ADA infrastructure
Project Allocation 15,000,000
20250HB1331PN2389 - 98 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(D) Renovations, new construction,
alterations and infrastructure
upgrades to Biemsderfer Stadium
Project Allocation 8,000,000
(x) East Stroudsburg University, Monroe
County
(A) Renovations, new construction,
alterations and infrastructure
upgrades to Linden Hall
Project Allocation 50,000,000
(B) Renovations, new construction,
alterations and infrastructure
upgrades
Project Allocation 15,000,000
(xi) State System of Higher Education,
Systemwide
(A) Renovations, replacement or upgrade
of campus infrastructure
Project Allocation 30,000,000
(B) Demolition of underutilized and
obsolete buildings
Project Allocation 20,000,000
(15) Department of Transportation
(i) Adams County
(A) General storage buildings. Construct
new, upgrade or replace to provide for
the construction or renovation of four
general storage buildings
Project Allocation 2,000,000
(B) Maintenance facility-county office.
20250HB1331PN2389 - 99 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Construct new, upgrade or replace to
provide for the construction or
renovation of facility. May include
site acquisition and development,
design and construction of buildings
and utility work
Project Allocation 18,200,000
(C) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 3,780,000
(D) Maintenance vehicle wash facility.
Construct new or retrofit to provide
for the new construction or
retrofitting of facility, including
site work, utilities and equipment
Project Allocation 1,500,000
(ii) Allegheny County
(A) District Office. Provide for
renovation and expansion for code
compliance, upgraded building systems,
improved program requirements and
energy efficiency at District Office
11-0
Project Allocation 30,800,000
(B) Driver Licensing Center. Renovate,
construct new, and expand, including
20250HB1331PN2389 - 100 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
roof replacement, upgrade building
systems, sidewalks, curbing, step
replacement, parking lot upgrades and
sewage plant upgrades
Project Allocation 13,400,000
(C) Fleet Management (Western). New
construction, renovations, expansion
and alterations to existing Western
training facility, including site
acquisition and development, design,
construction and utility work
Project Allocation 10,000,000
(D) General storage buildings. Construct
new, upgrade or replace to provide for
the construction or renovation of four
general storage buildings
Project Allocation 2,000,000
(E) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility,including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 18,875,000
(F) Maintenance facility-county office.
Super garage. Construct new, upgrade
or replace to provide for the
construction or renovation of facility
to combine the Allegheny, Beaver and
20250HB1331PN2389 - 101 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Fort Pitt Tunnel maintenance units
into a combined garage and
administration building, including
auxiliary buildings. May include site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 120,000,000
(G) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 1,000,000
(H) Maintenance vehicle wash facility.
Construct new or retrofit to provide
for the new construction or
retrofitting of facility, including
site work, utilities and equipment
Project Allocation 1,000,000
(iii) Armstrong County
(A) General storage buildings. Construct
new, upgrade or replace to provide for
the construction or renovation of four
general storage buildings
Project Allocation 5,000,000
(B) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
20250HB1331PN2389 - 102 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 37,850,000
(C) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 1,000,000
(D) Winter material storage building.
Replace salt storage building,
including demolition of existing salt
building and demolition and
replacement of liquid de-icing
containment structures
Project Allocation 4,200,000
(iv) Beaver County
(A) General storage buildings. Construct
new, upgrade or replace to provide for
the construction or renovation of four
general storage buildings
Project Allocation 3,000,000
(B) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
20250HB1331PN2389 - 103 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
and construction of buildings and
utility work
Project Allocation 10,450,000
(C) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 4,000,000
(v) Bedford County
(A) General storage buildings. Construct
new, upgrade or replace to provide for
the construction or renovation of four
general storage buildings
Project Allocation 3,500,000
(B) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 7,075,000
(C) Winter material storage building.
Replace salt storage building,
including demolition of existing salt
building and demolition and
replacement of liquid de-icing
containment structures
20250HB1331PN2389 - 104 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 8,300,000
(vi) Berks County
(A) General storage buildings. Construct
new, upgrade or replace to provide for
the construction or renovation of four
general storage buildings
Project Allocation 4,500,000
(B) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 17,775,000
(C) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 12,000,000
(D) Weigh station. Construct new, upgrade
or replace to provide for the
construction or renovation of a
Transportation/State Police inspection
facility, including site acquisition
and development, design and
construction of buildings and utility
work
20250HB1331PN2389 - 105 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 60,000,000
(vii) Blair County
(A) District office. Provide for
renovation and expansion for code
compliance, upgraded building systems,
improved program requirements and
energy efficiency at District Office
9-0
Project Allocation 41,000,000
(B) General storage buildings. Construct
new, upgrade or replace to provide for
the construction or renovation of four
general storage buildings
Project Allocation 3,500,000
(C) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 32,000,000
(D) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 3,335,000
(viii) Bradford County
20250HB1331PN2389 - 106 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) General storage buildings. Construct
new, upgrade or replace to provide for
the construction or renovation of four
general storage buildings
Project Allocation 5,000,000
(B) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 43,425,000
(C) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 20,000,000
(D) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 2,000,000
(ix) Bucks County
(A) General storage buildings. Construct
20250HB1331PN2389 - 107 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
new, upgrade or replace to provide for
the construction or renovation of four
general storage buildings
Project Allocation 5,000,000
(B) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 39,000,000
(C) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 3,000,000
(D) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 5,000,000
(E) Roadside rest facility. Renovate and
expand Rest Site P, including roof
replacement, building systems
20250HB1331PN2389 - 108 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
upgrades, sidewalks, curbing, step
replacement, parking lot upgrades and
sewage plant upgrades
Project Allocation 10,157,000
(F) Welcome Center. Renovate and expand
Welcome Center Site P, including roof
replacement, building systems
upgrades, sidewalks, curbing, step
replacement, parking lot upgrades and
sewage plant upgrades
Project Allocation 40,000,000
(x) Butler County
(A) General storage buildings. Construct
new, upgrade or replace to provide for
the construction or renovation of four
general storage buildings
Project Allocation 5,000,000
(B) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 19,605,000
(C) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
20250HB1331PN2389 - 109 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
program requirements
Project Allocation 5,000,000
(xi) Cambria County
(A) Driver Licensing Center. Renovate,
construct new and expand, including
roof replacement, upgrade building
systems, sidewalks, curbing, step
replacement, parking lot upgrades and
sewage plant upgrades
Project Allocation 13,750,000
(B) General storage buildings. Construct
new, upgrade or replace to provide for
the construction or renovation of four
general storage buildings
Project Allocation 5,000,000
(C) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 20,425,000
(xii) Cameron County
(A) General storage buildings. Construct
new, upgrade or replace to provide for
the construction or renovation of four
general storage buildings
Project Allocation 5,000,000
(B) Maintenance facility-county office.
20250HB1331PN2389 - 110 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 16,825,000
(C) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 12,000,000
(xiii) Carbon County
(A) General storage buildings. Construct
new, upgrade or replace to provide for
the construction or renovation of four
general storage buildings
Project Allocation 4,500,000
(B) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 51,000,000
(C) Maintenance facility-county office.
Construct new, upgrade or replace to
20250HB1331PN2389 - 111 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 20,000,000
(D) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 12,000,000
(E) Paint truck storage building. The
proposed new line painting truck
maintenance building for traffic line
painting operations
Project Allocation 3,000,000
(xiv) Centre County
(A) Driver Licensing Center. Renovate,
construct new and expand, including
roof replacement, upgrade building
systems, sidewalks, curbing, step
replacement, parking lot upgrades and
sewage plant upgrades
Project Allocation 13,750,000
(B) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
20250HB1331PN2389 - 112 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
stockpile facility to meet code and
program requirements
Project Allocation 12,000,000
(C) Winter material storage building.
Replace salt storage building,
including demolition of existing salt
building and demolition and
replacement of liquid de-icing
containment structures
Project Allocation 1,800,000
(xv) Chester County
(A) General storage buildings. Construct
new, upgrade or replace to provide for
the construction or renovation of four
general storage buildings
Project Allocation 4,500,000
(B) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 34,500,000
(C) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
20250HB1331PN2389 - 113 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 12,000,000
(D) Winter material storage building.
Replace salt storage building,
including demolition of existing salt
building and demolition and
replacement of liquid de-icing
containment structures
Project Allocation 5,500,000
(xvi) Clarion County
(A) General storage buildings. Construct
new, upgrade or replace to provide for
the construction or renovation of four
general storage buildings
Project Allocation 5,000,000
(B) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 21,238,000
(C) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 5,000,000
(xvii) Clearfield County
20250HB1331PN2389 - 114 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) District Office. New construction,
renovations, expansion and alterations
to existing district office, including
site acquisition and development,
design, construction and utility work
Project Allocation 41,000,000
(B) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 9,700,000
(C) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 12,000,000
(xviii) Clinton County
(A) General storage buildings. Construct
new, upgrade or replace to provide for
the construction or renovation of four
general storage buildings
Project Allocation 5,000,000
(B) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
20250HB1331PN2389 - 115 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 27,500,000
(C) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 12,000,000
(xix) Columbia County
(A) General storage buildings. Construct
new, upgrade or replace to provide for
the construction or renovation of four
general storage buildings
Project Allocation 5,000,000
(B) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 8,500,000
(C) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
20250HB1331PN2389 - 116 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
stockpile facility to meet code and
program requirements
Project Allocation 12,000,000
(xx) Crawford County
(A) Driver Licensing Center. Renovate,
construct new and expand, including
roof replacement, upgrade building
systems, sidewalks, curbing, step
replacement, parking lot upgrades and
sewage plant upgrades
Project Allocation 13,750,000
(B) General storage buildings. Construct
new, upgrade or replace to provide for
the construction or renovation of four
general storage buildings
Project Allocation 4,650,000
(C) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 4,025,000
(D) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
20250HB1331PN2389 - 117 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 12,000,000
(E) Maintenance vehicle wash facility.
Construct new or retrofit to provide
for the new construction or
retrofitting of facility, including
site work, utilities and equipment
Project Allocation 1,000,000
(xxi) Cumberland County
(A) General storage buildings. Construct
new, upgrade or replace to provide for
the construction or renovation of four
general storage buildings
Project Allocation 3,500,000
(B) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 23,500,000
(C) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 12,000,000
(xxii) Dauphin County
(A) Keystone Building. To provide for the
20250HB1331PN2389 - 118 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
reorganization of Transportation
Offices to meet changing program needs
Project Allocation 3,000,000
(B) District Office. New construction,
renovations, expansion and alterations
to existing district office, including
site acquisition and development,
design, construction and utility work
Project Allocation 39,000,000
(C) Fleet management facility. Construct
new, upgrade or replace to provide for
the construction or renovation of
facility, including site acquisition
and development, design and
construction of buildings and utility
work
Project Allocation 18,500,000
(D) General storage buildings. Construct
new, upgrade or replace to provide for
the construction or renovation of four
general storage buildings
Project Allocation 2,500,000
(E) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 6,700,000
20250HB1331PN2389 - 119 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(F) Materials testing laboratory.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 15,000,000
(G) Roadside rest facility. Renovate and
expand Rest Site 46, including roof
replacement, building systems
upgrades, sidewalks, curbing, step
replacement, parking lot upgrades and
sewage plant upgrades
Project Allocation 10,000,000
(H) Roadside rest facility. Renovate and
expand Rest Site 47, including roof
replacement, building systems
upgrades, sidewalks, curbing, step
replacement, parking lot upgrades and
sewage plant upgrades
Project Allocation 15,000,000
(I) Roadside rest facility. Renovate and
expand Rest Site 48, including roof
replacement, building systems
upgrades, sidewalks, curbing, step
replacement, parking lot upgrades and
sewage plant upgrades
Project Allocation 15,000,000
(J) Sign shop facility. Construct new,
20250HB1331PN2389 - 120 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
upgrade or replace to provide for the
construction or renovation of
facility, including site acquisition
and development, design and
construction of buildings and utility
work
Project Allocation 20,000,000
(K) Winter material storage building.
Replace salt storage building,
including demolition of existing salt
building and demolition and
replacement of liquid de-icing
containment structures
Project Allocation 4,200,000
(xxiii) Delaware County
(A) General storage buildings. Construct
new, upgrade or replace to provide for
the construction or renovation of four
general storage buildings
Project Allocation 5,000,000
(B) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 31,000,000
(C) Maintenance facility-stockpile.
Construct new, upgrade or replace to
20250HB1331PN2389 - 121 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 6,000,000
(D) Maintenance vehicle wash facility.
Construct new or retrofit to provide
for the new construction or
retrofitting of facility, including
site work, utilities and equipment
Project Allocation 1,000,000
(E) Welcome Center. Renovate, expand or
replace Welcome Center Site N,
including roof replacement, building
systems upgrades, sidewalks, curbing,
step replacement, parking lot upgrades
and sewage plant upgrades
Project Allocation 35,450,000
(xxiv) Elk County
(A) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 36,500,000
(B) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
20250HB1331PN2389 - 122 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 12,000,000
(xxv) Erie County
(A) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 18,638,000
(B) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 2,000,000
(C) Maintenance vehicle wash facility.
Construct new or retrofit to provide
for the new construction or
retrofitting of facility, including
site work, utilities and equipment
Project Allocation 1,000,000
(D) Welcome Center. Renovate, expand or
replace Welcome Center Site L,
including roof replacement, building
systems upgrades, sidewalks, curbing,
20250HB1331PN2389 - 123 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
step replacement, parking lot upgrades
and sewage plant upgrades
Project Allocation 34,000,000
(E) Welcome Center. Renovate, expand or
replace Welcome Center Site M,
including roof replacement, building
systems upgrades, sidewalks, curbing,
step replacement, parking lot upgrades
and sewage plant upgrades
Project Allocation 20,000,000
(xxvi) Fayette County
(A) District Office. New construction,
renovations, expansion and alterations
to existing district office, including
site acquisition and development,
design, construction and utility work
Project Allocation 35,000,000
(B) Driver Licensing Center. Renovate,
construct new and expand, including
roof replacement, upgrade building
systems, sidewalks, curbing, step
replacement, parking lot upgrades and
sewage plant upgrades
Project Allocation 13,750,000
(C) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
20250HB1331PN2389 - 124 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
utility work
Project Allocation 29,000,000
(D) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 6,000,000
(xxvii) Forest County
(A) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 5,500,000
(B) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 12,000,000
(xxviii) Franklin County
(A) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
20250HB1331PN2389 - 125 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 15,625,000
(B) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 7,560,000
(C) Welcome Center. Renovate, expand or
replace Welcome Center Site G,
including roof replacement, building
systems upgrades, sidewalks, curbing,
step replacement, parking lot upgrades
and sewage plant upgrades
Project Allocation 18,500,000
(D) Winter material storage building.
Replace salt storage building,
including demolition of existing salt
building and demolition and
replacement of liquid de-icing
containment structures
Project Allocation 3,000,000
(xxix) Fulton County
(A) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
20250HB1331PN2389 - 126 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 10,075,000
(B) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 12,000,000
(C) Maintenance vehicle wash facility.
Construct new or retrofit to provide
for the new construction or
retrofitting of facility, including
site work, utilities and equipment
Project Allocation 1,500,000
(D) Roadside rest facility. Renovate and
expand Rest Site 3, including roof
replacement, building systems
upgrades, sidewalks, curbing, step
replacement, parking lot upgrades and
sewage plant upgrades
Project Allocation 10,000,000
(E) Welcome Center. Renovate, expand or
replace Welcome Center Site B,
including roof replacement, building
systems upgrades, sidewalks, curbing,
step replacement, parking lot upgrades
and sewage plant upgrades
20250HB1331PN2389 - 127 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 22,450,000
(xxx) Greene County
(A) Driver Licensing Center. Renovate,
construct new and expand, including
roof replacement, upgrade building
systems, sidewalks, curbing, step
replacement, parking lot upgrades and
sewage plant upgrades
Project Allocation 13,750,000
(B) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 36,100,000
(C) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 9,000,000
(D) Welcome Center. Renovate, expand or
replace Welcome Center Site D,
including roof replacement, building
systems upgrades, sidewalks, curbing,
step replacement, parking lot upgrades
and sewage plant upgrades
20250HB1331PN2389 - 128 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 32,200,000
(xxxi) Huntingdon County
(A) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 9,770,000
(B) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 12,000,000
(xxxii) Indiana County
(A) District office. New construction,
renovations, expansion and alterations
to existing district office, including
site acquisition and development,
design, construction and utility work
Project Allocation 30,150,000
(B) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
20250HB1331PN2389 - 129 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
utility work
Project Allocation 15,603,000
(C) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 8,950,000
(D) Maintenance vehicle wash facility.
Construct new or retrofit to provide
for the new construction or
retrofitting of facility, including
site work, utilities and equipment
Project Allocation 1,000,000
(E) Winter material storage building.
Replace salt storage building,
including demolition of existing salt
building and demolition and
replacement of liquid de-icing
containment structures
Project Allocation 4,500,000
(xxxiii) Jefferson County
(A) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
20250HB1331PN2389 - 130 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 25,350,000
(B) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 12,000,000
(C) Maintenance vehicle wash facility.
Construct new or retrofit to provide
for the new construction or
retrofitting of facility, including
site work, utilities and equipment
Project Allocation 1,500,000
(D) Roadside rest facility. Renovate and
expand Rest Site 25, including roof
replacement, building systems
upgrades, sidewalks, curbing, step
replacement, parking lot upgrades and
sewage plant upgrades
Project Allocation 1,000,000
(E) Roadside rest facility. Renovate and
expand Rest Site 26, including roof
replacement, building systems
upgrades, sidewalks, curbing, step
replacement, parking lot upgrades and
sewage plant upgrades
Project Allocation 1,000,000
(xxxiv) Juniata County
(A) Maintenance facility-county office.
20250HB1331PN2389 - 131 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 24,750,000
(B) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 12,000,000
(C) Maintenance vehicle wash facility.
Construct new or retrofit to provide
for the new construction or
retrofitting of facility, including
site work, utilities and equipment
Project Allocation 1,500,000
(xxxv) Lackawanna County
(A) District office. New construction,
renovations, expansion and alterations
to existing district office, including
site acquisition and development,
design, construction and utility work
Project Allocation 37,000,000
(B) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
20250HB1331PN2389 - 132 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 10,285,000
(C) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 4,000,000
(D) Maintenance vehicle wash facility.
Construct new or retrofit to provide
for the new construction or
retrofitting of facility, including
site work, utilities and equipment
Project Allocation 1,500,000
(E) Roadside rest facility. Renovate and
expand Rest Site 55, including roof
replacement, building systems
upgrades, sidewalks, curbing, step
replacement, parking lot upgrades and
sewage plant upgrades
Project Allocation 15,000,000
(xxxvi) Lancaster County
(A) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
20250HB1331PN2389 - 133 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 36,400,000
(B) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 3,780,000
(C) Maintenance vehicle wash facility.
Construct new or retrofit to provide
for the new construction or
retrofitting of facility, including
site work, utilities and equipment
Project Allocation 1,500,000
(D) Winter material storage building.
Replace salt storage building,
including demolition of existing salt
building and demolition and
replacement of liquid de-icing
containment structures
Project Allocation 5,000,000
(xxxvii) Lawrence County
(A) Driver licensing center. Renovate,
construct new and expand, including
roof replacement, upgrade building
systems, sidewalks, curbing, step
replacement, parking lot upgrades and
20250HB1331PN2389 - 134 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
sewage plant upgrades
Project Allocation 13,750,000
(B) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 22,275,000
(C) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 9,000,000
(D) Maintenance vehicle wash facility.
Construct new or retrofit to provide
for the new construction or
retrofitting of facility, including
site work, utilities and equipment
Project Allocation 1,500,000
(E) Winter material storage building.
Replace salt storage building,
including demolition of existing salt
building and demolition and
replacement of liquid de-icing
containment structures
Project Allocation 5,500,000
20250HB1331PN2389 - 135 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(xxxviii) Lebanon County
(A) Driver licensing center. Renovate,
construct new and expand, including
roof replacement, upgrade building
systems, sidewalks, curbing, step
replacement, parking lot upgrades and
sewage plant upgrades
Project Allocation 13,750,000
(B) Fleet management (Eastern). New
construction, renovations, expansion
and alterations to existing Eastern
training facility, including site
acquisition and development, design,
construction and utility work
Project Allocation 10,000,000
(C) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 14,925,000
(D) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 12,000,000
20250HB1331PN2389 - 136 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(E) Maintenance vehicle wash facility.
Construct new or retrofit to provide
for the new construction or
retrofitting of facility, including
site work, utilities and equipment
Project Allocation 1,150,000
(xxxix) Lehigh County
(A) District office. New construction,
renovations, expansion and alterations
to existing district office, including
site acquisition and development,
design, construction and utility work
Project Allocation 40,425,000
(B) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 15,550,000
(C) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 12,000,000
(D) Maintenance vehicle wash facility.
Construct new or retrofit to provide
20250HB1331PN2389 - 137 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
for the new construction or
retrofitting of facility, including
site work, utilities and equipment
Project Allocation 1,500,000
(E) Winter material storage building.
Replace salt storage building,
including demolition of existing salt
building and demolition and
replacement of liquid de-icing
containment structures
Project Allocation 5,000,000
(xl) Luzerne County
(A) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 32,000,000
(B) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 9,780,000
(C) Winter material storage building.
Replace salt storage building,
including demolition of existing salt
20250HB1331PN2389 - 138 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
building and demolition and
replacement of liquid de-icing
containment structures
Project Allocation 3,000,000
(xli) Lycoming County
(A) District office. New construction,
renovations, expansion and alterations
to existing district office, including
site acquisition and development,
design, construction and utility work
Project Allocation 38,500,000
(B) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 16,125,000
(C) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 12,000,000
(xlii) McKean County
(A) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
20250HB1331PN2389 - 139 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 18,125,000
(B) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 12,000,000
(C) Winter material storage building.
Replace salt storage building,
including demolition of existing salt
building and demolition and
replacement of liquid de-icing
containment structures
Project Allocation 5,500,000
(xliii) Mercer County
(A) Driver licensing center. Renovate,
construct new and expand, including
roof replacement, upgrade building
systems, sidewalks, curbing, step
replacement, parking lot upgrades and
sewage plant upgrades
Project Allocation 13,750,000
(B) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
20250HB1331PN2389 - 140 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 17,000,000
(C) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 12,000,000
(D) Roadside rest facility. Renovate and
expand Rest Site 17, including roof
replacement, building systems
upgrades, sidewalks, curbing, step
replacement, parking lot upgrades and
sewage plant upgrades
Project Allocation 5,000,000
(E) Roadside rest facility. Renovate and
expand Rest Site 18, including roof
replacement, building systems
upgrades, sidewalks, curbing, step
replacement, parking lot upgrades and
sewage plant upgrades
Project Allocation 2,500,000
(F) Welcome Center. Renovate, expand or
replace Welcome Center Site E,
including roof replacement, building
systems upgrades, sidewalks, curbing,
20250HB1331PN2389 - 141 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
step replacement, parking lot upgrades
and sewage plant upgrades
Project Allocation 14,225,000
(xliv) Mifflin County
(A) Driver licensing center. Renovate,
construct new and expand, including
roof replacement, upgrade building
systems, sidewalks, curbing, step
replacement, parking lot upgrades and
sewage plant upgrades
Project Allocation 13,750,000
(B) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 36,325,000
(C) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 12,000,000
(xlv) Monroe County
(A) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
20250HB1331PN2389 - 142 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 29,050,000
(B) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 12,000,000
(C) Maintenance vehicle wash facility.
Construct new or retrofit to provide
for the new construction or
retrofitting of facility, including
site work, utilities and equipment
Project Allocation 1,500,000
(D) Welcome Center. Renovate, expand or
replace Welcome Center Site F,
including roof replacement, building
systems upgrades, sidewalks, curbing,
step replacement, parking lot upgrades
and sewage plant upgrades
Project Allocation 20,500,000
(xlvi) Montgomery County
(A) District office. New construction,
renovations, expansion and alterations
to existing district office, including
site acquisition and development,
20250HB1331PN2389 - 143 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
design, construction and utility work
Project Allocation 41,260,000
(B) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 29,100,000
(C) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 12,000,000
(D) Maintenance vehicle wash facility.
Construct new or retrofit to provide
for the new construction or
retrofitting of facility, including
site work, utilities and equipment
Project Allocation 1,000,000
(E) Parking garage. New construction,
renovations, expansion and alterations
to existing parking garage at the
District 6 Engineering Office,
including site acquisition and
development, design, construction and
utility work
20250HB1331PN2389 - 144 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 14,000,000
(F) Regional traffic management center.
New construction, renovations,
expansion and alterations to existing
regional traffic management center at
the District 6 Engineering Office,
including site acquisition and
development, design, construction and
utility work
Project Allocation 70,000,000
(G) Winter material storage building.
Replace salt storage building,
including demolition of existing salt
building and demolition and
replacement of liquid de-icing
containment structures
Project Allocation 5,500,000
(xlvii) Montour County
(A) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 21,800,000
(B) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
20250HB1331PN2389 - 145 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
stockpile facility to meet code and
program requirements
Project Allocation 4,000,000
(xlviii) Northampton County
(A) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 36,425,000
(B) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 11,500,000
(xlix) Northumberland County
(A) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 21,425,000
(B) Maintenance facility-stockpile.
Construct new, upgrade or replace to
20250HB1331PN2389 - 146 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 12,000,000
(l) Perry County
(A) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 37,000,000
(B) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 40,000,000
(li) Philadelphia County
(A) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
20250HB1331PN2389 - 147 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 25,000,000
(B) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 12,000,000
(C) Philadelphia Regional Port Authority.
Design, construction and general
improvements to all Philadelphia
Regional Port Authority properties,
including new land acquisition
Project Allocation 150,000,000
PROJECT ALLOCATION 260,000,000
(D) Philadelphia Regional Port Authority.
Maintenance dredging of all
Philadelphia Regional Port Authority
facilities, including permitting
activities
Project Allocation 60,000,000
(E) Philadelphia Regional Port Authority.
Sustainability/resiliency at
Philadelphia Regional Port Authority
facilities
Project Allocation 100,000,000
(F) Philadelphia Regional Port Authority.
General improvements to include
acquisition and development of
infrastructure to support the handling
20250HB1331PN2389 - 148 -
<--
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
of both general and passenger cargo at
Philadelphia Regional Port Authority
facilities
Project Allocation 160,600,000
(G) Philadelphia Regional Port Authority.
Container capacity development at
Philadelphia Regional Port Authority
facilities
Project Allocation 244,000,000
(H) Philadelphia Regional Port Authority.
Acquisition of Ship to Store Cranes
for use at Philadelphia Regional Port
Authority facilities
Project Allocation 85,800,000
(I) Philadelphia Regional Port Authority.
Berth development at Philadelphia
Regional Port Authority facilities to
include capital dredging
Project Allocation 137,500,000
(J) Philadelphia Regional Port Authority.
General improvements to the Tioga
Marine Terminal infrastructure, and
adjacent properties, to include berth
rehabilitation, two container cranes
and warehouse development
Project Allocation 125,000,000
(lii) Pike County
(A) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
20250HB1331PN2389 - 149 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 25,800,000
(B) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 12,000,000
(C) Welcome Center. Renovate, expand or
replace Welcome Center Site K,
including roof replacement, building
systems upgrades, sidewalks, curbing,
step replacement, parking lot upgrades
and sewage plant upgrades
Project Allocation 33,850,000
(liii) Potter County
(A) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 2,900,000
(B) Maintenance facility-stockpile.
Construct new, upgrade or replace to
20250HB1331PN2389 - 150 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 12,000,000
(liv) Schuylkill County
(A) Driver licensing center. Renovate,
construct new and expand, including
roof replacement, upgrade building
systems, sidewalks, curbing, step
replacement, parking lot upgrades and
sewage plant upgrades
Project Allocation 13,750,000
(B) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 29,850,000
(C) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 12,000,000
(D) Maintenance vehicle wash facility.
Construct new or retrofit to provide
20250HB1331PN2389 - 151 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
for the new construction or
retrofitting of facility, including
site work, utilities and equipment
Project Allocation 1,500,000
(lv) Snyder County
(A) Driver licensing center. Renovate,
construct new and expand, including
roof replacement, upgrade building
systems, sidewalks, curbing, step
replacement, parking lot upgrades and
sewage plant upgrades
Project Allocation 13,750,000
(B) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 46,500,000
(C) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 12,000,000
(lvi) Somerset County
(A) Driver licensing center. Renovate,
construct new and expand, including
20250HB1331PN2389 - 152 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
roof replacement, upgrade building
systems, sidewalks, curbing, step
replacement, parking lot upgrades and
sewage plant upgrades
Project Allocation 13,750,000
(B) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 17,500,000
(C) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 9,000,000
(lvii) Sullivan County
(A) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 24,000,000
(B) Maintenance facility-stockpile.
20250HB1331PN2389 - 153 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 12,000,000
(lviii) Susquehanna County
(A) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 19,650,000
(B) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 12,000,000
(C) Maintenance vehicle wash facility.
Construct new or retrofit to provide
for the new construction or
retrofitting of facility, including
site work, utilities and equipment
Project Allocation 1,000,000
(D) Welcome Center. Renovate, expand or
replace Welcome Center Site H,
20250HB1331PN2389 - 154 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
including roof replacement, building
systems upgrades, sidewalks, curbing,
step replacement, parking lot upgrades
and sewage plant upgrades
Project Allocation 33,180,000
(lix) Tioga County
(A) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 11,825,000
(B) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 12,000,000
(C) Maintenance vehicle wash facility.
Construct new or retrofit to provide
for the new construction or
retrofitting of facility, including
site work, utilities and equipment
Project Allocation 1,500,000
(D) Welcome Center. Renovate, expand or
replace Welcome Center Site T,
including roof replacement, building
20250HB1331PN2389 - 155 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
systems upgrades, sidewalks, curbing,
step replacement, parking lot upgrades
and sewage plant upgrades
Project Allocation 18,500,000
(E) Winter material storage building.
Replace salt storage building,
including demolition of existing salt
building and demolition and
replacement of liquid de-icing
containment structures
Project Allocation 5,500,000
(lx) Union County
(A) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 42,000,000
(B) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 12,000,000
(lxi) Venango County
(A) District Office. Provide for
renovation and expansion for code
20250HB1331PN2389 - 156 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
compliance, upgraded building systems,
improved program requirements and
energy efficiency at District Office
1-0
Project Allocation 31,905,000
(B) Driver licensing center. Renovate,
construct new and expand, including
roof replacement, upgrade building
systems, sidewalks, curbing, step
replacement, parking lot upgrades and
sewage plant upgrades
Project Allocation 13,750,000
(C) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 16,925,000
(D) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 12,000,000
(lxii) Warren County
(A) Driver licensing center. Renovate,
construct new and expand, including
20250HB1331PN2389 - 157 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
roof replacement, upgrade building
systems, sidewalks, curbing, step
replacement, parking lot upgrades and
sewage plant upgrades
Project Allocation 13,750,000
(B) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 17,925,000
(C) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 12,000,000
(D) Winter material storage building.
Replace salt storage building,
including demolition of existing salt
building and demolition and
replacement of liquid de-icing
containment structures
Project Allocation 4,500,000
(lxiii) Washington County
(A) Maintenance facility-county office.
Construct new, upgrade or replace to
20250HB1331PN2389 - 158 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 16,250,000
(B) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 7,000,000
(C) Welcome Center. Renovate, expand or
replace Welcome Center Site A,
including roof replacement, building
systems upgrades, sidewalks, curbing,
step replacement, parking lot upgrades
and sewage plant upgrades
Project Allocation 18,000,000
(D) Winter material storage building.
Replace salt storage building,
including demolition of existing salt
building and demolition and
replacement of liquid de-icing
containment structures
Project Allocation 5,500,000
(lxiv) Wayne County
(A) Maintenance facility-county office.
Construct new, upgrade or replace to
20250HB1331PN2389 - 159 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 8,600,000
(B) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 12,000,000
(C) Maintenance vehicle wash facility.
Construct new or retrofit to provide
for the new construction or
retrofitting of facility, including
site work, utilities and equipment
Project Allocation 1,000,000
(lxv) Westmoreland County
(A) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 11,200,000
(B) Maintenance facility-stockpile.
Construct new, upgrade or replace to
20250HB1331PN2389 - 160 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 4,800,000
(C) Maintenance vehicle wash facility.
Construct new or retrofit to provide
for the new construction or
retrofitting of facility, including
site work, utilities and equipment
Project Allocation 1,500,000
(lxvi) Wyoming County
(A) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 22,040,000
(B) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 12,000,000
(lxvii) York County
(A) Maintenance facility-county office.
Construct new, upgrade or replace to
20250HB1331PN2389 - 161 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 26,550,000
(B) Maintenance facility-county office.
Construct new, upgrade or replace to
provide for the construction or
renovation of facility, including site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 25,000,000
(C) Maintenance facility-stockpile.
Construct new, upgrade or replace to
provide for the construction of a new
or a renovation of an existing
stockpile facility to meet code and
program requirements
Project Allocation 6,780,000
(D) Welcome Center. Renovate, expand or
replace Welcome Center Site J,
including roof replacement, building
systems upgrades, sidewalks, curbing,
step replacement, parking lot upgrades
and sewage plant upgrades
Project Allocation 7,000,000
(E) Winter material storage building.
Replace salt storage building,
20250HB1331PN2389 - 162 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
including demolition of existing salt
building and demolition and
replacement of liquid de-icing
containment structures
Project Allocation 2,500,000
(lxvii.1) Multicounty
(A) District Office/County Maintenance
Office and garage/Real ID Drivers
Licensing Center, Lehigh, Carbon,
Monroe, Northampton, Schuylkill and
Berks Counties. Combining the District
5 Engineering Office and County
Maintenance Offices in the District 5
region, including Berks, Schuylkill,
Lehigh, Carbon, Monroe and Northampton
County Maintenance Office and garage
facilities, including associated
stockpiles, into one combined facility
complex, including a Real ID Driver
Licensing and Vehicle Service Center,
including the demolition of existing
structures, construction of new
district and county maintenance
offices and garage facilities, Driver
Licensing and Vehicle Service Center,
including auxiliary support buildings.
The project may include site
acquisition, land development, design
and construction of buildings, utility
infrastructure, roadways and security
20250HB1331PN2389 - 163 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
systems to meet PennDOT operational
needs
Project Allocation 500,000,000
(B) District Office, Lehigh, Carbon,
Monroe, Northampton, Schuylkill and
Berks Counties. Replacement of the
District 5 Engineering Office,
including the construction of
auxiliary support buildings. The
project may include site acquisition,
land development, design and
construction of buildings and utility
infrastructure
Project Allocation 100,000,000
(lxviii) Statewide
(A) Weigh stations. Construct new,
upgrade, replace to provide for the
construction or renovation of
Transportation/State Police inspection
facilities, including site acquisition
and development, design and
construction of buildings and utility
work. Construction of six facilities
Statewide
Project Allocation 360,000,000
(B) Intercity passenger and freight rail.
Rehabilitate or construct intercity
passenger and freight rail
infrastructure, including bridges, to
accommodate current and future demands
20250HB1331PN2389 - 164 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 75,000,000
Section 4. Itemization of furniture and equipment projects.
Additional capital projects in the category of public
improvement projects consisting of the acquisition of movable
furniture and equipment to complete public improvement projects
and to be purchased by the Department of General Services, its
successors or assigns, and to be financed by the incurring of
debt are hereby itemized, together with their estimated
financial cost, as follows:
Project
Total Project
Allocation
(1) Department of Agriculture (Reserved)
(2) Department of Conservation and Natural
Resources
(i) Point State Park, Allegheny County
(A) Provide original furniture and
equipment for park office renovations
Project Allocation 819,000
(ii) Delaware Canal State Park, Bucks County
(A) Provide original furniture and
equipment for new resource center with
storage building
Project Allocation 1,000,000
(iii) Big Elk Creek State Park, Chester
County
(A) Provide original furniture and
equipment for State Park Development
Phase 2
Project Allocation 2,000,000
(iv) Forestry Lab, Dauphin County
20250HB1331PN2389 - 165 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) Provide original furniture and
equipment for new laboratory
Project Allocation 3,000,000
(v) Geologic Survey Headquarters, Dauphin
County
(A) Provide original furniture and
equipment for new headquarters of the
Bureau of Geologic Survey
Project Allocation 2,000,000
(vi) Pinchot State Forest, Luzerne County
(A) Provide original furniture and
equipment for Pinchot Forest District
resource management center complex
Project Allocation 700,000
(vii) Maurice K. Goddard State Park, Mercer
County
(A) Provide original furniture and
equipment for redevelopment of park
facilities
Project Allocation 750,000
(viii) Denten Hill State Park, Potter County
(A) Provide original furniture and
equipment for redevelopment of park
facilities
Project Allocation 500,000
(ix) Vosburg Neck State Park, Wyoming County
(A) Provide original furniture and
equipment for State Park Development
Phase 2
Project Allocation 2,000,000
20250HB1331PN2389 - 166 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(x) Susquehanna Riverlands State Park, York
County
(A) Provide original furniture and
equipment for State Park Development
Phase 2
Project Allocation 2,000,000
(xi) Training Academy and Range, Statewide
(A) Provide original furniture and
equipment for Bureau of State Parks
Training Academy infrastructure and
range
Project Allocation 2,000,000
(3) Department of Corrections
(i) State Correctional Institution at Benner,
Centre County
(A) Provide original furniture and
equipment for renovations
Project Allocation 1,050,000
(ii) State Correctional Institution at
Rockview, Centre County
(A) Provide original furniture and
equipment for renovations
Project Allocation 7,500,000
(iii) Quehanna Boot Camp, Clearfield County
(A) Provide original furniture and
equipment for renovations
Project Allocation 1,000,000
(iv) State Correctional Institution at
Cambridge Springs, Crawford County
(A) Provide original furniture and
20250HB1331PN2389 - 167 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
equipment for renovations
Project Allocation 1,000,000
(v) State Correctional Institution at Camp
Hill, Cumberland County
(A) Provide original furniture and
equipment for renovations
Project Allocation 15,000,000
(vi) State Correctional Institution at
Chester, Delaware County
(A) Provide original furniture and
equipment for renovations
Project Allocation 1,000,000
(vii) State Correctional Institution at
Forest, Forest County
(A) Provide original furniture and
equipment for renovations
Project Allocation 1,000,000
(viii) State Correctional Institution at Pine
Grove, Indiana County
(A) Provide original furniture and
equipment for renovations
Project Allocation 1,000,000
(ix) State Correctional Institution at
Elizabethtown Training Academy, Lancaster
County
(A) Provide original furniture and
equipment for renovations
Project Allocation 1,000,000
(x) State Correctional Institution at Muncy,
Lycoming County
20250HB1331PN2389 - 168 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) Provide original furniture and
equipment for renovations
Project Allocation 8,000,000
(xi) State Correctional Institution at
Mercer, Mercer County
(A) Provide original furniture and
equipment for renovations
Project Allocation 1,000,000
(xii) State Correctional Institution at
Phoenix, Montgomery County
(A) Provide original furniture and
equipment for renovations
Project Allocation 1,050,000
(xiii) State Correctional Institution at
Frackville, Schuylkill County
(A) Provide original furniture and
equipment for renovations
Project Allocation 500,000
(xiv) State Correctional Institution at
Mahanoy, Schuylkill County
(A) Provide original furniture and
equipment for renovations
Project Allocation 1,500,000
(xv) State Correctional Institution at
Waymart, Wayne County
(A) Provide original furniture and
equipment for renovations
Project Allocation 4,000,000
(4) Department of Education
(i) The Pennsylvania State University
20250HB1331PN2389 - 169 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) Smith Building - Altoona Campus,
Blair County. Original furniture and
equipment for new space or addition to
and/or renovation of existing space
Project Allocation 2,500,000
(B) Chiller unit - University Park,
Centre County. Original furniture and
equipment for new space or addition to
and/or renovation of existing space
Project Allocation 2,000,000
(C) Former Palmer Museum of Art -
University Park, Centre County.
Original furniture and equipment for
new space or addition to and/or
renovation of existing space
Project Allocation 7,000,000
(D) General academic building -
University Park, Centre County.
Original furniture and equipment for
new space or addition to and/or
renovation of existing space
Project Allocation 7,000,000
(E) General research building -
University Park, Centre County.
Original furniture and equipment for
new space or addition to and/or
renovation of existing space
Project Allocation 7,000,000
(F) Greenhouse and headhouse complexes
relocation (PlantWorks) - University
20250HB1331PN2389 - 170 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Park, Centre County. Original
furniture, fixtures and equipment for
the relocation of the greenhouse and
headhouse complexes, also known as
PlantWorks, at Penn State University
Park
Project Allocation 20,000,000
(G) Millennium Science Complex II -
University Park, Centre County.
Original furniture and equipment for
new space or addition to and/or
renovation of existing space
Project Allocation 20,000,000
(H) Pasquerilla Spiritual Center -
University Park, Centre County.
Original furniture and equipment for
new space or addition to and/or
renovation of existing space
Project Allocation 3,000,000
(I) Classroom/class lab building -
University Park, Centre County.
Original furniture and equipment for
new space or addition to and/or
renovation of existing space
Project Allocation 5,050,000
(J) Stone Valley Forestry Building -
University Park, Huntingdon County.
Original furniture and equipment for
new space or addition to and/or
renovation of existing space
20250HB1331PN2389 - 171 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 1,000,000
(ii) Lincoln University
(A) 3020 Market Street, University City
District, Philadelphia County.
Original furniture and equipment for
renovations
Project Allocation 1,500,000
(B) Center for Black Culture, Chester
County. Original furniture and
equipment for renovation and addition
Project Allocation 4,000,000
(C) Cresson Hall, Chester County.
Original furniture and equipment for
renovation and addition
Project Allocation 20,000,000
(D) Faculty and staff housing upgrades,
Chester County. Original furniture and
equipment for upgrades and
improvements
Project Allocation 1,250,000
(E) Heritage Center, Chester County.
Original furniture and equipment for
renovation and addition
Project Allocation 375,000
(F) Houston Hall, Chester County.
Original furniture and equipment for
renovation
Project Allocation 3,000,000
(G) Lincoln Hall, Chester County.
Original furniture and equipment for
20250HB1331PN2389 - 172 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
renovation
Project Allocation 4,000,000
(H) Manuel Rivero (Hall) Gymnasium,
Chester County. Original furniture and
equipment for renovation and addition
Project Allocation 14,000,000
(I) McCauley Hall, Chester County.
Original furniture and equipment for
renovations
Project Allocation 2,500,000
(J) McRary Hall, Chester County. Original
furniture and equipment for
renovations
Project Allocation 2,500,000
(K) Nelson Science Center, Chester
County. Original furniture and
equipment for upgrades and
improvements
Project Allocation 1,250,000
(L) New residence hall, Chester County.
Original furniture and equipment for
new residence hall
Project Allocation 5,000,000
(M) Physical plant, Chester County.
Original furniture and equipment for
new residence hall
Project Allocation 2,500,000
(N) University Hall, Chester County.
Original furniture and equipment for
renovations
20250HB1331PN2389 - 173 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 3,000,000
(O) Vail Hall, Chester County. Original
furniture and equipment for
renovations and addition
Project Allocation 4,000,000
(P) Ware Center for the Performing Arts,
Chester County. Original furniture and
equipment for renovations
Project Allocation 4,000,000
(iii) Thaddeus Stevens College of Technology
(A) Community Learning Center, Lancaster
County. Original furniture and
equipment for renovations
Project Allocation 2,000,000
(B) Dormitories, Lancaster County.
Original furniture and equipment for
renovations
Project Allocation 3,000,000
(C) Hartzell Building, Lancaster County.
Original furniture and equipment for
renovations
Project Allocation 2,500,000
(D) Jones Building, Lancaster County.
Original furniture and equipment for
renovations
Project Allocation 4,000,000
(E) Leonard Hall, Lancaster County.
Original furniture and equipment for
renovations
Project Allocation 2,500,000
20250HB1331PN2389 - 174 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(F) Mellor Building, Lancaster County.
Original furniture and equipment for
renovations
Project Allocation 15,000,000
(G) New multipurpose building/dormitory,
Lancaster County. Original furniture
and equipment for addition
Project Allocation 5,000,000
(H) Schwalm Building, Lancaster County.
Original furniture and equipment for
renovations and addition
Project Allocation 4,500,000
(I) Snyder Hall, Lancaster County.
Original furniture and equipment for
renovations and addition
Project Allocation 4,000,000
(5) Pennsylvania Emergency Management Agency
(Reserved)
(6) Department of Environmental Protection
(Reserved)
(7) Department of General Services
(i) Statewide
(A) Furniture, fixtures and equipment for
space consolidation efforts
Project Allocation 100,000,000
(ii) Rachel Carson Building, Dauphin County
(A) Provide new fixtures, furnishings and
equipment for the Rachel Carson
Building
Project Allocation 20,000,000
20250HB1331PN2389 - 175 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(8) Pennsylvania Historical and Museum
Commission
(i) State Museum of Pennsylvania, Dauphin
County
(A) Provide original furniture and
equipment for renovated State Museum
Project Allocation 15,000,000
(B) Furniture and equipment for building
rehabilitation
Project Allocation 20,000,000
(ii) State Archives, Dauphin County
(A) Provide original furniture and
equipment for renovated State Archives
building
Project Allocation 8,000,000
(iii) Landis Valley Village and Farm Museum,
Lancaster County
(A) Provide original furniture and
equipment for renovated Visitor Center
Project Allocation 2,000,000
(9) Department of Human Services
(i) South Mountain Secure Treatment Unit,
Franklin County
(A) Provide original furniture and
equipment to support building
renovation projects
Project Allocation 5,000,000
(ii) Norristown Forensic Building, Montgomery
County
(A) Provide original furniture and
20250HB1331PN2389 - 176 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
equipment for the Norristown Forensic
Building
Project Allocation 20,000,000
(iii) Selinsgrove Center, Snyder County
(A) Provide original furniture and
equipment to support central building
renovation project
Project Allocation 5,000,000
(iv) Torrance State Hospital, Westmoreland
County
(A) Fixtures, furnishings and equipment
to support building renovation
projects
Project Allocation 5,000,000
(10) Department of Military and Veterans Affairs
(i) Gettysburg Readiness Center, Adams County
(A) Provide original furniture and
equipment
Project Allocation 1,000,000
(ii) Combined Support Maintenance Shop, West
Pittsburgh, Allegheny County
(A) Provide original furniture and
equipment
Project Allocation 1,000,000
(iii) Pittsburgh Crane Readiness Center,
Allegheny County
(A) Provide original furniture and
equipment
Project Allocation 1,000,000
(iv) Ford City Readiness Center, Armstrong
20250HB1331PN2389 - 177 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
County
(A) Provide original furniture and
equipment
Project Allocation 1,000,000
(v) Beaver Falls Readiness Center, Beaver
County
(A) Provide original furniture and
equipment
Project Allocation 1,000,000
(vi) Berks County Readiness Center, Berks
County
(A) Provide original furniture and
equipment
Project Allocation 1,000,000
(vii) Hollidaysburg Readiness Center, Blair
County
(A) Provide original furniture and
equipment
Project Allocation 1,000,000
(viii) Bucks County Readiness Centers, Bucks
County
(A) Provide original furniture and
equipment
Project Allocation 5,000,000
(ix) Bucks County Readiness Centers and
Maintenance Facilities, Bucks County
(A) Provide original furniture and
equipment
Project Allocation 2,000,000
(x) Butler Readiness Center, Butler County
20250HB1331PN2389 - 178 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) Provide original furniture and
equipment
Project Allocation 1,000,000
(xi) Cambria County Readiness Centers,
Cambria County
(A) Provide original furniture and
equipment
Project Allocation 1,000,000
(xii) Cambria County Readiness Centers and
Maintenance Facilities, Cambria County
(A) Provide original furniture and
equipment
Project Allocation 1,000,000
(xiii) Lehighton Readiness Centers, Carbon
County
(A) Provide original furniture and
equipment
Project Allocation 1,000,000
(xiv) Centre County Readiness Centers, Centre
County
(A) Provide original furniture and
equipment
Project Allocation 1,000,000
(xiv) Centre County Readiness Centers and
Maintenance Facilities, Centre County
(A) Provide original furniture and
equipment
Project Allocation 1,000,000
(xvi) State College Army and Air Readiness
Center, Centre County
20250HB1331PN2389 - 179 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) Provide original furniture and
equipment
Project Allocation 1,000,000
(xvii) Chester County Readiness Centers,
Chester County
(A) Provide original furniture and
equipment
Project Allocation 3,000,000
(xviii) Chester County Readiness Centers and
Maintenance Facilities, Chester County
(A) Provide original furniture and
equipment
Project Allocation 1,000,000
(xix) Southeastern Veterans Center, Chester
County
(A) Provide original furniture and
equipment
Project Allocation 1,000,000
(xx) Clearfield Readiness Center, Clearfield
County
(A) Provide original furniture and
equipment
Project Allocation 1,000,000
(xxi) Lock Haven Readiness Center, Clinton
County
(A) Provide original furniture and
equipment
Project Allocation 1,000,000
(xxii) Crawford County Readiness Centers and
Maintenance Facilities, Crawford County
20250HB1331PN2389 - 180 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) Provide original furniture and
equipment
Project Allocation 1,000,000
(xxiii) Carlisle Readiness Center, Cumberland
County
(A) Provide original furniture and
equipment
Project Allocation 1,000,000
(xxiv) Cumberland County Readiness Centers
and Maintenance Facilities, Cumberland
County
(A) Provide original furniture and
equipment
Project Allocation 1,000,000
(xxv) Dauphin County Readiness Centers,
Dauphin County
(A) Provide original furniture and
equipment
Project Allocation 1,000,000
(xxvi) Erie Readiness Center, Erie County
(A) Provide original furniture and
equipment
Project Allocation 1,000,000
(xxvii) Fayette County Readiness Center,
Fayette County
(A) Provide original furniture and
equipment
Project Allocation 2,000,000
(xxviii) Chambersburg Readiness Center,
Franklin County
20250HB1331PN2389 - 181 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) Provide original furniture and
equipment
Project Allocation 1,000,000
(xxix) Indiana Readiness Center, Indiana
County
(A) Provide original furniture and
equipment
Project Allocation 1,000,000
(xxx) Carbondale Readiness Center, Lackawanna
County
(A) Provide original furniture and
equipment
Project Allocation 1,000,000
(xxxi) Lackawanna County Readiness
Center/Field Maintenance Shop, Lackawanna
County
(A) Provide original furniture and
equipment
Project Allocation 1,000,000
(xxxii) Scranton Maintenance Shop, Lackawanna
County
(A) Provide original furniture and
equipment
Project Allocation 1,000,000
(xxxiii) Elizabethtown Readiness Center,
Lancaster County
(A) Provide original furniture and
equipment
Project Allocation 1,000,000
(xxxiv) New Castle Readiness Center, Lawrence
20250HB1331PN2389 - 182 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
County
(A) Provide original furniture and
equipment
Project Allocation 1,000,000
(xxxv) Fort Indiantown Gap, Lebanon County
(A) Provide original furniture and
equipment
Project Allocation 3,000,000
(xxxvi) Allentown Readiness Center, Lehigh
County
(A) Provide original furniture and
equipment
Project Allocation 1,000,000
(xxxvii) Luzerne County Readiness Centers,
Luzerne County
(A) Provide original furniture and
equipment
Project Allocation 2,000,000
(xxxviii) Williamsport Readiness Center,
Lycoming County
(A) Provide original furniture and
equipment
Project Allocation 1,000,000
(xxxix) Mercer County Readiness Centers,
Mercer County
(A) Provide original furniture and
equipment
Project Allocation 1,000,000
(xl) Mercer County Readiness Centers and
Maintenance Facilities, Mercer County
20250HB1331PN2389 - 183 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) Provide original furniture and
equipment
Project Allocation 1,000,000
(xli) Montgomery County Readiness Centers,
Montgomery County
(A) Provide original furniture and
equipment
Project Allocation 1,000,000
(xlii) Montgomery County Readiness Centers
and Maintenance Facilities, Montgomery
County
(A) Provide original furniture and
equipment
Project Allocation 5,000,000
(xliii) Danville Field Maintenance Building,
Montour County
(A) Provide original furniture and
equipment
Project Allocation 1,000,000
(xliv) Montour County Readiness Centers and
Maintenance Facilities, Montour County
(A) Provide original furniture and
equipment
Project Allocation 1,000,000
(xlv) Easton Readiness Center, Northampton
County
(A) Provide original furniture and
equipment
Project Allocation 1,000,000
(xlvi) Philadelphia County Readiness Centers,
20250HB1331PN2389 - 184 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Philadelphia County
(A) Provide original furniture and
equipment
Project Allocation 1,000,000
(xlvii) Schuylkill Readiness Center,
Schuylkill County
(A) Provide original furniture and
equipment
Project Allocation 1,000,000
(xlviii) Friedens Readiness Centers, Somerset
County
(A) Provide original furniture and
equipment
Project Allocation 1,000,000
(xlix) Washington Readiness Center,
Washington County
(A) Provide original furniture and
equipment
Project Allocation 1,000,000
(l) Honesdale Readiness Center, Wayne County
(A) Provide original furniture and
equipment
Project Allocation 1,000,000
(li) Westmoreland County Readiness Centers,
Westmoreland County
(A) Provide original furniture and
equipment
Project Allocation 1,000,000
(lii) York County Readiness Centers, York
County
20250HB1331PN2389 - 185 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) Provide original furniture and
equipment
Project Allocation 1,000,000
(liii) Veterans Homes, Statewide
(A) Provide original furniture and
equipment for renovations to six
Veterans Homes
Project Allocation 3,000,000
(liv) Veterans Homes, Statewide
(A) Provide original furniture and
equipment for renovations to six
Veterans Homes
Project Allocation 5,000,000
(11) State System of Higher Education
(i) Commonwealth University
(A) Lock Haven University, Clinton
County. Original furniture and
equipment for Stevenson Library
Project Allocation 3,000,000
(ii) PennWest University
(A) Edinboro, Erie County. Original
furniture and equipment for Wiley Hall
Project Allocation 1,500,000
(iii) Kutztown University, Berks County
(A) Original furniture and equipment for
Beekey Education Building
Project Allocation 2,000,000
(B) Original furniture and equipment for
Rickenbach Education Building
Project Allocation 2,000,000
20250HB1331PN2389 - 186 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(C) Original furniture and equipment for
Keystone Hall/fieldhouse upgrades
Project Allocation 1,000,000
(iv) West Chester University, Chester County
(A) Renovation, replacement or upgrade of
campus infrastructure
Project Allocation 4,000,000
(v) Cheyney University, Chester and Delaware
Counties
(A) Original furniture and equipment for
Ada Georges Dining Hall
Project Allocation 4,100,000
(vi) Indiana University, Indiana County
(A) Original furniture and equipment for
academic building
Project Allocation 6,800,000
(vii) Millersville University, Lancaster
County
(A) Original furniture and equipment for
Pucillo Hall
Project Allocation 1,700,000
(B) Original furniture and equipment for
Brooks Hall renovation to become
Lombardo College of Business
Project Allocation 1,000,000
(12) Office of Administration (Reserved)
(13) Pennsylvania State Police
(i) Statewide
(A) Provide original furniture and
equipment
20250HB1331PN2389 - 187 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 100,000,000
(14) Department of Transportation
(i) Lackawanna County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
Section 5. Itemization of transportation assistance projects.
(a) Mass transit.--Additional capital projects in the
category of transportation assistance projects for mass transit
in which an interest is to be acquired or constructed by the
Department of Transportation, its successors or assigns and to
be financed by the incurring of debt are hereby itemized,
together with their estimated financial costs, as follows:
Project
Total Project
Allocation
(1) Allegheny County
(i) Pittsburgh Regional Transit
(A) Bus replacement program. Provide
funds to match Federal capital funding
to replace buses.
Project Allocation 50,000,000
(B) Infrastructure Safety Renewal
Program. Improvements to stations,
signals, track, power, fixed
guideways, bridges, tunnels, incline
and operating/maintenance facilities
Project Allocation 50,000,000
(C) Bus and Rail Vehicle Overhaul
Program. Overhaul of existing bus and
rail car assets
20250HB1331PN2389 - 188 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 50,000,000
(D) ITS Hardware/Software Program.
Hardware and software for intelligent
station real time signage, including
information technology infrastructure
and enterprise software
Project Allocation 50,000,000
(E) New bus operating facility. This
project will provides Pittsburgh
Regional Transit a new operating
facility with the capacity of 230
buses, and supports both diesel and
electric buses
Project Allocation 236,000,000
(2) Beaver County
(i) Center Township
(A) Construction, infrastructure,
renovation and other related costs for
improvements at Beaver County Transit
Authority's Center Township Terminal
facility
Project Allocation 1,500,000
(3) Dauphin County
(i) City of Harrisburg
(A) Acquisition, construction,
demolition, renovations, site
improvements, infrastructure and other
related costs for the relocation of a
mass transit operation within the City
of Harrisburg
20250HB1331PN2389 - 189 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 25,000,000
(4) Bucks, Chester, Delaware, Montgomery and
Philadelphia Counties
(i) Southeastern Pennsylvania Transportation
Authority
(A) Urbanized Area Formula Program of
Projects. Provide funds to match
Federal capital funding to replace
buses and rehabilitate or replace
various facilities and infrastructure
to improve the system and bring assets
to a state of good repair
Project Allocation 150,000,000
(B) Federal State of Good Repair Program.
Provide funds to match Federal capital
funding to rehabilitate or replace
existing facilities, vehicles and
infrastructure to bring them to a
state of good repair
Project Allocation 220,000,000
(C) Bus and Bus Facilities Program.
Provide funds to match Federal capital
funding to rehabilitate or replace
existing bus facilities and vehicles
to bring them to a state of good
repair
Project Allocation 70,000,000
(D) Bus Purchase Flex Program. Provide
funds to match Federal capital funding
to replace buses and rehabilitate or
20250HB1331PN2389 - 190 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
replace various facilities and
infrastructure to bring them to a
state of good repair
Project Allocation 50,000,000
(E) Federal Grant Program. Projects
include vehicle purchases and
overhauls; signal system
modernization; accessibility, stations
and parking; new payment technologies,
system improvements and state-of-good-
repair initiatives
Project Allocation 250,000,000
(F) Infrastructure Safety Renewal
Program. Rehabilitate or replace
existing facilities and infrastructure
to bring them to a state of good
repair
Project Allocation 250,000,000
(G) State of Good Repair Program.
Rehabilitate or replace existing
facilities and infrastructure to bring
them to a state of good repair
Project Allocation 110,000,000
(H) System Improvements Program. Improve
transit service in Southeastern
Pennsylvania
Project Allocation 150,000,000
(b) Rural and intercity rail.--Additional capital projects
in the category of transportation assistance projects for rural
and intercity rail service projects to be constructed or with
20250HB1331PN2389 - 191 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
respect to which an interest is to be acquired by the Department
of Transportation, its successors or assigns and to be financed
by the incurring of debt are hereby itemized, together with
their respective estimated financial costs, as follows:
Project
Total Project
Allocation
(1) Adams County
(i) Susquehanna Area Regional Airport
Authority
(A) Construction, infrastructure and
other related costs for economic
development initiatives at Gettysburg
Regional Airport
Project Allocation 2,500,000
(B) Infrastructure, site work and other
costs associated with the
rehabilitation of existing aviation
facilities and construction of new
aviation facilities at Gettysburg
Regional Airport
Project Allocation 2,500,000
(2) Beaver County
(i) Beaver County Airport Authority
(A) Acquisition, construction,
infrastructure, redevelopment,
renovation and other related costs for
hangars and facility improvements
Project Allocation 2,500,000
(ii) Chippewa Township
(A) Construction, infrastructure,
20250HB1331PN2389 - 192 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
redevelopment, renovation and other
related costs for hangars and
facilities, classrooms and a control
tower at the Beaver County Community
College School of Aviation
Project Allocation 3,750,000
(3) York County
(i) Susquehanna Area Regional Airport
Authority
(A) Infrastructure, site work and other
costs associated with the
rehabilitation of existing aviation
facilities and construction of new
aviation facilities at the Capital
City Airport in Fairview Township
Project Allocation 2,500,000
(1) ALLEGHENY COUNTY
(I) METALTECH
(A) REHABILITATE AND EXPAND RAIL
INFRASTRUCTURE IN ALLEGHENY COUNTY,
INCLUDING ENGINEERING, SITE
PREPARATION, DRAINAGE, RIVERBANK
STABILIZATION, CULVERT REPAIR,
GRADING, LOADING/UNLOADING RAMP, CRANE
IMPROVEMENTS, SCALE RELOCATION,
CROSSING, LUBRICATOR, RAIL, TIES,
BALLAST, TURNOUTS AND ALL MATERIALS
NECESSARY FOR PROJECT COMPLETION
PROJECT ALLOCATION 4,000,000
(2) BERKS COUNTY
20250HB1331PN2389 - 193 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(I) H&K GROUP
(A) REHABILITATE AND CONSTRUCT RAIL
INFRASTRUCTURE IN BERKS COUNTY
(DOUGLASS TOWNSHIP), INCLUDING
ENGINEERING, SITE PREPARATION,
DRAINAGE, GRADING, RAIL, TIES,
BALLAST, TURNOUTS, LOADING/UNLOADING
EQUIPMENT, ELECTRIC UTILITY
RELOCATION, RETAINING WALLS,
CROSSINGS, EXTENSION OF BOX
CULVERT(S), RELOCATION OF EXISTING
QUARRY WEIGH SCALES AND ALL MATERIALS
NECESSARY FOR PROJECT COMPLETION
PROJECT ALLOCATION 7,000,000
(B) REHABILITATE RAIL INFRASTRUCTURE IN
BERKS COUNTY (ROBESON TOWNSHIP,
BIRDSBORO BOROUGH), INCLUDING
ENGINEERING, SITE PREPARATION,
DRAINAGE, GRADING, RAIL, TIES,
BALLAST, TURNOUTS, LOADING/UNLOADING
EQUIPMENT AND ALL MATERIALS NECESSARY
FOR PROJECT COMPLETION
PROJECT ALLOCATION 2,500,000
(3) BLAIR COUNTY
(I) SYNTHEX ORGANICS, LLC
(A) INITIATE RAIL SERVICE IN BLAIR
COUNTY, CONSTRUCT RAIL INFRASTRUCTURE,
INCLUDING ENGINEERING, SITE
PREPARATION, GRADING, RAIL, TIES,
BALLAST AND TURNOUTS
20250HB1331PN2389 - 194 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
PROJECT ALLOCATION 2,000,000
(4) CAMBRIA COUNTY
(I) LEHIGH VALLEY RAIL MANAGEMENT
(A) REHABILITATE AND CONSTRUCT RAIL
INFRASTRUCTURE IN CAMBRIA COUNTY,
INCLUDING ENGINEERING, SITE
PREPARATION, DRAINAGE, GRADING, RAIL,
TIES, BALLAST, TURNOUTS,
LOADING/UNLOADING EQUIPMENT,
CROSSINGS, BRIDGES, YARDS AND ALL
MATERIALS NECESSARY FOR PROJECT
COMPLETION
PROJECT ALLOCATION 17,500,000
(5) FRANKLIN COUNTY
(I) PENNSYLVANIA AND SOUTHERN RAILWAY
(A) REHABILITATE AND CONSTRUCT RAIL
INFRASTRUCTURE IN FRANKLIN COUNTY,
INCLUDING ENGINEERING, SITE
PREPARATION, DRAINAGE, GRADING, RAIL,
TIES, BALLAST, TURNOUTS, YARD TRACKS,
CROSSINGS, BRIDGES, LOADING/UNLOADING
EQUIPMENT AND ALL MATERIALS NECESSARY
FOR PROJECT COMPLETION
PROJECT ALLOCATION 4,000,000
(6) LEBANON COUNTY
(I) PEACHEY RAIL WORKS, LLC
(A) REHABILITATE AND CONSTRUCT RAIL
INFRASTRUCTURE IN LEBANON COUNTY,
INCLUDING ENGINEERING, SITE
PREPARATION, DRAINAGE, GRADING, RAIL,
20250HB1331PN2389 - 195 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
TIES, BALLAST, TURNOUTS,
LOADING/UNLOADING EQUIPMENT AND ALL
MATERIALS NECESSARY FOR PROJECT
COMPLETION
PROJECT ALLOCATION 3,500,000
(7) LEHIGH COUNTY
(I) LEHIGH VALLEY RAIL MANAGEMENT
(A) REHABILITATE AND CONSTRUCT RAIL
INFRASTRUCTURE IN LEHIGH COUNTY,
INCLUDING ENGINEERING, SITE
PREPARATION, DRAINAGE, GRADING, RAIL,
TIES, BALLAST, TURNOUTS,
LOADING/UNLOADING EQUIPMENT, BRIDGES,
YARDS AND ALL MATERIALS NECESSARY FOR
PROJECT COMPLETION
PROJECT ALLOCATION 10,000,000
(8) NORTHUMBERLAND COUNTY
(I) BOYD STATION
(A) CONSTRUCT RAIL INFRASTRUCTURE IN
NORTHUMBERLAND COUNTY TO FACILITATE AN
EXPANSION OF THE RAILROAD TERMINAL,
INCLUDING ENGINEERING, SITE
PREPARATION, GRADING, RAIL, TIES,
BALLAST, TURNOUTS, BUMPERS, DERAILS,
BRIDGE, RAIL SCALE, LOADING/UNLOADING
EQUIPMENT, CANOPY AND PRODUCT STORAGE
PROJECT ALLOCATION 9,100,000
(9) YORK COUNTY
(I) YORK COUNTY ECONOMIC ALLIANCE
(A) ACQUISITION, CONSTRUCTION,
20250HB1331PN2389 - 196 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
INFRASTRUCTURE, REDEVELOPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS, MACHINERY AND EQUIPMENT AND
OTHER RELATED COSTS FOR THE STEAM INTO
HISTORY RAIL LINE EXTENSION PROJECT
PROJECT ALLOCATION 7,500,000
(10) MULTIPLE COUNTIES
(I) ALLEGHENY VALLEY RAILROAD
(A) CONSTRUCT NEW SIDETRACKS AND YARD
TRACKS TO INCREASE CAPACITY TO SUPPORT
CUSTOMER AND INTERMODAL DEVELOPMENT IN
ALLEGHENY AND WASHINGTON COUNTIES
PROJECT ALLOCATION 10,000,000
(B) REHABILITATE AND CONSTRUCT RAIL
INFRASTRUCTURE AND EQUIPMENT TO
SUPPORT NEW CUSTOMER DEVELOPMENT AND
EXISTING CUSTOMER EXPANSIONS IN
ALLEGHENY AND WASHINGTON COUNTIES
PROJECT ALLOCATION 5,000,000
(II) NORTH SHORE RAILROAD
(A) REHABILITATE RAIL INFRASTRUCTURE,
INCLUDING RAIL REPLACEMENT, TIES,
BALLAST, SWITCHES, SIGNALS, CROSSINGS,
BRIDGES AND ALL MATERIALS NECESSARY
FOR THE IMPROVEMENT OF EXISTING TRACK
IN AREAS OPERATED BY NORTH SHORE
RAILROAD COMPANY
PROJECT ALLOCATION 7,000,000
(III) R.J. CORMAN RAILROAD GROUP
(A) ACQUISITION, CONSTRUCTION,
20250HB1331PN2389 - 197 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
INFRASTRUCTURE AND OTHER RELATED COSTS
FOR REHABILITATION OF THE RAIL LINE
LOCATED IN CAMBRIA, CENTRE,
CLEARFIELD, CLINTON AND INDIANA
COUNTIES, INCLUDING RAILBED, TIES,
RAIL AND OTHER MATERIALS TO SUPPORT
BUSINESS GROWTH AND IMPROVE SAFETY
PROJECT ALLOCATION 20,000,000
(IV) SOUTHWEST PENNSYLVANIA RAILROAD
(A) REHABILITATE EXISTING RAILROAD
INFRASTRUCTURE TO IMPROVE OPERATIONAL
CAPACITY AND EFFICIENCY, INCLUDING
PLANNING AND ENGINEERING, DRAINAGE,
RAIL REPLACEMENT, TIES, RELATED TRACK
MATERIALS, BRIDGES AND GRADE CROSSINGS
IN WESTMORELAND AND FAYETTE COUNTIES
PROJECT ALLOCATION 8,400,000
(B) CONSTRUCT NEW SIDETRACKS AND YARD
TRACKS TO INCREASE CAPACITY TO SUPPORT
CUSTOMER AND INTERMODAL DEVELOPMENT IN
WESTMORELAND AND FAYETTE COUNTIES
PROJECT ALLOCATION 5,600,000
(C) REHABILITATE AND CONSTRUCT RAIL
INFRASTRUCTURE AND EQUIPMENT TO
SUPPORT NEW CUSTOMER DEVELOPMENT AND
EXISTING CUSTOMER EXPANSIONS IN
WESTMORELAND AND FAYETTE COUNTIES
PROJECT ALLOCATION
(V) WEST CHESTER PASSENGER RAIL SERVICE
RESTORATION
20250HB1331PN2389 - 198 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) CONSTRUCTION AND REHABILITATION OF
TRACK, SIGNAL, STATION,
PEDESTRIAN/ANCILLARY FACILITIES AND
SAFETY INFRASTRUCTURE FOR OPERATION OF
WEST CHESTER RAILROAD TOURIST TRAINS,
RESTORATION OF COMMON CARRIER
PASSENGER RAIL SERVICE TO WEST
CHESTER, WEST CHESTER UNIVERSITY,
CHEYNEY UNIVERSITY AND WAWA AND
RESTORATION OF FREIGHT RAIL SERVICE
PROJECT ALLOCATION 25,000,000
(c) Air transportation.--Additional capital projects in the
category of transportation assistance projects for air
transportation service to which an interest is to be acquired by
the Department of Transportation, it successors or assigns and
to be financed by the incurring of debt are hereby itemized,
together with their respective estimated financial costs, as
follows:
Project
Total Project
Allocation
(1) Northumberland County
(i) Boyd Station
(A) Construct rail infrastructure in
Northumberland County to facilitate an
expansion of the railroad terminal,
including engineering, site
preparation, grading, rail, ties,
ballast, turnouts, bumpers, derails,
bridge, rail scale, loading/unloading
equipment, canopy and product storage
20250HB1331PN2389 - 199 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 9,100,000
(2) York County
(i) York County Economic Alliance
(A) Acquisition, construction,
infrastructure, redevelopment,
renovation, abatement of hazardous
materials, machinery and equipment and
other related costs for the Steam Into
History rail line extension project
Project Allocation 7,500,000
(3) Multiple Counties
(i) North Shore Railroad
(A) Rehabilitate rail infrastructure,
including rail replacement, ties,
ballast, switches, signals, crossings,
bridges and all materials necessary
for the improvement of existing track
in areas operated by North Shore
Railroad Company
Project Allocation 7,000,000
(ii) Southwest Pennsylvania Railroad
(A) Rehabilitate existing railroad
infrastructure to improve operational
capacity and efficiency, including
planning and engineering, drainage,
rail replacement, ties, related track
materials, bridges and grade crossings
in Westmoreland and Fayette Counties
Project Allocation 8,400,000
(B) Construct new sidetracks and yard
20250HB1331PN2389 - 200 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
tracks to increase capacity to support
customer and intermodal development in
Westmoreland and Fayette Counties
Project Allocation 5,600,000
(iii) R.J. Corman Railroad Group
(A) Acquisition, construction,
infrastructure and other related costs
for rehabilitation of the rail line
located in Cambria, Centre,
Clearfield, Clinton and Indiana
Counties, including railbed, ties,
rail and other materials to support
business growth and improve safety
Project Allocation 20,000,000
(iv) West Chester Passenger Rail Service
Restoration
(A) Construction and rehabilitation of
track, signal, station,
pedestrian/ancillary facilities and
safety infrastructure for operation of
West Chester Railroad tourist trains,
restoration of common carrier
passenger rail service to West
Chester, West Chester University,
Cheyney University and Wawa and
restoration of freight rail service
Project Allocation 25,000,000
(1) ADAMS COUNTY
(I) SUSQUEHANNA AREA REGIONAL AIRPORT
AUTHORITY
20250HB1331PN2389 - 201 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) CONSTRUCTION, INFRASTRUCTURE AND
OTHER RELATED COSTS FOR ECONOMIC
DEVELOPMENT INITIATIVES AT GETTYSBURG
REGIONAL AIRPORT
PROJECT ALLOCATION 2,500,000
(B) INFRASTRUCTURE, SITE WORK AND OTHER
COSTS ASSOCIATED WITH THE
REHABILITATION OF EXISTING AVIATION
FACILITIES AND CONSTRUCTION OF NEW
AVIATION FACILITIES AT GETTYSBURG
REGIONAL AIRPORT
PROJECT ALLOCATION 2,500,000
(2) BEAVER COUNTY
(I) BEAVER COUNTY AIRPORT AUTHORITY
(A) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, REDEVELOPMENT,
RENOVATION AND OTHER RELATED COSTS FOR
HANGARS AND FACILITY IMPROVEMENTS
PROJECT ALLOCATION 2,500,000
(II) CHIPPEWA TOWNSHIP
(A) CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION AND OTHER
RELATED COSTS FOR HANGARS AND
FACILITIES, CLASSROOMS AND A CONTROL
TOWER AT THE BEAVER COUNTY COMMUNITY
COLLEGE SCHOOL OF AVIATION
PROJECT ALLOCATION 3,750,000
(3) TIOGA COUNTY
(I) GRAND CANYON AIRPORT AUTHORITY
(A) CONSTRUCTION, INFRASTRUCTURE,
20250HB1331PN2389 - 202 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
REDEVELOPMENT, RENOVATION AND OTHER
RELATED COSTS FOR TERMINAL AREA AND
AIRPORT IMPROVEMENTS, INCLUDING SAFETY
IMPROVEMENTS TO INFRASTRUCTURE AND
DEVELOPMENT FOR NEW OPPORTUNITIES TO
ACCOMMODATE THE GROWING INTEREST IN
AVIATION AT HIGH SCHOOLS
PROJECT ALLOCATION 10,000,000
(4) YORK COUNTY
(I) SUSQUEHANNA AREA REGIONAL AIRPORT
AUTHORITY
(A) INFRASTRUCTURE, SITE WORK AND OTHER
COSTS ASSOCIATED WITH THE
REHABILITATION OF EXISTING AVIATION
FACILITIES AND CONSTRUCTION OF NEW
AVIATION FACILITIES AT THE CAPITAL
CITY AIRPORT IN FAIRVIEW TOWNSHIP
PROJECT ALLOCATION 2,500,000
Section 6. Itemization of redevelopment assistance projects.
Additional capital projects in the category of redevelopment
assistance projects for capital grants by the Department of
Community and Economic Development, its successors or assigns,
authorized under the provisions of the act of May 20, 1949
(P.L.1633, No.493), known as the Housing and Redevelopment
Assistance Law, and redevelopment assistance capital projects
and to be financed by the incurring of debt, are hereby
itemized, together with their estimated financial costs, as
follows:
Project
Total Project
Allocation
20250HB1331PN2389 - 203 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(1) Adams County
(i) County projects
(A) Site preparation, acquisition,
renovation, construction,
redevelopment, infrastructure and/or
other costs associated with the
development of a community and/or
economic development project
Project Allocation 20,000,000
(B) ACQUISITION, CONSTRUCTION,
DEMOLITION, INFRASTRUCTURE, RENOVATION
AND OTHER RELATED COSTS AT THE
LUTHERAN THEOLOGICAL SEMINARY AT
GETTYSBURG
PROJECT ALLOCATION 10,000,000
(ii) Adams County Industrial Development
Authority
(A) Site preparation, acquisition,
renovation, construction,
redevelopment, infrastructure and/or
other costs associated with
developing, expanding and/or improving
Adams County Technical Institute
facilities
Project Allocation 10,000,000
(B) Site preparation, acquisition,
renovation, construction,
redevelopment, remediation,
infrastructure and/or other associated
costs to improve or expand TrueNorth
20250HB1331PN2389 - 204 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Wellness Services facilities in Adams
County
Project Allocation 3,000,000
(C) Site preparation, acquisition,
renovation, construction,
redevelopment, remediation,
infrastructure and/or other associated
costs to improve or expand TrueNorth
Wellness Services facilities in Adams
County
Project Allocation 10,000,000
(D) Site preparation, acquisition,
renovation, construction, remediation,
infrastructure and/or other associated
costs to redevelop a former foundry
site in Cumberland Township
Project Allocation 5,000,000
(E) Site preparation, acquisition,
renovation, construction,
redevelopment, infrastructure and/or
other costs associated with
developing, expanding and/or improving
Adams County Children's Advocacy
Center facilities
Project Allocation 3,500,000
(F) Site preparation, acquisition,
renovation, construction,
redevelopment, infrastructure, and/or
other associated costs for the
development of a Pennsylvania
20250HB1331PN2389 - 205 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Agricultural Discovery Center
Project Allocation 10,000,000
(iii) Susquehanna Regional Airport Authority
(A) Construction, infrastructure and
other related costs for economic
development initiatives at Gettysburg
Regional Airport
Project Allocation 2,500,000
(iv) Carroll Valley Borough
(A) Site preparation, acquisition,
renovation, construction,
redevelopment, infrastructure,
abatement of hazardous materials
and/or other associated costs for a
community and/or economic development
project
Project Allocation 5,000,000
(v) Cumberland Township
(A) Site preparation, acquisition,
renovation, construction,
redevelopment, infrastructure and/or
other associated costs for the
construction of a community and/or
economic development project
Project Allocation 5,000,000
(2) Allegheny County
(i) County projects
(A) Abatement, acquisition, construction,
infrastructure, redevelopment and
rehabilitation for economic
20250HB1331PN2389 - 206 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
development projects located in
Allegheny County
Project Allocation 500,000,000
(B) Construction, infrastructure,
abatement of hazardous materials,
acquisition, redevelopment,
renovation, rehabilitation and other
related costs for improvements within
the North Allegheny School District
Project Allocation 10,000,000
(C) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS, INCLUDING MACHINERY AND
EQUIPMENT, FOR AN ECONOMIC DEVELOPMENT
PROJECT IN ALLEGHENY COUNTY
PROJECT ALLOCATION 30,000,000
(D) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS, INCLUDING MACHINERY AND
EQUIPMENT, FOR AN ECONOMIC DEVELOPMENT
OR COMMUNITY ASSET PROJECT IN
ALLEGHENY COUNTY
PROJECT ALLOCATION 15,000,000
(E) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
20250HB1331PN2389 - 207 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS, INCLUDING MACHINERY AND
EQUIPMENT, FOR A MIXED-USE ECONOMIC
DEVELOPMENT PROJECT INVOLVING THE
REVITALIZATION OF THE DIVINE
PROVIDENCE HOSPITAL SITE
PROJECT ALLOCATION 10,000,000
(F) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, REDEVELOPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS AND OTHER RELATED COSTS FOR
A RIVERFRONT MIXED-USE DEVELOPMENT IN
SHARPSBURG BOROUGH AND O'HARA TOWNSHIP
PROJECT ALLOCATION 10,000,000
(G) CONSTRUCTION, REDEVELOPMENT,
RENOVATION, REHABILITATION,
INFRASTRUCTURE, ABATEMENT OF HAZARDOUS
MATERIALS AND OTHER COSTS ASSOCIATED
WITH THE DEVELOPMENT OF A SITE ALONG
THE ALLEGHENY RIVER IN SHARPSBURG
BOROUGH AND O'HARA TOWNSHIP
PROJECT ALLOCATION 10,000,000
(ii) Allegheny County Department of Economic
Development
(A) Construction, infrastructure,
abatement of hazardous materials,
redevelopment, renovation and other
related costs for St. Clair Health
Project Allocation 18,000,000
(B) ACQUISITION, CONSTRUCTION,
20250HB1331PN2389 - 208 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
INFRASTRUCTURE, REDEVELOPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS AND OTHER RELATED COSTS FOR
A NEW FACILITY TO HOLD OFFICES AND
OPERATIONS OF 412 FOOD RESCUE IN
MILLVALE
PROJECT ALLOCATION 2,000,000
(iii) McCandless Township Sanitary Authority
(A) Infrastructure, redevelopment and
other related costs for an economic
development project in McCandless
Township
Project Allocation 2,500,000
(iv) Redevelopment Authority of Allegheny
County
(A) Infrastructure, renovation and other
related costs to upgrade
infrastructure equipment in the
Pittsburgh Supercomputing Center data
center
Project Allocation 2,000,000
(B) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, REDEVELOPMENT,
RENOVATION, MACHINERY AND EQUIPMENT
AND OTHER RELATED COSTS FOR THE
WESTERN PENNSYLVANIA SCHOOL FOR THE
DEAF IN THE BOROUGH OF EDGEWOOD
PROJECT ALLOCATION 5,000,000
(C) CONSTRUCTION, INFRASTRUCTURE, SITE
IMPROVEMENTS, POSSIBLE ABATEMENT OF
20250HB1331PN2389 - 209 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
HAZARDOUS MATERIALS,
RENOVATION/REHABILITATION AND OTHER
RELATED COSTS FOR AN ECONOMIC
DEVELOPMENT PROJECT RELATING TO THE
REDEVELOPMENT OF THE FORMER
WESTINGHOUSE ELECTRIC FACILITY LOCATED
IN TURTLE CREEK AND EAST PITTSBURGH
PROJECT ALLOCATION 30,000,000
(D) CONSTRUCTION, ACQUISITION,
INFRASTRUCTURE AND OTHER RELATED COSTS
FOR EXPANSION, IMPROVEMENT AND
RESTORATION OF URBAN PARKS AND
FACILITIES
PROJECT ALLOCATION 20,000,000
(E) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE AND OTHER RELATED COSTS
FOR AN ECONOMIC DEVELOPMENT PROJECT IN
OAKMONT BOROUGH
PROJECT ALLOCATION 10,000,000
(F) ABATEMENT, ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE AND REDEVELOPMENT OF
ECONOMIC DEVELOPMENT PROJECTS IN THE
MONONGAHELA VALLEY
PROJECT ALLOCATION 200,000,000
(v) Urban Redevelopment Authority of
Pittsburgh
(A) Construction, infrastructure,
acquisition, redevelopment and other
related costs for the Nine Mile Run
Phase III, Swisshelm Park Solar and
20250HB1331PN2389 - 210 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
expansion of Frick Park projects
Project Allocation 20,000,000
(B) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, REDEVELOPMENT,
RENOVATION, MACHINERY AND EQUIPMENT
AND OTHER RELATED COSTS FOR A LICENSED
ADULT RESPITE AND DAY SERVICES
PROVIDER IN THE CITY OF PITTSBURGH
PROJECT ALLOCATION 5,000,000
(C) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, REDEVELOPMENT,
RENOVATION, MACHINERY AND EQUIPMENT
AND OTHER RELATED COSTS FOR THE
WESTERN PENNSYLVANIA SCHOOL FOR BLIND
CHILDREN
PROJECT ALLOCATION 5,000,000
(D) CONSTRUCTION, DEMOLITION,
INFRASTRUCTURE, REDEVELOPMENT AND
OTHER RELATED COSTS FOR GRANDVIEW
AVENUE CORRIDOR IMPROVEMENTS
PROJECT ALLOCATION 3,000,000
(E) CONSTRUCTION, INFRASTRUCTURE, SITE
IMPROVEMENTS,
RENOVATION/REHABILITATION AND OTHER
RELATED COSTS FOR AN ECONOMIC
DEVELOPMENT PROJECT RELATING TO THE
REDEVELOPMENT OF THE FAIRYWOOD
INDUSTRIAL PARK LOCATED IN THE CITY OF
PITTSBURGH
PROJECT ALLOCATION 3,000,000
20250HB1331PN2389 - 211 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(F) CONSTRUCTION, INFRASTRUCTURE, SITE
IMPROVEMENTS, ABATEMENT OF HAZARDOUS
MATERIALS, RENOVATION/REHABILITATION
AND OTHER RELATED COSTS FOR AN
ECONOMIC DEVELOPMENT PROJECT RELATING
TO THE REDEVELOPMENT OF THE FORMER
MILL 18 AND 19 SITES LOCATED IN THE
HAZELWOOD COMMUNITY OF THE CITY OF
PITTSBURGH PROJECT
PROJECT ALLOCATION 20,000,000
(G) CONSTRUCTION, ACQUISITION,
INFRASTRUCTURE, SITE IMPROVEMENTS,
ABATEMENT OF HAZARDOUS MATERIALS,
RENOVATION/REHABILITATION AND OTHER
RELATED COSTS FOR PROJECTS IN
ALLEGHENY COUNTY
PROJECT ALLOCATION 50,000,000
(H) CONSTRUCTION, ACQUISITION,
INFRASTRUCTURE, SITE IMPROVEMENTS,
ABATEMENT OF HAZARDOUS MATERIALS,
RENOVATION/REHABILITATION AND OTHER
RELATED COSTS FOR IMPROVEMENTS ON 62ND
STREET
PROJECT ALLOCATION 3,000,000
(I) CONSTRUCTION, ACQUISITION,
INFRASTRUCTURE, SITE IMPROVEMENTS,
ABATEMENT OF HAZARDOUS MATERIALS,
RENOVATION/REHABILITATION AND OTHER
RELATED COSTS FOR CULTURAL, CIVIC OR
HISTORIC PROJECTS
20250HB1331PN2389 - 212 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
PROJECT ALLOCATION 10,000,000
(J) CONSTRUCTION, ACQUISITION,
INFRASTRUCTURE, RENOVATION,
REHABILITATION AND OTHER COSTS RELATED
TO REVITALIZATION PROJECTS THROUGHOUT
COMMERCIAL CORRIDORS IN PITTSBURGH
PROJECT ALLOCATION 50,000,000
(K) PREDEVELOPMENT COSTS, ACQUISITION,
CONSTRUCTION, INFRASTRUCTURE,
ENVIRONMENTAL REMEDIATION,
REDEVELOPMENT AND OTHER RELATED COSTS
FOR THE SCI SITE
PROJECT ALLOCATION 50,000,000
(L) ACQUISITION, DEMOLITION, SITE WORK,
REMEDIATION, RENOVATION, CONSTRUCTION
AND OTHER RELATED COSTS FOR
DEVELOPMENT OF BLIGHTED PROPERTIES
PROJECT ALLOCATION 14,000,000
(vi) City of Pittsburgh
(A) Acquisition, construction,
infrastructure development,
redevelopment, abatement, renovation,
rehabilitation and other related costs
for Point Park University's (PPU)
Downtown Pittsburgh Renaissance III
project, located in the downtown area
of the City of Pittsburgh
Project Allocation 25,000,000
(B) Construction, redevelopment and
related costs for the Manchester
20250HB1331PN2389 - 213 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Academic Charter School's expanded
campus
Project Allocation 6,000,000
(C) Construction and related costs for a
health sciences building at Duquesne
University
Project Allocation 3,000,000
(D) Acquisition, infrastructure and other
related costs for a mixed-use
development with an emphasis on
technology and research and
development located in the Hazelwood
and Oakland neighborhoods
Project Allocation 4,000,000
(E) Acquisition, construction,
infrastructure, rehabilitation and
other related costs for the Pittsburgh
Downtown Commercial Office Conversion
Program project
Project Allocation 50,000,000
(F) Construction, infrastructure,
environmental remediation, acquisition
and other related costs for the former
St. Clair Village site
Project Allocation 20,000,000
(G) Facilities construction,
infrastructure improvements,
renovations and other costs for
Carnegie Science Center
Project Allocation 10,000,000
20250HB1331PN2389 - 214 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(H) Facilities construction,
infrastructure improvements,
renovations and other costs for The
Andy Warhol Museum
Project Allocation 10,000,000
(I) Construction, infrastructure,
acquisition, redevelopment and other
related costs for improvements at the
Carnegie Museum of Natural History
Project Allocation 10,000,000
(J) Construction, infrastructure,
acquisition, redevelopment and other
related costs for the Carnegie Museums
Project Allocation 10,000,000
(K) Construction, infrastructure,
abatement of hazardous materials and
other related costs for improvements
to the Carnegie Library of Pittsburgh
library system and branches
Project Allocation 7,500,000
(L) Acquisition, renovation,
rehabilitation and other related costs
for building upgrades and outdoor
improvements for Brookline Teen
Outreach
Project Allocation 1,000,000
(M) Construction, infrastructure,
acquisition, redevelopment and other
related costs for improvements to the
Carnegie Museum of Art
20250HB1331PN2389 - 215 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 10,000,000
(N) Construction and other related costs
for the renovation of a historic
landmark in the strip district
Project Allocation 500,000
(O) Construction, infrastructure,
acquisition, redevelopment, renovation
and other related costs for an
economic development project for Point
Park University
Project Allocation 2,500,000
(P) Facilities construction,
infrastructure improvements,
renovations and other costs for
Carnegie Museum of Art
Project Allocation 20,000,000
(Q) Acquisition, remediation,
redevelopment, construction and other
related costs for a facility or campus
to support the operations and
expansion of the Pittsburgh Robotics
Network and its member organizations
Project Allocation 20,000,000
(R) CONSTRUCTION, INFRASTRUCTURE AND
OTHER RELATED COSTS FOR THE PITTSBURGH
SYMPHONY ORCHESTRA HEINZ HALL
RENOVATION PROJECT
PROJECT ALLOCATION 25,000,000
(S) CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT AND OTHER RELATED COSTS
20250HB1331PN2389 - 216 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
FOR PROJECTS AT THE FRICK ART AND
HISTORICAL CENTER
PROJECT ALLOCATION 25,000,000
(T) CONSTRUCTION, ACQUISITION,
INFRASTRUCTURE AND OTHER RELATED COSTS
FOR EXPANSION, IMPROVEMENT AND
RESTORATION OF URBAN PARKS AND
FACILITIES
PROJECT ALLOCATION 20,000,000
(U) ACQUISITION, INFRASTRUCTURE,
RENOVATION, REHABILITATION,
CONSTRUCTION AND OTHER RELATED COSTS
FOR THE DEVELOPMENT OF ATHLETIC
FACILITIES, INCLUDING TURF FIELDS AND
TRACKS IN SQUIRREL HILL
PROJECT ALLOCATION 2,000,000
(V) SITE PREPARATION, CONSTRUCTION,
DEMOLITION, REHABILITATION, EXPANSION
AND OTHER RELATED COSTS FOR THE
CHILDREN'S INSTITUTE'S SQUIRREL HILL
FACILITY
PROJECT ALLOCATION 7,500,000
(W) NEW CONSTRUCTION, INFRASTRUCTURE
IMPROVEMENTS AND RENOVATIONS THAT
CREATE INCLUSIVE AND SUSTAINABLE
LEARNING ENVIRONMENTS ON OR NEAR THE
CHILDREN'S MUSEUM OF PITTSBURGH'S
NORTHSIDE CAMPUS IN THE CITY OF
PITTSBURGH
PROJECT ALLOCATION 10,000,000
20250HB1331PN2389 - 217 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(X) PROCUREMENT, CONSTRUCTION AND
INFRASTRUCTURE UPGRADES NEEDED TO
PREPARE THE CARLOW UNIVERSITY CAMPUS
IN THE CITY OF PITTSBURGH FOR PURCHASE
AND INSTALLATION OF A CENTRAL NATURAL
GAS-POWERED EMERGENCY GENERATOR
PROJECT ALLOCATION 1,000,000
(Y) CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT AND OTHER RELATED COSTS
FOR IMPROVEMENTS TO PREPARE A
STRATEGIC PARCEL OF LAND ON THE CARLOW
UNIVERSITY CAMPUS IN THE OAKLAND
NEIGHBORHOOD OF PITTSBURGH
PROJECT ALLOCATION 1,000,000
(Z) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, REDEVELOPMENT AND
OTHER RELATED COSTS FOR THE HILL TOP
HOMES PROJECT
PROJECT ALLOCATION 5,000,000
(AA) CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT AND OTHER RELATED COSTS
FOR IMPROVEMENTS AT MATTRESS FACTORY
FACILITIES
PROJECT ALLOCATION 10,000,000
(BB) SITE PREPARATION, CONSTRUCTION,
DEMOLITION, REHABILITATION, EXPANSION
AND OTHER RELATED COSTS FOR THE
CHILDREN'S INSTITUTE'S SQUIRREL HILL
FACILITY
PROJECT ALLOCATION 7,500,000
20250HB1331PN2389 - 218 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(CC) SITE PREPARATION, ACQUISITION,
INFRASTRUCTURE, DEMOLITION,
REHABILITATION, EXPANSION,
CONSTRUCTION AND OTHER RELATED COSTS
FOR THE KELLY STRAYHORN THEATER AND
ALLOY STUDIOS
PROJECT ALLOCATION 3,000,000
(DD) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, REDEVELOPMENT AND
OTHER RELATED COSTS TO ACQUIRE
PROPERTY IN THE CITY OF PITTSBURGH
PROJECT ALLOCATION 10,000,000
(EE) CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT AND OTHER RELATED COSTS
FOR RENOVATIONS AT THE CLEMENTE MUSEUM
PROJECT ALLOCATION 600,000
(FF) CONSTRUCTION, REDEVELOPMENT AND
OTHER RELATED COSTS FOR RENOVATIONS AT
DUQUESNE UNIVERSITY
PROJECT ALLOCATION 20,000,000
(vii) Bellevue Borough
(A) Acquisition, design, construction,
infrastructure redevelopment,
rehabilitation, renovation, facility
improvements, machinery and equipment
and other costs related to the Mid-
Atlantic Mother's Milk Bank expansion
project
Project Allocation 6,000,000
(viii) Bethel Park Borough
20250HB1331PN2389 - 219 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) Acquisition, construction,
infrastructure, redevelopment,
renovation, abatement of hazardous
materials and/or related costs for a
redevelopment project
Project Allocation 10,000,000
(VIII.1) CRAFTON BOROUGH
(A) ACQUISITION, CONSTRUCTION,
RECONSTRUCTION, REHABILITATION,
RENOVATION, ENVIRONMENTAL AND
HAZARDOUS ASSESSMENT AND REMEDIATION,
INFRASTRUCTURE IMPROVEMENTS AND OTHER
RELATED COSTS FOR AN ECONOMIC
DEVELOPMENT PROJECT
PROJECT ALLOCATION 10,000,000
(VIII.2) FOX CHAPEL BOROUGH
(A) CONSTRUCTION, ACQUISITION,
INFRASTRUCTURE, ENVIRONMENTAL
REMEDIATION, RENOVATION AND OTHER
RELATED COSTS FOR THE DEVELOPMENT OF
AN INTERNATIONAL CONSERVATION CENTER
FOR THE NATIONAL AVIARY PITTSBURGH
INC.
PROJECT ALLOCATION 10,000,000
(VIII.3) GREEN TREE BOROUGH
(A) ACQUISITION, CONSTRUCTION,
RECONSTRUCTION, REHABILITATION,
RENOVATION, ENVIRONMENTAL AND
HAZARDOUS ASSESSMENT AND REMEDIATION,
INFRASTRUCTURE IMPROVEMENTS AND OTHER
20250HB1331PN2389 - 220 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
RELATED COSTS FOR AN ECONOMIC
DEVELOPMENT PROJECT
PROJECT ALLOCATION 10,000,000
(VIII.4) HEIDELBERG BOROUGH
(A) ACQUISITION, CONSTRUCTION,
RECONSTRUCTION, REHABILITATION,
RENOVATION, ENVIRONMENTAL AND
HAZARDOUS ASSESSMENT AND REMEDIATION,
INFRASTRUCTURE IMPROVEMENTS AND OTHER
RELATED COSTS FOR AN ECONOMIC
DEVELOPMENT PROJECT
PROJECT ALLOCATION 10,000,000
(VIII.5) INGRAM BOROUGH
(A) ACQUISITION, CONSTRUCTION,
RECONSTRUCTION, REHABILITATION,
RENOVATION, ENVIRONMENTAL AND
HAZARDOUS ASSESSMENT AND REMEDIATION,
INFRASTRUCTURE IMPROVEMENTS AND OTHER
RELATED COSTS FOR AN ECONOMIC
DEVELOPMENT PROJECT
PROJECT ALLOCATION 10,000,000
(VIII.6) MARSHALL TOWNSHIP
(A) ACQUISITION, CONSTRUCTION,
RECONSTRUCTION, REHABILITATION,
RENOVATION, ENVIRONMENTAL AND
HAZARDOUS ASSESSMENT AND REMEDIATION,
INFRASTRUCTURE IMPROVEMENTS AND OTHER
RELATED COSTS FOR AN ECONOMIC
DEVELOPMENT PROJECT
PROJECT ALLOCATION 10,000,000
20250HB1331PN2389 - 221 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(VIII.7) MCKEES ROCKS BOROUGH
(A) CONSTRUCTION, INFRASTRUCTURE,
ACQUISITION, REDEVELOPMENT AND OTHER
RELATED COSTS FOR THE EXPANSION OF
MANCINI'S BAKERY
PROJECT ALLOCATION 1,000,000
(ix) Mount Oliver Borough
(A) Construction, infrastructure,
redevelopment, renovation,
rehabilitation and related costs for
the Transverse Park Phase 1
improvements
Project Allocation 1,000,000
(B) Construction, infrastructure,
abatement of hazardous materials,
acquisition, redevelopment and other
related costs for a partnership
between LEVEL and the municipality to
acquire five vacant lots
Project Allocation 7,000,000
(IX.1) PENN HILLS TOWNSHIP
(A) SITE PREPARATION, REMEDIATION,
CONSTRUCTION, INFRASTRUCTURE,
RENOVATIONS, REDEVELOPMENT, EQUIPMENT
PURCHASES AND OTHER RELATED COSTS FOR
TURNER DAIRY FARM
PROJECT ALLOCATION 2,000,000
(B) SITE PREPARATION, REMEDIATION,
CONSTRUCTION, INFRASTRUCTURE,
RENOVATIONS, REDEVELOPMENT AND OTHER
20250HB1331PN2389 - 222 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
RELATED COSTS FOR THE PENN HILLS
LIBRARY
PROJECT ALLOCATION 5,000,000
(IX.2) PLUM BOROUGH
(A) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE AND OTHER RELATED COSTS
FOR AN ECONOMIC DEVELOPMENT PROJECT IN
PLUM BOROUGH
PROJECT ALLOCATION 10,000,000
(IX.3) ROSSLYN FARMS BOROUGH
(A) ACQUISITION, CONSTRUCTION,
RECONSTRUCTION, REHABILITATION,
RENOVATION, ENVIRONMENTAL AND
HAZARDOUS ASSESSMENT AND REMEDIATION,
INFRASTRUCTURE IMPROVEMENTS AND OTHER
RELATED COSTS FOR AN ECONOMIC
DEVELOPMENT PROJECT
PROJECT ALLOCATION 10,000,000
(IX.4) SEWICKLEY BOROUGH
(A) INFRASTRUCTURE, CONSTRUCTION,
REHABILITATION, EQUIPMENT AND OTHER
RELATED COSTS FOR VERLAND'S MAIN
CAMPUS IN SEWICKLEY BOROUGH
PROJECT ALLOCATION 2,000,000
(IX.5) SCOTT TOWNSHIP
(A) ACQUISITION, CONSTRUCTION,
RECONSTRUCTION, REHABILITATION,
RENOVATION, ENVIRONMENTAL AND
HAZARDOUS ASSESSMENT AND REMEDIATION,
INFRASTRUCTURE IMPROVEMENTS AND OTHER
20250HB1331PN2389 - 223 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
RELATED COSTS FOR AN ECONOMIC
DEVELOPMENT PROJECT
PROJECT ALLOCATION 10,000,000
(IX.6) THORNBURG BOROUGH
(A) ACQUISITION, CONSTRUCTION,
RECONSTRUCTION, REHABILITATION,
RENOVATION, ENVIRONMENTAL AND
HAZARDOUS ASSESSMENT AND REMEDIATION,
INFRASTRUCTURE IMPROVEMENTS AND OTHER
RELATED COSTS FOR AN ECONOMIC
DEVELOPMENT PROJECT
PROJECT ALLOCATION 10,000,000
(IX.7) WEST MIFFLIN BOROUGH
(A) CONSTRUCTION, ACQUISITION,
INFRASTRUCTURE, REDEVELOPMENT AND
RENOVATIONS FOR THE TOM JOHNSON BOYS
ACADEMY
PROJECT ALLOCATION 2,000,000
(IX.8) WEST VIEW BOROUGH
(A) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, REDEVELOPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS AND OTHER RELATED COSTS FOR
A NEW BOROUGH BUILDING
PROJECT ALLOCATION 2,000,000
(x) Wilkinsburg Borough
(A) Construction, renovation and other
related costs for improvements to a
municipal building
Project Allocation 5,000,000
20250HB1331PN2389 - 224 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(B) Acquisition, construction,
renovation, infrastructure and other
costs related to public improvements
and economic development projects in
the Borough of Wilkinsburg
Project Allocation 25,000,000
(xi) Elizabeth Township
(A) Acquisition, renovation,
infrastructure, site preparation,
construction, redevelopment, abatement
and other costs associated with the
Elizabeth Township Municipal Complex,
community center and emergency
services center
Project Allocation 15,000,000
(xii) Hampton Township
(A) Construction, infrastructure,
renovation, rehabilitation and other
related costs for the construction of
public safety facilities within the
township
Project Allocation 5,000,000
(B) Acquisition, construction, renovation
and/or other related costs for the
construction of new and enhancements
to existing recreational and public
safety facilities
Project Allocation 7,000,000
(C) (B) Construction, infrastructure,
acquisition, redevelopment, renovation
20250HB1331PN2389 - 225 -
<--
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
and other related costs for an
economic development project
Project Allocation 2,500,000
(XII.1) MARSHALL TOWNSHIP
(A) CONSTRUCTION, ACQUISITION,
INFRASTRUCTURE, ENVIRONMENTAL
REMEDIATION, RENOVATION AND OTHER
RELATED COSTS FOR THE RELOCATION AND
EXPANSION OF TEAMSTERS 249
HEADQUARTERS
PROJECT ALLOCATION 10,000,000
(xiii) McCandless Township
(A) Construction, infrastructure,
renovation, rehabilitation and other
related costs for renovations to La
Roche University, including a health
and wellness center and cybercrime lab
Project Allocation 2,512,000
(xiv) Pine Township
(A) Construction, infrastructure,
redevelopment and other related costs
for police barracks
Project Allocation 2,500,000
(B) Acquisition, construction,
redevelopment and/or other costs
related to the expansion of a
community center and park
Project Allocation 10,000,000
(C) Acquisition, construction,
infrastructure, redevelopment and/or
20250HB1331PN2389 - 226 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
other costs related to building a new
public safety building
Project Allocation 10,000,000
(xv) Ohio Township
(A) Construction, infrastructure,
acquisition, redevelopment,
renovation, rehabilitation and other
related costs to construct a satellite
EMS facility, a fire and rescue
training facility and acquire and
develop additional properties
Project Allocation 10,850,000
(B) CONSTRUCTION, INFRASTRUCTURE,
ABATEMENT OF HAZARDOUS MATERIALS,
ACQUISITION, REDEVELOPMENT,
RENOVATION, REHABILITATION AND OTHER
RELATED COSTS FOR IMPROVEMENTS WITHIN
THE AVONWORTH SCHOOL DISTRICT
PROJECT ALLOCATION 6,000,000
(xvi) Richland Township
(A) Construction, infrastructure,
acquisition, redevelopment, renovation
and other costs for an economic
development project
Project Allocation 2,500,000
(xvii) West Deer Township
(A) Construction, infrastructure,
acquisition, redevelopment, renovation
and other costs for an economic
development project
20250HB1331PN2389 - 227 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 2,500,000
(3) Armstrong County
(i) Armstrong County Industrial Development
Council
(A) Acquisition, construction,
infrastructure, site improvements,
possible abatement of hazardous
materials, renovation, rehabilitation
and other related costs for an
economic development project located
in the Armstrong Innovation Park in
South Buffalo Township
Project Allocation 15,000,000
(B) Acquisition, construction,
infrastructure, site improvements,
possible abatement of hazardous
materials, renovation, rehabilitation
and other related costs for an
economic development project relating
to the redevelopment of the former
Armstrong County Power Plant in
Washington Township
Project Allocation 15,000,000
(4) Beaver County
(i) County projects
(A) Construction, infrastructure,
abatement of hazardous materials,
acquisition, redevelopment,
renovation, rehabilitation and other
related costs for economic
20250HB1331PN2389 - 228 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
development, commercial, public
improvement, sewage, blight removal,
road, bridge, rail, waterway and
aviation projects in Beaver County
Project Allocation 50,000,000
(B) Acquisition, infrastructure,
construction, redevelopment and other
related costs for riverfront
development along the Ohio River
Project Allocation 25,000,000
(C) Construction, infrastructure,
abatement of hazardous materials,
acquisition, redevelopment,
renovation, rehabilitation and other
related costs for the Neighborhood
North Museum of Play
Project Allocation 5,000,000
(D) Acquisition, construction,
infrastructure, redevelopment and
other related costs for a project
associated with hospitality,
agriculture or culinary
Project Allocation 2,500,000
(E) Acquisition, construction,
infrastructure, abatement of hazardous
materials, redevelopment, renovation
and/or other costs related to an
economic development project
Project Allocation 5,000,000
(ii) Beaver County Airport Authority
20250HB1331PN2389 - 229 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) Acquisition, construction,
infrastructure, redevelopment,
renovation and other related costs for
hangars and facility improvements in
Chippewa Township
Project Allocation 2,500,000
(iii) Redevelopment Authority of Beaver
County
(A) Construction, infrastructure,
redevelopment and other related costs
for the reconstruction of 3rd Street
in Midland Borough
Project Allocation 3,500,000
(B) Construction, infrastructure,
redevelopment and other related costs
for development of the Bet-Tech
Industrial Park in Hopewell Township
Project Allocation 3,500,000
(iv) City of Aliquippa
(A) Renovation, rehabilitation,
redevelopment, acquisition, abatement
of hazardous materials,
infrastructure, construction and
related costs for the development of
an Anchor Building Project
Project Allocation 5,000,000
(B) CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, DESIGN AND OTHER
RELATED COSTS FOR A HISTORIC UNION
HALL IN ALIQUIPPA
20250HB1331PN2389 - 230 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
PROJECT ALLOCATION 1,000,000
(v) City of Beaver Falls
(A) Acquisition, construction,
infrastructure, redevelopment,
renovation and other related costs for
student, academic and/or athletic
facilities at Geneva College
Project Allocation 2,500,000
(B) Construction, infrastructure,
renovation and/or related costs to
modernize and provide ADA
accessibility to Old Main on the
campus of Geneva College
Project Allocation 4,000,000
(C) Acquisition, construction,
infrastructure, redevelopment,
abatement of hazardous materials and
other related costs to renovate,
expand and/or build new facilities for
the Neighborhood North Museum of Play
Project Allocation 2,000,000
(D) Acquisition, construction,
infrastructure, abatement of hazardous
materials, redevelopment, renovation
and/or other costs related to an
economic development project
Project Allocation 2,500,000
(E) Construction, infrastructure,
redevelopment, renovation and related
costs for the transformation of the
20250HB1331PN2389 - 231 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Carnegie Free Library of Beaver Falls
into a restored cultural arts center
Project Allocation 3,000,000
(vi) Ambridge Borough
(A) Construction, infrastructure,
abatement of hazardous materials,
acquisition, redevelopment,
renovation, rehabilitation and other
related costs for the development of
an anchor building project
Project Allocation 5,000,000
(B) Acquisition, abatement,
infrastructure and construction of a
road to connect 19th Street (SR 0989)
to Merchant Street and SR 0065
Project Allocation 10,000,000
(C) ACQUISITION, CONSTRUCTION,
RECONSTRUCTION, REHABILITATION,
ENVIRONMENTAL AND/OR HAZARDOUS
ASSESSMENT AND REMEDIATION, SITE
PREPARATION, INFRASTRUCTURE
IMPROVEMENTS, INCLUDING IMPROVEMENTS
RELATED TO ENERGY, TRANSPORTATION,
PARKING, UTILITIES, STORM WATER
MANAGEMENT AND COMMON AREAS, AND ALL
OTHER RELATED COSTS FOR THE
CONSTRUCTION, RENOVATION,
REHABILITATION, REDEVELOPMENT,
EXPANSION AND/OR REUSE OF AMBRIDGE
BOROUGH COMMUNITY FOOD HUB FACILITY
20250HB1331PN2389 - 232 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
FOR EDUCATIONAL, CULTURAL AND/OR
ADMINISTRATIVE PURPOSES WITHIN BEAVER
COUNTY
PROJECT ALLOCATION 1,000,000
(VI.1) BADEN BOROUGH
(A) ACQUISITION, REHABILITATION,
INFRASTRUCTURE, ABATEMENT,
REDEVELOPMENT, CONSTRUCTION AND
RENOVATION OF AN ANCHOR BUILDING
PROJECT IN THE BOROUGH OF BADEN
PROJECT ALLOCATION 5,000,000
(vii) Big Beaver Borough
(A) Construction, infrastructure,
redevelopment, renovation and other
related costs for economic development
at the Pennsylvania Turnpike
intersections
Project Allocation 7,000,000
(B) Acquisition, site development,
construction, infrastructure,
redevelopment, renovation and other
related costs for improvement and
expansion projects at Pittsburgh
International Race Complex
Project Allocation 3,750,000
(C) Acquisition, construction,
infrastructure, abatement of hazardous
materials, redevelopment, renovation
and/or other costs related to an
economic development project
20250HB1331PN2389 - 233 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 2,500,000
(viii) Bridgewater Borough
(A) Acquisition, construction,
infrastructure, abatement of hazardous
materials, redevelopment, renovation
and/or other costs related to an
economic development project
Project Allocation 2,500,000
(VIII.1) CONWAY BOROUGH
(A) ACQUISITION, REHABILITATION,
INFRASTRUCTURE, ABATEMENT,
DEVELOPMENT, CONSTRUCTION AND
RENOVATION OF AN ANCHOR BUILDING
PROJECT IN THE BOROUGH OF CONWAY
PROJECT ALLOCATION 5,000,000
(ix) Economy Borough
(A) Acquisition, construction,
infrastructure, abatement of hazardous
materials, redevelopment, renovation
and/or other costs related to an
economic development project
Project Allocation 2,500,000
(x) Freedom Borough
(A) Acquisition, rehabilitation,
infrastructure, abatement,
redevelopment, construction and
renovation of an anchor building
project
Project Allocation 5,000,000
(xi) Midland Borough
20250HB1331PN2389 - 234 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) Acquisition, construction,
infrastructure, redevelopment,
renovation and other related costs for
Lincoln Park Performing Arts Charter
School expansion project
Project Allocation 6,000,000
(xii) Monaca Borough
(A) Construction, infrastructure,
abatement of hazardous materials,
acquisition, redevelopment,
renovation, rehabilitation and other
related costs of an anchor building
project
Project Allocation 5,000,000
(B) Construction, infrastructure,
abatement of hazardous materials,
acquisition, redevelopment,
renovation, rehabilitation and other
related costs for development of the
George Washington Plaza
Project Allocation 2,500,000
(xiii) New Brighton Borough
(A) Acquisition, construction,
infrastructure, abatement of hazardous
materials, redevelopment, renovation
and/or other costs related to an
economic development project
Project Allocation 2,500,000
(xiv) Rochester Borough
(A) Acquisition, rehabilitation,
20250HB1331PN2389 - 235 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
infrastructure, abatement,
redevelopment, construction and
renovation of an anchor building
project
Project Allocation 5,000,000
(B) Rehabilitation, infrastructure,
abatement, redevelopment, construction
and renovation of the Rochester
Borough Municipal Building, including
the public theater, museum and police
facility
Project Allocation 5,000,000
(xv) Brighton Township
(A) Acquisition, construction,
redevelopment, renovation and/or
related costs for upgraded healthcare
facilities at Heritage Valley Health
System Beaver Hospital
Project Allocation 2,500,000
(xvi) Center Township
(A) Construction, infrastructure,
abatement of hazardous materials,
acquisition, redevelopment,
renovation, rehabilitation and other
related costs for development of the
retail corridor on Brodhead Road
Project Allocation 15,000,000
(B) Acquisition, construction,
infrastructure, abatement of hazardous
materials, redevelopment, renovation
20250HB1331PN2389 - 236 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
and other related costs for a sports-
related facility
Project Allocation 5,000,000
(C) Acquisition, site development,
infrastructure improvements,
construction and related costs for
youth sports and recreation facilities
at the M:7 Sports Pittsburgh sports
complex
Project Allocation 4,500,000
(D) Construction, infrastructure,
renovation and other related costs for
improvements at Beaver County Transit
Authority's Center Township Terminal
facility
Project Allocation 1,500,000
(xvii) Chippewa Township
(A) Acquisition, construction,
infrastructure, abatement of hazardous
materials, redevelopment, renovation
and/or other costs related to an
economic development project
Project Allocation 2,500,000
(B) Construction, infrastructure,
redevelopment, renovation and other
related costs for hangars, facilities,
classrooms and a control tower at the
Beaver County Community College School
of Aviation
Project Allocation 3,750,000
20250HB1331PN2389 - 237 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(xviii) Darlington Township
(A) Acquisition, construction,
infrastructure, abatement of hazardous
materials, redevelopment, renovation
and/or other costs related to an
economic development project
Project Allocation 2,500,000
(B) Acquisition, construction,
infrastructure, redevelopment,
renovation and other related costs for
improvements to Cannelton Road
Industrial Park
Project Allocation 2,500,000
(xix) Franklin Township
(A) Acquisition, construction,
infrastructure, abatement of hazardous
materials, redevelopment, renovation
and/or other costs related to an
economic development project
Project Allocation 2,500,000
(xx) Harmony Township
(A) Acquisition, construction, equipment,
infrastructure, rehabilitation,
environmental improvements and other
related costs for parks, recreational
space and open space in the township
Project Allocation 3,000,000
(xxi) Hopewell Township
(A) Construction, infrastructure,
abatement of hazardous materials,
20250HB1331PN2389 - 238 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
acquisition, redevelopment,
renovation, rehabilitation and other
related costs for development of the
retail corridor on Brodhead Road
Project Allocation 15,000,000
(B) Infrastructure, abatement of
hazardous materials, acquisition,
redevelopment, renovation,
rehabilitation and other related costs
for the development of new
multipurpose government, community and
emergency responders building or
buildings
Project Allocation 5,000,000
(C) Construction, infrastructure,
abatement of hazardous materials,
acquisition, redevelopment,
renovation, rehabilitation and other
related costs for the development of
the Hopewell Shopping Center
Project Allocation 5,000,000
(D) Renovation, rehabilitation,
redevelopment, acquisition, abatement
of hazardous materials,
infrastructure, construction and other
related costs for development of an
indoor/outdoor sports and recreation
complex
Project Allocation 3,000,000
(5) Bedford County
20250HB1331PN2389 - 239 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(i) Bedford County Development Association
(A) Acquisition, construction, site
development, infrastructure, abatement
of hazardous materials, equipment,
redevelopment and other related costs
for expansion and/or renovation of the
Bedford County Technical Center in
Snake Spring Township
Project Allocation 5,000,000
(ii) Bedford Borough
(A) Construction, acquisition,
infrastructure improvements,
redevelopment, abatement of natural
hazardous materials, renovation and
rehabilitation and other related costs
for improvements at The Green
Project Allocation 1,300,000
(B) Construction, acquisition,
infrastructure improvements,
redevelopment, abatement of natural
hazardous materials, renovation and
rehabilitation and other related costs
for improvements to public safety and
emergency services
Project Allocation 1,000,000
(C) Construction, acquisition,
infrastructure, redevelopment,
abatement of natural hazardous
materials, renovation and
rehabilitation and other related costs
20250HB1331PN2389 - 240 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
for improvements at Fort Bedford Park
Project Allocation 3,600,000
(6) Berks County
(I) COUNTY PROJECTS
(A) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS, INCLUDING MACHINERY AND
EQUIPMENT, FOR A PROJECT FOR KUTZTOWN
SCHOOL DISTRICT
PROJECT ALLOCATION 3,000,000
(B) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS, INCLUDING MACHINERY AND
EQUIPMENT, FOR A PROJECT FOR
MUHLENBERG SCHOOL DISTRICT
PROJECT ALLOCATION 5,000,000
(C) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS, INCLUDING MACHINERY AND
EQUIPMENT FOR A PROJECT FOR READING
MUHLENBERG CAREER AND TECHNOLOGY
CENTER
PROJECT ALLOCATION 3,000,000
(D) ACQUISITION, SITE PREPARATION,
20250HB1331PN2389 - 241 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
REMEDIATION, INFRASTRUCTURE,
CONSTRUCTION AND/OR RENOVATION
ACTIVITIES RELATED TO THE DEVELOPMENT
AND/OR REDEVELOPMENT OF THE SOUTHERN
BERKS INDUSTRIAL PARK
PROJECT ALLOCATION 25,000,000
(E) ACQUISITION, SITE PREPARATION,
REDEVELOPMENT, RENOVATION,
CONSTRUCTION, INFRASTRUCTURE,
ABATEMENT OF HAZARDOUS MATERIALS AND
OTHER RELATED COSTS FOR THE
DEVELOPMENT OF PENN MEDICINE AND THE
UNIVERSITY OF PENNSYLVANIA HEALTH
SYSTEM FACILITIES
PROJECT ALLOCATION 10,000,000
(i) (I.1) City of Reading
(A) Acquisition, construction,
redevelopment, infrastructure,
renovation and rehabilitation of sites
and other related costs for
Opportunity House facilities
Project Allocation 5,000,000
(B) Acquisition, construction and other
related costs for the Rose Corporation
expansion
Project Allocation 6,000,000
(C) PLANNING, DESIGN, CONSTRUCTION,
INFRASTRUCTURE, RENOVATION,
REHABILITATION AND OTHER RELATED COSTS
FOR THE REDEVELOPMENT OF BUILDINGS AND
20250HB1331PN2389 - 242 -
<--
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
FACILITIES AT THE ROSE CORPORATION
PROJECT ALLOCATION 3,000,000
(D) CONSTRUCTION, INFRASTRUCTURE,
ABATEMENT OF HAZARDOUS MATERIALS,
ACQUISITION, REDEVELOPMENT,
RENOVATION, REHABILITATION AND OTHER
RELATED COSTS FOR IMPROVEMENTS AT THE
BERKS HISTORY CENTER
PROJECT ALLOCATION 10,000,000
(E) CONSTRUCTION, INFRASTRUCTURE,
ABATEMENT OF HAZARDOUS MATERIALS,
ACQUISITION, REDEVELOPMENT,
RENOVATION, REHABILITATION AND OTHER
RELATED COSTS FOR IMPROVEMENTS AT THE
READING MUHLENBERG CAREER AND
TECHNOLOGY CENTER
PROJECT ALLOCATION 10,000,000
(F) CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
OF HAZARDOUS MATERIALS, MACHINERY AND
EQUIPMENT AND OTHER RELATED COSTS FOR
A BEHAVIORAL HEALTH HOSPITAL IN THE
CITY OF READING
PROJECT ALLOCATION 3,000,000
(ii) Laureldale Borough
(A) Construction and other related costs
for a new fire station in the Borough
of Laureldale
Project Allocation 1,000,000
(II.1) MUHLENBERG TOWNSHIP
20250HB1331PN2389 - 243 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) CONSTRUCTION, REDEVELOPMENT,
INFRASTRUCTURE AND OTHER RELATED COSTS
FOR RENOVATIONS TO THE READING
MUHLENBERG CAREER AND TECHNOLOGY
CENTER
PROJECT ALLOCATION 2,500,000
(iii) New Morgan Borough
(A) Acquisition, site preparation,
remediation, infrastructure,
construction and/or renovation
activities related to the development
and/or redevelopment of the Southern
Berks Industrial Park
Project Allocation 25,000,000
(iv) Wyomissing Borough
(A) Acquisition, demolition, site
preparation, environmental
remediation, infrastructure,
construction, equipment and other
related costs for an economic
development or community development
project undertaken by or in
conjunction with the Borough of
Wyomissing
Project Allocation 20,000,000
(v) Spring Township
(A) Acquisition, demolition, site
preparation, environmental
remediation, infrastructure,
construction, equipment and other
20250HB1331PN2389 - 244 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
related costs for the Broadcasting
Village mixed-use development project
at the intersection of Route 222 and
Broadcasting Road in Spring Township
Project Allocation 20,000,000
(7) Blair County (Reserved)
(8) Bradford County (Reserved)
(I) COUNTY PROJECTS
(A) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS, INCLUDING MACHINERY AND
EQUIPMENT, FOR AN ECONOMIC DEVELOPMENT
PROJECT IN BRADFORD COUNTY
PROJECT ALLOCATION 30,000,000
(B) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS, INCLUDING MACHINERY AND
EQUIPMENT, FOR A COMMUNITY ASSET
PROJECT IN BRADFORD COUNTY
PROJECT ALLOCATION 15,000,000
(9) Bucks County
(i) County projects
(A) Land acquisition, construction,
demolition, site preparation,
infrastructure improvements and other
related costs for Trinity Health
20250HB1331PN2389 - 245 -
<--
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 7,000,000
(B) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS, INCLUDING MACHINERY AND
EQUIPMENT, FOR A BIOTECH FACILITY IN
PIPERSVILLE
PROJECT ALLOCATION 10,000,000
(C) CONSTRUCTION, DEMOLITION,
INFRASTRUCTURE, REDEVELOPMENT,
ABATEMENT, REMEDIATION AND OTHER
RELATED COSTS FOR THE OPTIMIZATION OF
VARIOUS BUCKS COUNTY COMMUNITY COLLEGE
FACILITIES
PROJECT ALLOCATION 5,000,000
(D) CONSTRUCTION, INFRASTRUCTURE,
RENOVATIONS AND OTHER COSTS FOR THE
MERCER MUSEUM AND FONTHILL CASTLE
COMPLEX
PROJECT ALLOCATION 10,000,000
(ii) Bucks County Redevelopment Authority
(A) Construction, renovation,
rehabilitation and other related costs
for the Third District Volunteer Fire
Company State Renovation Project
Project Allocation 750,000
(II.1) DOYLESTOWN HOSPITAL AUTHORITY
(A) CONSTRUCTION, INFRASTRUCTURE,
ACQUISITION, REDEVELOPMENT,
20250HB1331PN2389 - 246 -
<--
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
RENOVATION, REHABILITATION AND OTHER
RELATED COSTS FOR DOYLESTOWN HOSPITAL
PROJECT ALLOCATION 20,000,000
(iii) Bensalem Township
(A) Acquisition, site preparation,
construction, rehabilitation and
renovation activities related to the
development of a capital improvement
or economic development project
constructed by Bensalem Township
Project Allocation 25,000,000
(iv) Bristol Township
(A) Redevelopment, construction and other
related costs to expand the Family
Service Association of Bucks County's
homeless shelter
Project Allocation 7,500,000
(V) BUCKINGHAM TOWNSHIP
(A) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE AND OTHER RELATED COSTS
FOR AN ECONOMIC DEVELOPMENT PROJECT IN
BUCKINGHAM TOWNSHIP
PROJECT ALLOCATION 3,000,000
(B) ACQUISITION, RENOVATIONS,
CONSTRUCTION, INFRASTRUCTURE
IMPROVEMENTS AND OTHER RELATED COSTS
FOR THE HISTORIC GENERAL GREENE INN
PROJECT ALLOCATION 10,000,000
(VI) NEW BRITAIN TOWNSHIP
(A) ACQUISITION, DEMOLITION, SITE
20250HB1331PN2389 - 247 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
PREPARATION, RENOVATION, CONSTRUCTION,
REMEDIATION, INFRASTRUCTURE AND/OR
OTHER ASSOCIATED COSTS TO SUPPORT AN
EXPANSION OF A CONSTRUCTION WASTE AND
DEMOLITION RECYCLING FACILITY
PROJECT ALLOCATION 6,000,000
(VII) SOLEBURY TOWNSHIP
(A) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE AND OTHER RELATED COSTS
FOR AN ECONOMIC DEVELOPMENT PROJECT IN
SOLEBURY TOWNSHIP
PROJECT ALLOCATION 2,000,000
(B) ACQUISITION, SITE DEVELOPMENT,
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, EQUIPMENT, ABATEMENT OF
HAZARDOUS MATERIALS AND OTHER RELATED
COSTS FOR OPEN SPACE, TRAIL, TOURISM
AND OUTDOOR RECREATION PROJECTS IN THE
TOWNSHIP
PROJECT ALLOCATION 10,000,000
(v) (VIII) West Rockhill Township
(A) Acquisition, infrastructure and other
costs related to the replacement of a
PET scanner at Grand View Health
located at the Sellersville Outpatient
Center
Project Allocation 1,000,000
(10) Butler County
(I) REDEVELOPMENT AUTHORITY OF THE COUNTY OF
BUTLER
20250HB1331PN2389 - 248 -
<--
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) CONSTRUCTION, ACQUISITION,
INFRASTRUCTURE, REDEVELOPMENT,
ABATEMENT OF HAZARDOUS MATERIALS AND
OTHER RELATED COSTS FOR EXPANSION AND
IMPROVEMENT OF FACILITIES TO SUPPORT
GROWTH IN PRODUCTION VOLUMES AND JOBS
FOR IRON MOUNTAIN
PROJECT ALLOCATION 12,500,000
(i) (II) East Butler Borough
(A) Acquisition, construction and/or
other costs related to acquisition of
facilities, infrastructure
improvements, including roof
replacement, creation of a ballistics
testing laboratory and various
facility upgrades designed to enhance
energy efficiency, reduce carbon
emissions and lessen dependence on the
electrical grid, and expansion and
enhancement of the parking lot
Project Allocation 2,000,000
(11) Cambria County
(i) County projects
(A) Acquisition, abatement of hazardous
materials, infrastructure,
construction, redevelopment, site
development and other related costs of
a project for the National Electrical
Contractors Association and its
membership
20250HB1331PN2389 - 249 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 7,000,000
(II) CITY OF JOHNSTOWN
(A) ACQUISITION, CONSTRUCTION,
RECONSTRUCTION, REHABILITATION,
ENVIRONMENTAL AND/OR HAZARDOUS
ASSESSMENT AND REMEDIATION, SITE
PREPARATION, INFRASTRUCTURE
IMPROVEMENTS, INCLUDING IMPROVEMENTS
RELATED TO ENERGY, TRANSPORTATION,
PARKING, UTILITIES, STORM WATER
MANAGEMENT AND COMMON AREAS, AND ALL
OTHER RELATED COSTS FOR THE
CONSTRUCTION, RENOVATION,
REHABILITATION, REDEVELOPMENT,
EXPANSION AND/OR REUSE OF CAMBRIA
COUNTY WAR MEMORIAL FACILITY PROJECT
FOR EDUCATIONAL, CULTURAL AND/OR
ADMINISTRATIVE PURPOSES WITHIN CAMBRIA
COUNTY
PROJECT ALLOCATION 1,000,000
(B) ACQUISITION, CONSTRUCTION,
RECONSTRUCTION, REHABILITATION,
ENVIRONMENTAL AND/OR HAZARDOUS
ASSESSMENT AND REMEDIATION, SITE
PREPARATION, INFRASTRUCTURE
IMPROVEMENTS, INCLUDING IMPROVEMENTS
RELATED TO ENERGY, TRANSPORTATION,
PARKING, UTILITIES, STORM WATER
MANAGEMENT AND COMMON AREAS, AND ALL
OTHER RELATED COSTS FOR THE
20250HB1331PN2389 - 250 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
CONSTRUCTION, RENOVATION,
REHABILITATION, REDEVELOPMENT,
EXPANSION AND/OR REUSE OF WOMEN'S HELP
CENTER COMMUNITY HELP CENTER FACILITY
FOR EDUCATIONAL, CULTURAL AND/OR
ADMINISTRATIVE PURPOSES WITHIN CAMBRIA
COUNTY
PROJECT ALLOCATION 1,000,000
(III) LORETTO BOROUGH
(A) ACQUISITION, CONSTRUCTION,
RECONSTRUCTION, REHABILITATION,
ENVIRONMENTAL AND/OR HAZARDOUS
ASSESSMENT AND REMEDIATION, SITE
PREPARATION, INFRASTRUCTURE
IMPROVEMENTS, INCLUDING IMPROVEMENTS
RELATED TO ENERGY, TRANSPORTATION,
PARKING, UTILITIES, STORM WATER
MANAGEMENT AND COMMON AREAS, AND ALL
OTHER COSTS FOR THE CONSTRUCTION,
RENOVATION, REHABILITATION,
REDEVELOPMENT, EXPANSION AND/OR REUSE
OF SAINT FRANCIS UNIVERSITY FACILITIES
FOR EDUCATIONAL, CULTURAL AND/OR
ADMINISTRATIVE PURPOSES
PROJECT ALLOCATION 3,000,000
(IV) CRESSON TOWNSHIP
(A) ACQUISITION, CONSTRUCTION,
DEMOLITION, RENOVATION,
REHABILITATION, INFRASTRUCTURE AND
OTHER RELATED COSTS FOR THE MOUNT
20250HB1331PN2389 - 251 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
ALOYSIUS COLLEGE CAMPUS
PROJECT ALLOCATION 10,000,000
(V) JACKSON TOWNSHIP
(A) CONSTRUCTION, RENOVATION,
INFRASTRUCTURE, REDEVELOPMENT AND
OTHER ASSOCIATED COSTS FOR THE IBEW
LOCAL 126 CALVIN R PETERSON TRAINING
SCHOOL PROJECT
PROJECT ALLOCATION 8,000,000
(VI) RICHLAND TOWNSHIP
(A) ACQUISITION, CONSTRUCTION,
RECONSTRUCTION, REHABILITATION,
ENVIRONMENTAL AND/OR HAZARDOUS
ASSESSMENT AND REMEDIATION, SITE
PREPARATION, INFRASTRUCTURE
IMPROVEMENTS, INCLUDING IMPROVEMENTS
RELATED TO ENERGY, TRANSPORTATION,
PARKING, UTILITIES, STORM WATER
MANAGEMENT AND COMMON AREAS, AND ALL
OTHER RELATED COSTS FOR THE
CONSTRUCTION, RENOVATION,
REHABILITATION, REDEVELOPMENT,
EXPANSION AND/OR REUSE OF SAINT
FRANCIS UNIVERSITY FACILITIES FOR
EDUCATIONAL, CULTURAL AND/OR
ADMINISTRATIVE PURPOSES
PROJECT ALLOCATION 2,000,000
(B) ACQUISITION, CONSTRUCTION,
RECONSTRUCTION, REHABILITATION,
ENVIRONMENTAL AND/OR HAZARDOUS
20250HB1331PN2389 - 252 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
ASSESSMENT AND REMEDIATION, SITE
PREPARATION, INFRASTRUCTURE
IMPROVEMENTS, INCLUDING IMPROVEMENTS
RELATED TO ENERGY, TRANSPORTATION,
PARKING, UTILITIES, STORM WATER
MANAGEMENT AND COMMON AREAS, AND ALL
OTHER RELATED COSTS FOR THE
CONSTRUCTION, RENOVATION,
REHABILITATION, REDEVELOPMENT,
EXPANSION AND/OR REUSE OF JOHNSTOWN-
CAMBRIA COUNTY AIRPORT AUTHORITY FOR
EDUCATIONAL, CULTURAL AND/OR
ADMINISTRATIVE PURPOSES
PROJECT ALLOCATION 1,275,000
(C) ACQUISITION, CONSTRUCTION,
RECONSTRUCTION, REHABILITATION,
ENVIRONMENTAL AND/OR HAZARDOUS
ASSESSMENT AND REMEDIATION, SITE
PREPARATION, INFRASTRUCTURE
IMPROVEMENTS, INCLUDING IMPROVEMENTS
RELATED TO ENERGY, TRANSPORTATION,
PARKING, UTILITIES, STORM WATER
MANAGEMENT AND COMMON AREAS, AND ALL
OTHER RELATED COSTS FOR THE
CONSTRUCTION, RENOVATION,
REHABILITATION, REDEVELOPMENT,
EXPANSION AND/OR REUSE OF AERIUM-
MARTIN-BAKER BUILDING PROJECT FOR
EDUCATIONAL, CULTURAL AND/OR
ADMINISTRATIVE PURPOSES
20250HB1331PN2389 - 253 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
PROJECT ALLOCATION 500,000
(D) ACQUISITION, CONSTRUCTION,
RECONSTRUCTION, REHABILITATION,
ENVIRONMENTAL AND/OR HAZARDOUS
ASSESSMENT AND REMEDIATION, SITE
PREPARATION, INFRASTRUCTURE
IMPROVEMENTS, INCLUDING IMPROVEMENTS
RELATED TO ENERGY, TRANSPORTATION,
PARKING, UTILITIES, STORM WATER
MANAGEMENT AND COMMON AREAS, AND ALL
OTHER RELATED COSTS FOR THE
CONSTRUCTION, RENOVATION,
REHABILITATION, REDEVELOPMENT,
EXPANSION AND/OR REUSE OF AERIUM-
REGIONAL JET AND INNOVATION CENTER FOR
EDUCATIONAL, CULTURAL AND/OR
ADMINISTRATIVE PURPOSES
PROJECT ALLOCATION 1,500,000
(E) ACQUISITION, CONSTRUCTION,
RECONSTRUCTION, REHABILITATION,
ENVIRONMENTAL AND/OR HAZARDOUS
ASSESSMENT AND REMEDIATION, SITE
PREPARATION, INFRASTRUCTURE
IMPROVEMENTS, INCLUDING IMPROVEMENTS
RELATED TO ENERGY, TRANSPORTATION,
PARKING, UTILITIES, STORM WATER
MANAGEMENT AND COMMON AREAS, AND ALL
OTHER RELATED COSTS FOR THE
CONSTRUCTION, RENOVATION,
REHABILITATION, REDEVELOPMENT,
20250HB1331PN2389 - 254 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
EXPANSION AND/OR REUSE OF RICHLAND
SCHOOL DISTRICT ELEMENTARY FACILITY
PROJECT FOR EDUCATIONAL, CULTURAL
AND/OR ADMINISTRATIVE PURPOSES
PROJECT ALLOCATION 10,000,000
(VII) STONYCREEK TOWNSHIP
(A) ACQUISITION, RENOVATION,
REDEVELOPMENT, CONSTRUCTION,
INFRASTRUCTURE, SITE WORK AND ALL
OTHER RELATED COSTS FOR THE
DEVELOPMENT OF A MUNICIPAL COMPLEX
PROJECT ALLOCATION 2,500,000
(ii) (VIII) Susquehanna Township
(A) Construction, infrastructure,
redevelopment and other related costs
for the design and construction of a
new fire station/public safety
building for the Hope Fire Company in
Northern Cambria Borough
Project Allocation 1,500,000
(12) Cameron County
(i) County projects
(A) Acquisition, infrastructure,
construction and other related costs
for a health care facility that would
provide maternal care, including
childbirth services
Project Allocation 10,000,000
(13) Carbon County
(I) COUNTY PROJECTS
20250HB1331PN2389 - 255 -
<--
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS, INCLUDING MACHINERY AND
EQUIPMENT, FOR A PROJECT FOR PANTHER
VALLEY SCHOOL DISTRICT
PROJECT ALLOCATION 2,000,000
(i) (II) Parryville Borough
(A) Construction and other related costs
for the consolidation of a municipal
hall, fire department and emergency
shelter into one centralized location
Project Allocation 1,250,000
(14) Centre County
(i) Bellefonte Borough
(A) Construction, infrastructure,
redevelopment and/or other costs
associated with the Bellefonte
Waterfront Project
Project Allocation 2,000,000
(ii) State College Borough
(A) Construction, infrastructure, site
preparation, improvements,
renovations, upgrades, environmental
remediation, repairs and other related
costs for the redevelopment of a
condominium
Project Allocation 20,000,000
(iii) College Township
20250HB1331PN2389 - 256 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) Construction, redevelopment and other
related costs for renovation of two
historic buildings at the ClearWater
Conservancy
Project Allocation 3,000,000
(15) Chester County
(i) County projects
(A) Construction, infrastructure, site
preparation, renovation, environmental
remediation, repair and other related
costs for Kennett Consolidated School
District projects
Project Allocation 20,000,000
(B) Construction, infrastructure, site
preparation, renovation, environmental
remediation, repair and other related
costs to upgrade and renovate a
farmhouse and neighboring facilities
Project Allocation 10,000,000
(C) Construction, infrastructure, site
preparation, site improvements,
renovation, environmental remediation,
repair and other related costs with
upgrades for Farmhouse Enterprises,
LLC, and the surrounding space,
facilities and land
Project Allocation 10,000,000
(D) Acquisition, construction,
demolition, renovations, site
improvements, infrastructure and other
20250HB1331PN2389 - 257 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
related costs for the redevelopment
and improvement of the Paoli train
station
Project Allocation 10,000,000
(E) Acquisition, demolition, site
preparation, renovation, construction,
remediation, infrastructure and/or
other associated costs to support
development within Anson B. Nixon Park
Project Allocation 5,000,000
(F) Acquisition, site preparation,
renovation, construction, remediation,
infrastructure and other associated
costs related to an economic or
community development project advanced
by Square Roots Collective
Project Allocation 5,000,000
(G) ACQUISITION, SITE PREPARATION,
RENOVATION, CONSTRUCTION,
INFRASTRUCTURE AND OTHER ASSOCIATED
COSTS FOR THE IMPROVEMENT, EXPANSION,
REDEVELOPMENT AND REVITALIZATION OF A
NEMOURS CHILDREN'S HEALTH SYSTEM
PEDIATRIC FACILITY LOCATED IN CHESTER
COUNTY
PROJECT ALLOCATION 20,000,000
(H) SITE PREPARATION, CONSTRUCTION,
REDEVELOPMENT, RENOVATION,
REHABILITATION, INFRASTRUCTURE AND
OTHER RELATED COSTS FOR CAPITAL
20250HB1331PN2389 - 258 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
IMPROVEMENTS TO THE YMCA OF GREATER
BRANDYWINE FACILITIES
PROJECT ALLOCATION 5,000,000
(I) ACQUISITION, SITE PREPARATION,
REDEVELOPMENT, RENOVATION,
CONSTRUCTION, INFRASTRUCTURE,
ABATEMENT OF HAZARDOUS MATERIALS AND
OTHER RELATED COSTS FOR THE
DEVELOPMENT OF PENN MEDICINE AND THE
UNIVERSITY OF PENNSYLVANIA HEALTH
SYSTEM FACILITIES
PROJECT ALLOCATION 10,000,000
(II) CHESTER COUNTY INDUSTRIAL DEVELOPMENT
AUTHORITY
(A) LAND ACQUISITION, INFRASTRUCTURE
IMPROVEMENTS, DEMOLITION, SITE
IMPROVEMENT, RENOVATION, ADDITION,
UTILITY EXPANSION, CONSTRUCTION,
PURCHASE OF MEDICAL EQUIPMENT AND
FIXTURES AND OTHER RELATED COSTS FOR
FACILITIES OF MAIN LINE HOSPITALS,
INC.
PROJECT ALLOCATION 50,000,000
(III) CITY OF COATESVILLE
(A) ACQUISITION, INFRASTRUCTURE, SITE
PREPARATION, ENVIRONMENTAL
REMEDIATION, CONSTRUCTION, EQUIPMENT
AND RELATED COSTS FOR AN ECONOMIC
DEVELOPMENT, PUBLIC WORKS OR CAPITAL
PROJECT UNDERTAKEN BY THE CITY OF
20250HB1331PN2389 - 259 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
COATESVILLE
PROJECT ALLOCATION 10,000,000
(ii) (IV) Downingtown Borough
(A) Construction ACQUISITION,
CONSTRUCTION, infrastructure, site
preparation, renovation, environmental
remediation, repair and other related
costs to upgrade, relocate and
renovate the borough hall, police
station and other municipal buildings
Project Allocation 10,000,000
(B) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, REDEVELOPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS AND OTHER RELATED COSTS FOR
STREETSCAPE AND REVITALIZATION OF
PROPERTY IN DOWNINGTOWN BOROUGH FOR
MIXED USE AND ECONOMIC DEVELOPMENT,
INCLUDING RETAIL, COMMERCIAL AND
RESIDENTIAL USES
PROJECT ALLOCATION 20,000,000
(C) CONSTRUCTION, INFRASTRUCTURE,
ACQUISITION AND OTHER RELATED COSTS
FOR THE DEVELOPMENT OF A MUNICIPAL
PARKING GARAGE
PROJECT ALLOCATION 10,000,000
(iii) (V) Kennett Square Borough
(A) Acquisition, site preparation,
renovation, construction, remediation,
infrastructure and/or other associated
20250HB1331PN2389 - 260 -
<--
<--
<--
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
costs related to an economic and/or
community development project in
Kennett Square
Project Allocation 10,000,000
(VI) OXFORD BOROUGH
(A) ACQUISITION, INFRASTRUCTURE, SITE
PREPARATION, ENVIRONMENTAL
REMEDIATION, CONSTRUCTION, EQUIPMENT
AND RELATED COSTS FOR AN ECONOMIC
DEVELOPMENT, INFRASTRUCTURE OR OTHER
CAPITAL PROJECT UNDERTAKEN IN THE
BOROUGH OF OXFORD
PROJECT ALLOCATION 20,000,000
(VII) PARKESBURG BOROUGH
(A) ACQUISITION, INFRASTRUCTURE, SITE
PREPARATION, ENVIRONMENTAL
REMEDIATION, CONSTRUCTION, EQUIPMENT
AND RELATED COSTS FOR AN ECONOMIC
DEVELOPMENT, PUBLIC WORKS OR CAPITAL
PROJECT UNDERTAKEN BY THE BOROUGH OF
PARKESBURG
PROJECT ALLOCATION 10,000,000
(iv) (VIII) Phoenixville Borough
(A) Acquisition, infrastructure,
development, site preparation,
construction, rehabilitation
renovation and other related expenses
to support an economic development
project
Project Allocation 40,000,000
20250HB1331PN2389 - 261 -
<--
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(IX) CALN TOWNSHIP
(A) CONSTRUCTION, INFRASTRUCTURE,
ABATEMENT OF HAZARDOUS MATERIALS,
REDEVELOPMENT, RENOVATION AND OTHER
RELATED COSTS FOR SPACKMAN-DAVIS
FARMHOUSE PROPERTY
PROJECT ALLOCATION 5,000,000
(B) CONSTRUCTION, INFRASTRUCTURE,
ACQUISITION, ABATEMENT OF HAZARDOUS
MATERIALS, REDEVELOPMENT, RENOVATION
AND OTHER RELATED COSTS FOR THE CALN
TOWNSHIP PUBLIC WORKS BUILDING AND
GARAGE
PROJECT ALLOCATION 8,500,000
(C) CONSTRUCTION, INFRASTRUCTURE,
ACQUISITION, ABATEMENT OF HAZARDOUS
MATERIALS, REDEVELOPMENT, RENOVATION
AND OTHER RELATED COSTS FOR THE
SPACKMAN-DAVIS AND KINGS HIGHWAY PARK
AND RECREATIONAL CENTER
PROJECT ALLOCATION 5,000,000
(D) CONSTRUCTION, INFRASTRUCTURE,
ACQUISITION, ABATEMENT OF HAZARDOUS
MATERIALS, RENOVATION AND OTHER
RELATED COSTS FOR THE THORNDALE FIRE
STATION EXPANSION PROJECT
PROJECT ALLOCATION 5,000,000
(E) CONSTRUCTION, INFRASTRUCTURE,
ACQUISITION, ABATEMENT OF HAZARDOUS
MATERIALS, REDEVELOPMENT, RENOVATION
20250HB1331PN2389 - 262 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
AND OTHER RELATED COSTS FOR THE BEAVER
CREEK TRAIL
PROJECT ALLOCATION 8,000,000
(F) CONSTRUCTION, INFRASTRUCTURE,
ACQUISITION, ABATEMENT OF HAZARDOUS
MATERIALS, REDEVELOPMENT, RENOVATION
AND OTHER RELATED COSTS FOR THE CALN
TOWNSHIP MUNICIPAL COMPLEX
PROJECT ALLOCATION 10,000,000
(G) CONSTRUCTION, INFRASTRUCTURE,
ABATEMENT OF HAZARDOUS MATERIALS,
RENOVATION AND OTHER RELATED COSTS FOR
THE OLD CALN MEETINGHOUSE BUILDING AND
GROUNDS
PROJECT ALLOCATION 5,000,000
(H) CONSTRUCTION, INFRASTRUCTURE,
ACQUISITION, ABATEMENT OF HAZARDOUS
MATERIALS, REDEVELOPMENT, RENOVATION
AND OTHER RELATED COSTS FOR THE CALN
TOWNSHIP COMMUNITY CENTER PROJECT
PROJECT ALLOCATION 5,000,000
(I) CONSTRUCTION, INFRASTRUCTURE, LAND
ACQUISITION, ABATEMENT OF HAZARDOUS
MATERIALS, DEVELOPMENT AND OTHER
RELATED COSTS FOR THE BARLEY SHEAF
PARK AND PLAYGROUND PROJECT
PROJECT ALLOCATION 7,000,000
(J) CONSTRUCTION, INFRASTRUCTURE,
ABATEMENT OF HAZARDOUS MATERIALS,
REDEVELOPMENT, RENOVATION AND OTHER
20250HB1331PN2389 - 263 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
RELATED COSTS FOR THE INGLESIDE GOLF
CLUBHOUSE
PROJECT ALLOCATION 10,000,000
(K) CONSTRUCTION, INFRASTRUCTURE,
ACQUISITION, ABATEMENT OF HAZARDOUS
MATERIALS, REDEVELOPMENT, RENOVATION
AND OTHER RELATED COSTS FOR TOWNSHIP
PARK IMPROVEMENT PROJECT
PROJECT ALLOCATION 12,000,000
(v) (X) Easttown Township
(A) Acquisition, construction,
demolition, renovations, site
improvements, infrastructure and other
related costs for an economic
development project
Project Allocation 15,000,000
(vi) (XI) East Marlborough Township
(A) Acquisition, site preparation,
renovation, construction, remediation,
infrastructure and other costs
associated costs to improve or expand
Longwood Gardens facilities in Chester
County
Project Allocation 10,000,000
(XI.1) EAST VINCENT TOWNSHIP
(A) ACQUISITION, CONSTRUCTION,
REDEVELOPMENT, INFRASTRUCTURE,
REHABILITATION, RENOVATION AND OTHER
RELATED COSTS FOR AN ECONOMIC
DEVELOPMENT PROJECT IN EAST VINCENT
20250HB1331PN2389 - 264 -
<--
<--
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
TOWNSHIP
PROJECT ALLOCATION 10,000,000
(vii) (XII) Kennett Township
(A) Construction, infrastructure, site
preparation, renovation, environmental
remediation, repair and other related
costs to reconstruct Greenwood
Elementary School
Project Allocation 14,000,000
(XIII) LONDONDERRY TOWNSHIP
(A) ACQUISITION, INFRASTRUCTURE, SITE
PREPARATION, ENVIRONMENTAL
REMEDIATION, CONSTRUCTION, EQUIPMENT
AND RELATED COSTS FOR AN ECONOMIC
DEVELOPMENT, INFRASTRUCTURE OR OTHER
CAPITAL PROJECT UNDERTAKEN IN
LONDONDERRY TOWNSHIP
PROJECT ALLOCATION 20,000,000
(viii) (XIV) New Garden Township
(A) Construction, infrastructure, site
preparation, renovation, environmental
remediation, repair and other related
costs to reconstruct New Garden
Elementary School
Project Allocation 14,000,000
(XV) NEW LONDON TOWNSHIP
(A) ACQUISITION, INFRASTRUCTURE, SITE
PREPARATION, ENVIRONMENTAL
REMEDIATION, CONSTRUCTION, EQUIPMENT
AND RELATED COSTS FOR AN ECONOMIC
20250HB1331PN2389 - 265 -
<--
<--
<--
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
DEVELOPMENT, INFRASTRUCTURE OR OTHER
CAPITAL PROJECT UNDERTAKEN IN NEW
LONDON TOWNSHIP
PROJECT ALLOCATION 20,000,000
(XV.1) NORTH COVENTRY TOWNSHIP
(A) CONSTRUCTION AND OTHER RELATED COSTS
FOR A NEW TOWNSHIP ADMINISTRATION AND
POLICE DEPARTMENT BUILDING
PROJECT ALLOCATION 4,500,000
(ix) (XVI) Richland Township
(A) Infrastructure updates and
improvements, environmental
remediation, construction and other
related costs for the Lehigh Valley
Hospital - Cedar Crest and expansion
of Lehigh Valley Health Network
Project Allocation 10,000,000
(x) (XVII) Schuylkill Township
(A) Acquisition, construction,
demolition, renovations, site
improvements, infrastructure and other
related costs for an economic
development project
Project Allocation 15,000,000
(xi) (XVIII) Tredyffrin Township
(A) Acquisition, construction,
demolition, renovations, site
improvements, infrastructure and other
related costs for an economic
development project
20250HB1331PN2389 - 266 -
<--
<--
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 15,000,000
(XIX) UPPER UWCHLAN TOWNSHIP
(A) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, SITE PREPARATION,
RENOVATION, REPAIR AND OTHER RELATED
COSTS TO UPGRADE, RELOCATE AND
RENOVATE THE TOWNSHIP ADMINISTRATIVE
OFFICES
PROJECT ALLOCATION 3,000,000
(XX) UWCHLAN TOWNSHIP
(A) CONSTRUCTION, INFRASTRUCTURE, SITE
PREPARATION, RENOVATION, REPAIR AND
OTHER RELATED COSTS TO UPGRADE AND
RENOVATE THE TOWNSHIP ADMINISTRATIVE
OFFICES, POLICE STATION, PUBLIC WORKS
FACILITIES AND OTHER MUNICIPAL
BUILDINGS
PROJECT ALLOCATION 13,000,000
(B) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, SITE PREPARATION,
RENOVATION, REPAIR AND OTHER COSTS
RELATED TO THE DEVELOPMENT OF
COMMUNITY AND RECREATION CENTER
PROJECTS IN UWCHLAN TOWNSHIP
PROJECT ALLOCATION 10,000,000
(C) CONSTRUCTION, ACQUISITION,
RENOVATION, REHABILITATION AND OTHER
RELATED COSTS FOR THE REDEVELOPMENT OF
COMMERCIAL PROPERTIES INTO WORKFORCE
HOUSING
20250HB1331PN2389 - 267 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
PROJECT ALLOCATION 5,000,000
(D) CONSTRUCTION, RENOVATION AND RELATED
COSTS FOR IMPROVEMENTS TO THE UWCHLAN
AMBULANCE STATION
PROJECT ALLOCATION 2,000,000
(xii) (XXI) Willistown Township
(A) Acquisition, construction,
demolition, renovations, site
improvements, infrastructure and other
related costs for an economic
development project
Project Allocation 15,000,000
(16) Clarion County (Reserved)
(17) Clearfield County
(i) County projects
(A) Acquisition, construction,
infrastructure, redevelopment,
abatement of hazardous materials,
renovation and/or other costs for
redevelopment projects
Project Allocation 10,000,000
(B) Acquisition, abatement of hazardous
materials, infrastructure,
construction, redevelopment, site
development and other related costs of
a project for the National Electrical
Contractors Association and its
membership
Project Allocation 7,000,000
(C) CONSTRUCTION, RENOVATION,
20250HB1331PN2389 - 268 -
<--
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
INFRASTRUCTURE AND OTHER RELATED
ECONOMIC DEVELOPMENT NEEDS FOR A
CURRENT OR FORMER HIGHER EDUCATION
CAMPUS
PROJECT ALLOCATION 10,000,000
(ii) Clearfield County Economic Development
Corporation
(A) Construction, infrastructure,
abatement of hazardous materials,
redevelopment, renovation and/or other
costs related to the removal of two
dams, creation of two whitewater parks
and construction of a whitewater
village
Project Allocation 8,000,000
(iii) North Central Pennsylvania Regional
Planning and Development Commission
(A) Construction, infrastructure,
redevelopment, renovation and/or other
costs related to the construction of a
multistory building with apartments
for older residents with parking,
garages and storage units in the City
of DuBois
Project Allocation 5,150,000
(iv) City of DuBois
(A) Construction, infrastructure and/or
other costs related to renovation of
the Salvation Army's DuBois location
Project Allocation 600,000
20250HB1331PN2389 - 269 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(v) Morris Township
(A) Acquisition, design, demolition,
construction, infrastructure,
redevelopment, renovation, abatement
of hazardous materials and other
related costs, including machinery and
equipment, for a project at West
Branch School District
Project Allocation 7,000,000
(vi) Sandy Township
(A) Site preparation, acquisition,
renovation, construction, remediation,
infrastructure and/or other costs
associated with facilities at DuBois -
Treasure Lake KOA
Project Allocation 5,000,000
(B) Site preparation, acquisition,
renovation, construction, remediation,
infrastructure and/or other costs
associated with an economic and/or
facilities development project at
Treasure Lake
Project Allocation 5,000,000
(18) Clinton County
(i) Mill Hall Borough
(A) Acquisition, site preparation,
infrastructure, remediation,
renovation, construction and/or other
related costs associated with the
development and/or expansion of a
20250HB1331PN2389 - 270 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
wheat and rye processing facility
Project Allocation 4,000,000
(19) Columbia County
(i) County projects
(A) Site preparation, acquisition,
renovation, construction,
redevelopment, infrastructure and/or
other associated costs for
improvements to and/or expansions of
Bloomsburg Area YMCA's facility
Project Allocation 8,000,000
(B) ACQUISITION, REDEVELOPMENT,
RENOVATION, CONSTRUCTION AND OTHER
RELATED DEVELOPMENT NEEDS FOR THE
ADVANCEMENT AND EXPANSION OF LOCAL
MANUFACTURING NEEDS FOCUSED ON
PLASTICS AND SIMILAR PRODUCT
FABRICATION
PROJECT ALLOCATION 10,000,000
(20) Crawford County
(i) Titusville Redevelopment Authority
(A) Acquisition, demolition,
construction, infrastructure and other
related costs for the University of
Pittsburgh at Titusville, including
renovation and rehabilitation of
existing facilities and construction
of new facilities
Project Allocation 10,000,000
(II) ECONOMIC PROGRESS ALLIANCE OF CRAWFORD
20250HB1331PN2389 - 271 -
<--
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
COUNTY
(A) ACQUISITION, CONSTRUCTION,
DEMOLITION, RENOVATION,
REHABILITATION, ABATEMENT OF HAZARDOUS
MATERIALS, INFRASTRUCTURE AND OTHER
RELATED COSTS FOR THE ALLEGHENY
COLLEGE CAMPUS AND BRANCH CAMPUSES
PROJECT ALLOCATION 15,000,000
(21) Cumberland County
(i) County projects
(A) Site preparation, acquisition,
renovation, construction,
redevelopment, infrastructure and
other associated costs for the
development of the Carlisle Sports
Emporium
Project Allocation 5,000,000
(B) Acquisition, site preparation,
remediation, infrastructure,
construction and renovation activities
related to the development or
redevelopment of a large-scale
industrial site or facility in
Cumberland County
Project Allocation 10,000,000
(C) Acquisition, construction and
infrastructure development for a
neighborhood redevelopment project
Project Allocation 1,000,000
(D) Acquisition, site development,
20250HB1331PN2389 - 272 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
construction, renovation,
infrastructure, equipment and other
related costs for facilities, fixed or
mobile, in which to conduct Cumberland
County government business
Project Allocation 15,000,000
(E) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS, INCLUDING MACHINERY AND
EQUIPMENT, FOR A FIRE STATION LOCATED
IN MECHANICSBURG BOROUGH, CUMBERLAND
COUNTY
PROJECT ALLOCATION 10,000,000
(F) ACQUISITION, DESIGN, CONSTRUCTION,
INFRASTRUCTURE, REDEVELOPMENT,
RENOVATION AND OTHER RELATED COSTS FOR
A SCHOOL SAFETY INSTITUTE
PROJECT ALLOCATION 10,000,000
(G) SITE PREPARATION, ACQUISITION,
RENOVATION, CONSTRUCTION,
REDEVELOPMENT, INFRASTRUCTURE AND
OTHER ASSOCIATED COSTS FOR THE
DEVELOPMENT OF THE CARLISLE SPORTS
EMPORIUM
PROJECT ALLOCATION 5,000,000
(H) ACQUISITION, SITE DEVELOPMENT,
DEMOLITION, CONSTRUCTION, RENOVATION,
INFRASTRUCTURE, EQUIPMENT AND OTHER
20250HB1331PN2389 - 273 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
RELATED COSTS FOR FACILITIES, FIXED OR
MOBILE, IN WHICH TO CONDUCT CUMBERLAND
COUNTY GOVERNMENT BUSINESS
PROJECT ALLOCATION 15,000,000
(I) SITE PREPARATION, REMEDIATION,
ACQUISITION, RENOVATION, CONSTRUCTION,
INFRASTRUCTURE AND/OR OTHER ASSOCIATED
COSTS FOR AN OZ FUND INC.-AFFILIATED
ECONOMIC DEVELOPMENT, CULTURAL,
HISTORICAL AND/OR REVITALIZATION
PROJECT
PROJECT ALLOCATION 5,000,000
(J) ACQUISITION, REDEVELOPMENT,
RENOVATION, CONSTRUCTION,
INFRASTRUCTURE, EQUIPMENT AND OTHER
RELATED DEVELOPMENT NEEDS FOR LOCAL
ECONOMIC DEVELOPMENT PROJECTS AND
COMMUNITY GROWTH INITIATIVES
PROJECT ALLOCATION 10,000,000
(K) CONSTRUCTION, RENOVATION,
INFRASTRUCTURE, REDEVELOPMENT AND
OTHER RELATED COSTS FOR THE PENN STATE
HOLY SPIRIT MEDICAL CENTER FACILITY
AND CAMPUS
PROJECT ALLOCATION 20,000,000
(ii) Capital Region Economic Development
Corporation
(A) Construction, infrastructure,
redevelopment, renovation and other
related costs for the Penn State
20250HB1331PN2389 - 274 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Health Holy Spirit Medical Center
facility and campus in East Pennsboro
Township
Project Allocation 20,000,000
(iii) Cumberland Area Economic Development
Corporation
(A) Site preparation, remediation,
acquisition, demolition, renovation,
construction, infrastructure
improvements and/or other associated
costs for the redevelopment of
brownfield sites in Cumberland County
Project Allocation 10,000,000
(B) (A) Site preparation, acquisition,
renovation, construction,
redevelopment, infrastructure and
other associated costs for the
development of the Carlisle Sports
Emporium
Project Allocation 5,000,000
(iv) Cumberland County Industrial Development
Authority
(A) Acquisition, demolition, site work,
infrastructure, abatement of hazardous
materials and construction related to
redevelopment projects located in
business districts and downtown areas
Project Allocation 1,792,500
PROJECT ALLOCATION 10,000,000
(B) Construction, acquisition,
20250HB1331PN2389 - 275 -
<--
<--
<--
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
infrastructure, renovation,
rehabilitation and other costs related
to an economic development project
Project Allocation 30,000,000
PROJECT ALLOCATION 60,000,000
(C) ACQUISITION, INFRASTRUCTURE, SITE
PREPARATION, ENVIRONMENTAL
REMEDIATION, CONSTRUCTION, EQUIPMENT
AND RELATED COSTS FOR A CAPITAL
PROJECT UNDERTAKEN BY MESSIAH
UNIVERSITY
PROJECT ALLOCATION 10,000,000
(D) SITE PREPARATION, REMEDIATION,
ACQUISITION, DEMOLITION, RENOVATION,
CONSTRUCTION, INFRASTRUCTURE
IMPROVEMENTS AND/OR OTHER ASSOCIATED
COSTS FOR THE REDEVELOPMENT OF
BROWNFIELD SITES IN CUMBERLAND COUNTY
PROJECT ALLOCATION 10,000,000
(IV.1) CAMP HILL BOROUGH
(A) CONSTRUCTION, REDEVELOPMENT,
INFRASTRUCTURE AND OTHER RELATED COSTS
FOR CAPITAL IMPROVEMENTS AT THE
CAPITAL CITY MALL
PROJECT ALLOCATION 3,000,000
(v) Carlisle Borough
(A) Site preparation, remediation,
acquisition, demolition, renovation,
construction, infrastructure
improvements and/or other associated
20250HB1331PN2389 - 276 -
<--
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
costs for the redevelopment of the
former Frog Switch & Manufacturing
site in Carlisle Borough
Project Allocation 10,000,000
(B) SITE PREPARATION, REMEDIATION,
ACQUISITION, RENOVATION, CONSTRUCTION,
INFRASTRUCTURE AND/OR OTHER ASSOCIATED
COSTS FOR THE REDEVELOPMENT OF AN
UNDERUTILIZED FORMER INDUSTRIAL SITE
ON CHERRY STREET IN THE BOROUGH OF
CARLISLE
PROJECT ALLOCATION 5,000,000
(V.1) EAST PENNSBORO TOWNSHIP
(A) ACQUISITION, CONSTRUCTION,
RECONSTRUCTION, REHABILITATION,
RENOVATION, ENVIRONMENTAL AND
HAZARDOUS ASSESSMENT AND REMEDIATION,
INFRASTRUCTURE IMPROVEMENTS AND OTHER
RELATED COSTS FOR THE DEVELOPMENT OF
COMMUNITY SPORTS AND RECREATIONAL
FACILITIES AT EAST PENNSBORO AREA
SCHOOL DISTRICT
PROJECT ALLOCATION 10,000,000
(vi) Hampden Township
(A) Acquisition, site preparation,
construction, rehabilitation and
renovation activities related to the
development of a community or economic
development project in Hampden
Township
20250HB1331PN2389 - 277 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 10,000,000
(vii) Middlesex Township
(A) Acquisition, site preparation,
renovation, construction, equipment,
infrastructure and/or other associated
costs for improvements to property and
facilities at a family-oriented social
and sports club
Project Allocation 5,000,000
(viii) Monroe Township
(A) Acquisition, site preparation,
renovation, construction,
infrastructure and other related costs
for a community revitalization and
economic development project
Project Allocation 7,500,000
(B) ACQUISITION, RENOVATION,
CONSTRUCTION, ABATEMENT OF HAZARDOUS
MATERIALS AND OTHER RELATED COSTS FOR
A MULTIPURPOSE SPORTS AND
ENTERTAINMENT COMPLEX
PROJECT ALLOCATION 20,000,000
(ix) North Middleton Township
(A) Acquisition, site preparation,
construction, rehabilitation and
renovation activities related to the
development of a community and/or
economic development project in North
Middleton Township
Project Allocation 10,000,000
20250HB1331PN2389 - 278 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(B) CONSTRUCTION, ACQUISITION, SITE
IMPROVEMENT, INFRASTRUCTURE,
ENVIRONMENTAL REMEDIATION,
REDEVELOPMENT AND OTHER RELATED COSTS
FOR A COMMUNITY OR ECONOMIC
DEVELOPMENT PROJECT IN NORTH MIDDLETON
TOWNSHIP
PROJECT ALLOCATION 8,000,000
(x) Shippensburg Borough
(A) Acquisition, site preparation,
demolition, remediation,
infrastructure, construction,
renovations and/or other associated
costs related to a community and/or
economic development project
Project Allocation 4,000,000
(B) Construction, site improvement,
infrastructure, remediation,
redevelopment, equipment and/or other
related costs to improve or expand
Schreiber Foods, Inc.'s, Shippensburg
facility
Project Allocation 15,000,000
(xi) Silver Spring Township
(A) Site preparation, acquisition,
renovation, construction,
redevelopment, infrastructure and/or
other costs associated with developing
a community center, work force
development center and dental clinic
20250HB1331PN2389 - 279 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
in Silver Spring Township
Project Allocation 7,500,000
(xii) South Middleton Township
(A) Acquisition, site preparation,
construction, rehabilitation,
infrastructure and/or renovation
activities related to the development
of a community and/or economic
development project
Project Allocation 5,000,000
(B) Acquisition, site preparation,
construction, rehabilitation and
renovation activities related to the
development of a recreational and
sports facility project
Project Allocation 5,000,000
(xiii) Upper Allen Township
(A) Acquisition, site preparation,
renovation, construction, equipment,
infrastructure and/or other associated
costs for improvements to property and
facilities
Project Allocation 7,500,000
(22) Dauphin County
(i) County projects
(A) Acquisition, construction,
demolition, renovations, site
improvements, infrastructure and other
related costs for economic development
projects within the county
20250HB1331PN2389 - 280 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 30,000,000
(B) Acquisition, construction,
demolition, renovations, site
improvements, infrastructure and other
related costs for affordable housing
within the county
Project Allocation 15,000,000
(C) Construction, demolition,
renovations, site improvements,
infrastructure and other related costs
for improvements to county-owned
buildings
Project Allocation 40,000,000
(D) Acquisition, construction,
demolition, renovations, site
improvements, infrastructure and other
related costs for the consolidation of
county health and human services
operations
Project Allocation 20,000,000
(E) Acquisition, construction,
demolition, renovations, site
improvements, infrastructure and other
related costs for a memorial honoring
fallen police officers
Project Allocation 2,000,000
(F) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
OF HAZARDOUS MATERIALS AND OTHER
20250HB1331PN2389 - 281 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
RELATED COSTS, INCLUDING MACHINERY AND
EQUIPMENT, FOR HARRISTOWN DEVELOPMENT
CORPORATION AND OR RELATED ENTITIES
LOCATED IN HARRISBURG CITY
PROJECT ALLOCATION 10,000,000
(G) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS, INCLUDING MACHINERY AND
EQUIPMENT, FOR PROJECTS INVOLVING A
NEW HEADQUARTERS AND TRAINING FACILITY
FOR A MECHANICAL CONSTRUCTION,
ENGINEERING, MAINTENANCE AND ENERGY
SERVICE ORGANIZATION LOCATED IN
SUSQUEHANNA TOWNSHIP
PROJECT ALLOCATION 10,000,000
(H) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS, INCLUDING MACHINERY AND
EQUIPMENT, FOR A PROJECT FOR
MIDDLETOWN SCHOOL DISTRICT
PROJECT ALLOCATION 10,000,000
(I) CONSTRUCTION, ACQUISITION,
INFRASTRUCTURE, EQUIPMENT AND OTHER
CAPITAL IMPROVEMENTS FOR THE
SWIMHERSHEY AQUATICS FACILITY
PROJECT ALLOCATION 10,000,000
20250HB1331PN2389 - 282 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(J) ACQUISITION, CONSTRUCTION,
REDEVELOPMENT, RENOVATION SITE
DEVELOPMENT, INFRASTRUCTURE, ABATEMENT
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS FOR A MILLERSBURG AREA
SCHOOL DISTRICT PROJECT
PROJECT ALLOCATION 5,000,000
(K) ACQUISITION, REDEVELOPMENT,
RENOVATION, CONSTRUCTION,
INFRASTRUCTURE, EQUIPMENT AND OTHER
RELATED DEVELOPMENT NEEDS FOR LOCAL
ECONOMIC DEVELOPMENT PROJECTS AND
COMMUNITY GROWTH INITIATIVES
PROJECT ALLOCATION 10,000,000
(ii) Capital Region Economic Development
Corporation
(A) Construction, infrastructure,
redevelopment, renovation and other
related costs for the Penn State
Health Milton S. Hershey Medical
Center facility and campus, to include
Penn State College of Medicine
Project Allocation 35,000,000
(B) Acquisition, construction,
infrastructure, redevelopment,
renovation and/or other costs related
to Spirit Production and Packaging
building renovation and new building
construction in Derry Township
Project Allocation 7,500,000
20250HB1331PN2389 - 283 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(iii) Capital Region Water
(A) Acquisition, demolition, site
preparation, remediation and new
construction for activities related to
improving the aging infrastructure in
the City of Harrisburg
Project Allocation 50,000,000
(iv) Dauphin County Redevelopment Authority
(A) Construction, redevelopment,
renovation, rehabilitation and other
related costs for the Historic Tracy
Mansion
Project Allocation 4,500,000
(B) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, RENOVATIONS,
REDEVELOPMENT AND OTHER RELATED COSTS
FOR IMPROVEMENTS TO THE HARRISBURG
SCOTTISH RITE CATHEDRAL AND THEATRE
PROJECT ALLOCATION 10,000,000
(v) City of Harrisburg
(A) Construction, infrastructure, site
preparation, renovation, environmental
remediation, repair and other related
costs to upgrade and renovate the
Jewish Family Services of Greater
Harrisburg facility
Project Allocation 10,000,000
(B) Acquisition, construction,
infrastructure, redevelopment,
abatement of hazardous materials,
20250HB1331PN2389 - 284 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
renovation and rehabilitation of site
and other related costs for the Jewish
Federation of Greater Harrisburg
facilities located in the city of
Harrisburg
Project Allocation 5,000,000
(C) Redevelopment, construction,
infrastructure, rehabilitation and
other related costs for the historic
Tracy Mansion renovation project
located at 1829 North Front Street
Project Allocation 4,500,000
(D) Construction, infrastructure,
acquisition, redevelopment and other
related costs associated with the
Jewish Federation of Greater
Harrisburg facilities, including the
Alexander Grass Campus for Jewish Life
Project Allocation 5,000,000
(E) Acquisition, construction,
demolition, renovations, site
improvements, infrastructure and other
related costs for the relocation of a
mass transit operation within the City
of Harrisburg
Project Allocation 25,000,000
(F) Acquisition, construction,
infrastructure, redevelopment,
renovation, abatement of hazardous
materials, machinery and equipment and
20250HB1331PN2389 - 285 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
other related costs for the
dechannelization of Paxton Creek to
allow for flood mitigation and
additional redevelopment
Project Allocation 60,000,000
(G) ACQUISITION, SITE PREPARATION,
DEMOLITION, REMEDIATION,
INFRASTRUCTURE, CONSTRUCTION,
RENOVATIONS AND OTHER ASSOCIATED COSTS
FOR IMPROVEMENTS TO THE HARRISBURG
AREA YMCA FACILITIES
PROJECT ALLOCATION 10,000,000
(H) CONSTRUCTION, RENOVATION,
REHABILITATION AND OTHER RELATED COSTS
FOR THE INN OF THE DOVE
PROJECT ALLOCATION 1,000,000
(I) CONSTRUCTION, RENOVATION,
REHABILITATION AND OTHER RELATED COSTS
FOR THE YWCA OF GREATER HARRISBURG
PROJECT ALLOCATION 3,000,000
(J) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, REDEVELOPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS AND OTHER RELATED COSTS FOR
THE BROAD STREET MARKET
PROJECT ALLOCATION 15,000,000
(K) CONSTRUCTION, ACQUISITION,
REDEVELOPMENT, RENOVATION,
REHABILITATION, ABATEMENT OF HAZARDOUS
MATERIALS AND OTHER RELATED COSTS FOR
20250HB1331PN2389 - 286 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
ADA IMPROVEMENTS AT THE MLK BUILDING
PROJECT ALLOCATION 10,000,000
(L) CONSTRUCTION, ACQUISITION,
RENOVATION, REHABILITATION,
INFRASTRUCTURE, REDEVELOPMENT AND
OTHER RELATED COSTS FOR THE
CONSTRUCTION OF A STANDARD OLYMPIC-
SIZED SWIMMING POOL IN THE CITY OF
HARRISBURG
PROJECT ALLOCATION 500,000
(M) CONSTRUCTION, INFRASTRUCTURE,
ABATEMENT OF HAZARDOUS MATERIALS,
ACQUISITION, RENOVATION,
REHABILITATION AND OTHER RELATED COSTS
FOR REDEVELOPMENT PROJECTS IN DOWNTOWN
HARRISBURG
PROJECT ALLOCATION 100,000,000
(N) CONSTRUCTION, INFRASTRUCTURE,
ABATEMENT OF HAZARDOUS MATERIALS,
ACQUISITION, REDEVELOPMENT,
RENOVATION, REHABILITATION AND OTHER
RELATED COSTS FOR PROJECTS ALONG
PAXTON CREEK
PROJECT ALLOCATION 60,000,000
(O) CONSTRUCTION, ABATEMENT OF HAZARDOUS
MATERIALS, ACQUISITION, REDEVELOPMENT,
RENOVATION, REHABILITATION AND OTHER
RELATED COSTS FOR DEVELOPMENT OF THE
19TH STREET ARMORY
PROJECT ALLOCATION 15,000,000
20250HB1331PN2389 - 287 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(P) REDEVELOPMENT, ACQUISITION,
CONSTRUCTION, INFRASTRUCTURE,
ABATEMENT OF HAZARDOUS MATERIALS,
RENOVATION, REHABILITATION AND OTHER
RELATED COSTS FOR REHABILITATION OF
HISTORICAL AND BLIGHTED STRUCTURES
PROJECT ALLOCATION 5,000,000
(Q) CONSTRUCTION, INFRASTRUCTURE,
ABATEMENT OF HAZARDOUS MATERIALS,
ACQUISITION, REDEVELOPMENT,
RENOVATION, REHABILITATION AND OTHER
RELATED COSTS FOR DEVELOPMENT AND
IMPROVEMENTS
PROJECT ALLOCATION 10,000,000
(R) ABATEMENT, ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE AND REDEVELOPMENT
ASSISTANCE FOR ECONOMIC DEVELOPMENT
PROJECTS IN THE CITY OF HARRISBURG
PROJECT ALLOCATION 50,000,000
(vi) Dauphin Borough
(A) Construction, infrastructure and/or
other costs related to a community
building project
Project Allocation 1,500,000
(VI.1) HALIFAX BOROUGH
(A) SITE PREPARATION, DEMOLITION,
ACQUISITION, RENOVATION, CONSTRUCTION,
REMEDIATION, INFRASTRUCTURE AND/OR
OTHER ASSOCIATED COSTS FOR DEVELOPMENT
OR EXPANSION OF A HARRISBURG AREA YMCA
20250HB1331PN2389 - 288 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
CHILDCARE AND EARLY EDUCATION CENTER
PROJECT ALLOCATION 5,000,000
(vii) Hummelstown Borough
(A) Construction, infrastructure,
redevelopment, renovation and/or other
costs related to the restoration of
the historic Hotel Warwick
Project Allocation 1,750,000
(viii) Penbrook Borough
(A) Construction and redevelopment of a
borough municipal building
Project Allocation 4,200,000
(ix) Steelton Borough
(A) Construction, infrastructure and
other related costs for the Steelton
Highspire School District Sports
Complex multiphased project
Project Allocation 4,000,000
(B) ACQUISITION, INFRASTRUCTURE, SITE
PREPARATION, ENVIRONMENTAL
REMEDIATION, CONSTRUCTION, EQUIPMENT
AND RELATED COSTS FOR THE
REVITALIZATION OF THE STEEL PLANT SITE
IN STEELTON BOROUGH
PROJECT ALLOCATION 20,000,000
(x) Lower Paxton Township
(A) Construction, infrastructure and/or
other costs related to a project at
Harrisburg Christian School
Project Allocation 1,000,000
20250HB1331PN2389 - 289 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(B) ACQUISITION, SITE PREPARATION,
DEMOLITION, REMEDIATION,
INFRASTRUCTURE, CONSTRUCTION,
RENOVATIONS AND OTHER ASSOCIATED COSTS
FOR IMPROVEMENTS TO THE FRIENDSHIP
YMCA
PROJECT ALLOCATION 5,000,000
(xi) Lower Swatara Township
(A) Site preparation, acquisition,
construction, infrastructure,
abatement of hazardous materials,
redevelopment, renovation and/or other
associated costs for improvements to
or expansion of Wilsbach Distributor,
Inc.'s, facility in support of a
carbon neutrality initiative
Project Allocation 5,000,000
(xii) Susquehanna Township
(A) Construction, renovation,
improvements, abatement of hazardous
materials, redevelopment,
infrastructure, machinery and
equipment, HVAC and other related
costs for the Capital Blue Cross
office in Susquehanna Township
Project Allocation 5,000,000
(B) Acquisition, construction,
demolition, renovations, site
improvements, infrastructure and other
related costs for Susquehanna Union
20250HB1331PN2389 - 290 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Green
Project Allocation 2,500,000
(C) ACQUISITION, INFRASTRUCTURE,
RENOVATION, REHABILITATION,
CONSTRUCTION AND OTHER RELATED COSTS
FOR A PUBLIC SAFETY BUILDING
PROJECT ALLOCATION 2,000,000
(xiii) Swatara Township
(A) Construction, infrastructure,
acquisition and other related costs
for facility and equipment upgrades at
WITF
Project Allocation 10,000,000
(23) Delaware County
(i) County projects
(A) Land acquisition, construction,
demolition, site preparation,
infrastructure improvements and other
related costs for Trinity Health
Project Allocation 75,000,000
(B) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS, INCLUDING MACHINERY AND
EQUIPMENT, FOR AN ECONOMIC DEVELOPMENT
PROJECT IN DELAWARE COUNTY
PROJECT ALLOCATION 50,000,000
(C) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
20250HB1331PN2389 - 291 -
<--
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
REDEVELOPMENT, RENOVATION, ABATEMENT
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS, INCLUDING MACHINERY AND
EQUIPMENT, FOR AN ECONOMIC DEVELOPMENT
OR COMMUNITY ASSET PROJECT IN DELAWARE
COUNTY
PROJECT ALLOCATION 20,000,000
(D) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS, INCLUDING MACHINERY AND
EQUIPMENT, FOR A PROJECT AT CHESTER
UPLAND SCHOOL DISTRICT
PROJECT ALLOCATION 30,000,000
(E) CONSTRUCTION, INFRASTRUCTURE,
RENOVATION, REDEVELOPMENT AND OTHER
RELATED COSTS FOR CONSTRUCTION AT
DELAWARE COUNTY COMMUNITY COLLEGE
PROJECT ALLOCATION 4,000,000
(F) ACQUISITION, SITE PREPARATION,
RENOVATION, CONSTRUCTION,
INFRASTRUCTURE AND OTHER ASSOCIATED
COSTS FOR THE IMPROVEMENT, EXPANSION,
REDEVELOPMENT AND REVITALIZATION OF A
NEMOURS CHILDREN'S HEALTH SYSTEM
PEDIATRIC FACILITY LOCATED IN DELAWARE
COUNTY
PROJECT ALLOCATION 20,000,000
(G) ACQUISITION, CONSTRUCTION,
20250HB1331PN2389 - 292 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
RENOVATION, INFRASTRUCTURE AND OTHER
RELATED ECONOMIC DEVELOPMENT NEEDS FOR
THE REDEVELOPMENT OF WIDENER
UNIVERSITY
PROJECT ALLOCATION 10,000,000
(H) ACQUISITION, SITE PREPARATION,
REDEVELOPMENT, RENOVATION,
CONSTRUCTION, INFRASTRUCTURE,
ABATEMENT OF HAZARDOUS MATERIALS AND
OTHER RELATED COSTS FOR THE
DEVELOPMENT OF PENN MEDICINE AND THE
UNIVERSITY OF PENNSYLVANIA HEALTH
SYSTEM FACILITIES
PROJECT ALLOCATION 10,000,000
(ii) Delaware County Redevelopment Authority
(A) Construction, infrastructure,
abatement of hazardous materials,
acquisition, redevelopment,
renovations, rehabilitation and other
related costs for healthcare
facilities in the City of Chester and
Upland Borough
Project Allocation 20,000,000
(B) Construction, infrastructure,
abatement of hazardous materials,
acquisition, redevelopment,
renovations, rehabilitation and other
related costs for capital projects at
Neumann University
Project Allocation 15,000,000
20250HB1331PN2389 - 293 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(C) LAND ACQUISITION, INFRASTRUCTURE
IMPROVEMENTS, DEMOLITION, SITE
IMPROVEMENT, RENOVATION, ADDITION,
UTILITY EXPANSION, CONSTRUCTION,
PURCHASE OF MEDICAL EQUIPMENT AND
FIXTURES AND OTHER RELATED COSTS FOR
RIDDLE HOSPITAL AND FACILITIES OF MAIN
LINE HOSPITALS, INC.
PROJECT ALLOCATION 20,000,000
(D) CONSTRUCTION, INFRASTRUCTURE,
ACQUISITION, REDEVELOPMENT, ABATEMENT
OF HAZARDOUS MATERIALS, RENOVATION,
REHABILITATION AND OTHER RELATED COSTS
FOR HEALTHCARE FACILITIES IN
SPRINGFIELD TOWNSHIP
PROJECT ALLOCATION 20,000,000
(E) CONSTRUCTION, EXPANSION,
INFRASTRUCTURE IMPROVEMENTS,
DEMOLITION, ENVIRONMENTAL REMEDIATION
AND OTHER RELATED COSTS FOR
IMPLEMENTATION OF THE ELWYN CAMPUS
MASTER PLAN IN MIDDLETOWN TOWNSHIP
PROJECT ALLOCATION 25,000,000
(F) ABATEMENT, ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE AND REDEVELOPMENT
ASSISTANCE FOR ECONOMIC DEVELOPMENT
PROJECTS IN THE CITY OF CHESTER
PROJECT ALLOCATION 50,000,000
(G) ACQUISITION, DEMOLITION, SITE WORK,
REMEDIATION, RENOVATION, CONSTRUCTION
20250HB1331PN2389 - 294 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
AND OTHER RELATED COSTS FOR CAPITAL
IMPROVEMENTS AT THE WIDENER UNIVERSITY
CAMPUS IN THE CITY OF CHESTER,
DELAWARE COUNTY
PROJECT ALLOCATION 10,000,000
(II.1) DELAWARE COUNTY INDUSTRIAL DEVELOPMENT
AUTHORITY
(A) CONSTRUCTION, INFRASTRUCTURE,
ABATEMENT OF HAZARDOUS MATERIALS,
ACQUISITION, REDEVELOPMENT,
RENOVATION, REHABILITATION AND OTHER
RELATED COSTS FOR CAPITAL IMPROVEMENTS
AT VALLEY FORGE MILITARY ACADEMY AND
COLLEGE
PROJECT ALLOCATION 8,000,000
(B) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, MACHINERY, EQUIPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS AND OTHER RELATED COSTS FOR
GRAYSON SCHOOL FACILITIES
PROJECT ALLOCATION 10,000,000
(C) CONSTRUCTION, SITE WORK, REMEDIATION
AND RENOVATION OF MARPLE NEWTOWN
SCHOOL DISTRICT BUILDINGS
PROJECT ALLOCATION 25,000,000
(D) DEMOLITION, SITE WORK, REMEDIATION
AND CONSTRUCTION FOR CAPITAL
IMPROVEMENTS AND POTENTIAL EXPANSION
OF THE EASTERSEALS OF SOUTHEASTERN PA
AT 468 MIDDLETOWN ROAD
20250HB1331PN2389 - 295 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
PROJECT ALLOCATION 5,000,000
(E) ACQUISITION, DEMOLITION, SITE WORK,
REMEDIATION, CONSTRUCTION AND OTHER
RELATED COSTS FOR CAPITAL IMPROVEMENTS
AND POTENTIAL EXPANSION OF THE WAYNE
ART CENTER IN RADNOR TOWNSHIP
PROJECT ALLOCATION 7,500,000
(II.2) CITY OF CHESTER
(A) INFRASTRUCTURE, CONSTRUCTION,
RENOVATION AND OTHER RELATED COSTS FOR
THE CHESTER CITY FIRE DEPARTMENT
BUILDING RENOVATIONS
PROJECT ALLOCATION 5,000,000
(II.3) EDDYSTONE BOROUGH
(A) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, REDEVELOPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS, MACHINERY AND EQUIPMENT AND
OTHER COSTS RELATED TO THE IMPROVEMENT
AND/OR EXPANSION OF FACILITIES AT PENN
TERMINALS
PROJECT ALLOCATION 10,000,000
(II.4) MEDIA BOROUGH
(A) ACQUISITION, DEMOLITION, SITE WORK,
REMEDIATION, CONSTRUCTION AND OTHER
RELATED COSTS FOR CAPITAL IMPROVEMENTS
TO SUSTAIN AND INCREASE THE QUALITY OF
OUR BUSINESS DISTRICT AND QUALITY OF
LIFE IN MEDIA BOROUGH
PROJECT ALLOCATION 15,000,000
20250HB1331PN2389 - 296 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(II.5) TRAINER BOROUGH
(A) ACQUISITION, INFRASTRUCTURE, SITE
PREPARATION, ENVIRONMENTAL
REMEDIATION, CONSTRUCTION, EQUIPMENT
AND RELATED COSTS FOR AN ECONOMIC
DEVELOPMENT OR CAPITAL PROJECT
UNDERTAKEN BY MONROE ENERGY
PROJECT ALLOCATION 30,000,000
(II.6) CONCORD TOWNSHIP
(A) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS, INCLUDING MACHINERY AND
EQUIPMENT, FOR A CIVIC, HISTORICAL,
CULTURAL OR ECONOMIC DEVELOPMENT
PROJECT IN CONCORD TOWNSHIP
PROJECT ALLOCATION 4,000,000
(iii) Haverford Township
(A) Construction and other related costs
for Brookline Park
Project Allocation 500,000
(iv) Marple Township
(A) Construction, infrastructure,
redevelopment, and other costs
associated with repairing the brick
facade at St. Pius X Catholic Church
and School
Project Allocation 6,100,000
(IV.1) MIDDLETOWN TOWNSHIP
20250HB1331PN2389 - 297 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) ACQUISITION, INFRASTRUCTURE,
RENOVATIONS, CONSTRUCTION AND OTHER
RELATED COSTS ASSOCIATED WITH THE
ROOSEVELT COMMUNITY CENTER
PROJECT ALLOCATION 500,000
(v) Radnor Township
(A) Construction, infrastructure and
other related costs for projects in
Fenimore Woods Park
Project Allocation 700,000
(B) Construction, infrastructure,
redevelopment and other related costs
for projects relating to Radnor
Township Building
Project Allocation 500,000
(C) Upgrades and deferred maintenance,
Phase VII, for North Wayne flood
mitigation
Project Allocation 550,000
(D) CONSTRUCTION, REDEVELOPMENT AND OTHER
RELATED COSTS FOR PROJECTS RELATING TO
CREUTZBERG CENTER (PHASE II)
PROJECT ALLOCATION 2,450,000
(V.1) TINICUM TOWNSHIP
(A) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, REDEVELOPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS, MACHINERY AND EQUIPMENT AND
OTHER COSTS RELATED FOR AN ECONOMIC
DEVELOPMENT OR COMMUNITY DEVELOPMENT
20250HB1331PN2389 - 298 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
PROJECT
PROJECT ALLOCATION 5,000,000
(vi) Upper Providence Township
(A) Construction, infrastructure, and
other related costs for the Benchmark
School
Project Allocation 2,500,000
(B) Construction, infrastructure,
acquisition and other related costs to
construct a multiuse building for the
Department of Public Works
Project Allocation 5,000,000
(C) Construction, infrastructure,
acquisition and other related costs
for a community room
Project Allocation 3,000,000
(D) Infrastructure, renovation,
rehabilitation, construction and other
related costs for Louis Scott Memorial
Park
Project Allocation 500,000
(E) Construction, infrastructure,
abatement of hazardous materials,
acquisition, redevelopment,
renovation, rehabilitation and other
related costs to sustain and increase
the quality of life in Upper
Providence Township
Project Allocation 15,000,000
(F) Construction, infrastructure,
20250HB1331PN2389 - 299 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
renovation, rehabilitation,
redevelopment and other related costs
to expand a township municipal
building
Project Allocation 5,000,000
(24) Elk County
(i) County projects
(A) Acquisition, construction and other
costs related to the Abbott Furnace
expansion
Project Allocation 6,000,000
(B) Acquisition, construction,
infrastructure, redevelopment,
abatement of hazardous materials,
renovation and/or other costs for
redevelopment projects
Project Allocation 10,000,000
(ii) Ridgway Borough
(A) Acquisition, construction,
infrastructure, abatement of hazardous
materials, redevelopment and/or other
costs related to the renovation of a
building for social services in the
region
Project Allocation 2,000,000
(25) Erie County
(i) County projects
(A) Acquisition, construction,
demolition, renovations, site
improvements, infrastructure,
20250HB1331PN2389 - 300 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
redevelopment and other related costs
for Zurn Elkay Water Solutions
Project Allocation 10,000,000
(B) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, REDEVELOPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS, MACHINERY AND EQUIPMENT AND
OTHER RELATED COSTS FOR ECONOMIC
DEVELOPMENT AND COMMUNITY IMPROVEMENT
PROJECTS
PROJECT ALLOCATION 15,000,000
(C) ACQUISITION, REDEVELOPMENT,
RENOVATION, CONSTRUCTION,
INFRASTRUCTURE, EQUIPMENT AND OTHER
RELATED DEVELOPMENT NEEDS FOR LOCAL
ECONOMIC DEVELOPMENT PROJECTS AND
COMMUNITY GROWTH INITIATIVES
PROJECT ALLOCATION 10,000,000
(D) ACQUISITION, DEMOLITION, SITE WORK,
REMEDIATION, RENOVATION, CONSTRUCTION
AND OTHER RELATED COSTS FOR CAPITAL
IMPROVEMENTS AT THE MERCY CENTER FOR
WOMEN
PROJECT ALLOCATION 10,000,000
(II) ERIE COUNTY GENERAL AUTHORITY
(A) FOR THE ACQUISITION, REHABILITATION,
REDEVELOPMENT, INFRASTRUCTURE AND
CONSTRUCTION OF PUBLIC SAFETY AND
PUBLIC WORKS BUILDINGS IN THE CITY OF
ERIE
20250HB1331PN2389 - 301 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
PROJECT ALLOCATION 30,000,000
(B) ACQUISITION, DEMOLITION, RENOVATION,
REMEDIATION, INFRASTRUCTURE AND OTHER
RELATED COSTS FOR AN ECONOMIC
DEVELOPMENT PROJECT IN ERIE COUNTY
PROJECT ALLOCATION 25,000,000
(C) ACQUISITION, INFRASTRUCTURE,
CONSTRUCTION, ABATEMENT AND OTHER
RELATED COSTS FOR THE DEVELOPMENT OF
AN INDUSTRIAL AND BUSINESS PARK WITHIN
ERIE COUNTY
PROJECT ALLOCATION 20,000,000
(D) CONSTRUCTION, ACQUISITION,
RENOVATION, REHABILITATION,
INFRASTRUCTURE AND OTHER RELATED COSTS
FOR PROJECTS AT GANNON UNIVERSITY
PROJECT ALLOCATION 30,000,000
(III) MILLCREEK TOWNSHIP GENERAL AUTHORITY
(A) ACQUISITION, REHABILITATION,
INFRASTRUCTURE AND CONSTRUCTION FOR
IMPROVEMENTS TO PROMOTE BUSINESS
EXPANSION AND REDEVELOPMENT WITHIN
MILLCREEK TOWNSHIP
PROJECT ALLOCATION 25,000,000
(ii) (IV) North East Community Authority
(A) Construction, infrastructure,
redevelopment, renovation and other
related costs for a comprehensive
rehabilitation of the North East
Marina, including dredging and fixing
20250HB1331PN2389 - 302 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
the marina wall and upgrades to the
slips, fuel dock and other facilities
Project Allocation 15,000,000
(V) REDEVELOPMENT AUTHORITY OF ERIE
(A) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, REDEVELOPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS, MACHINERY AND EQUIPMENT AND
OTHER RELATED COSTS FOR EXPANSION OF
LAKE ERIE COLLEGE OF OSTEOPATHIC
MEDICINE, INCLUDING NEW BUILDINGS AND
FACILITIES
PROJECT ALLOCATION 25,000,000
(B) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, RENOVATION,
REHABILITATION AND OTHER RELATED COSTS
FOR IMPROVEMENTS TO THE ERIE ZOO
PROJECT ALLOCATION 15,000,000
(C) ACQUISITION, REHABILITATION AND
CONSTRUCTION OF ADVANCED TECHNOLOGY
AGRICULTURE PRODUCTION FACILITY IN
ERIE COUNTY
PROJECT ALLOCATION 20,000,000
(D) ACQUISITION, INFRASTRUCTURE
IMPROVEMENTS, ABATEMENT,
REHABILITATION AND CONSTRUCTION FOR
REVITALIZATION EFFORTS THAT PROMOTE
INVESTMENT AND ECONOMIC GROWTH AS
PRIORITIZED BY INFINITE ERIE'S
INVESTMENT PLAYBOOK
20250HB1331PN2389 - 303 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
PROJECT ALLOCATION 50,000,000
(VI) MILLCREEK TOWNSHIP
(A) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, REDEVELOPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS, MACHINERY AND EQUIPMENT AND
OTHER RELATED COSTS FOR THE PENINSULA
DRIVE MULTIPURPOSE TRAIL
PROJECT ALLOCATION 15,000,000
(26) Fayette County (Reserved)
(26) FAYETTE COUNTY
(I) COUNTYWIDE
(A) CONSTRUCTION, RENOVATION,
INFRASTRUCTURE AND OTHER RELATED
ECONOMIC DEVELOPMENT NEEDS FOR A
CURRENT OR FORMER HIGHER EDUCATION
CAMPUS
PROJECT ALLOCATION 10,000,000
(27) Forest County (Reserved)
(28) Franklin County
(i) County projects
(A) Site preparation, acquisition,
renovation, construction,
redevelopment, infrastructure,
remediation and/or other associated
costs for the construction of a
community and/or economic development
project in Franklin County
Project Allocation 10,000,000
(ii) Franklin County Area Development
20250HB1331PN2389 - 304 -
<--
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Corporation
(A) Acquisition, construction,
infrastructure, redevelopment,
renovation and/or other costs related
to an economic development project
within the Greencastle-Antrim School
District or the Waynesboro Area School
District
Project Allocation 5,000,000
(iii) Antrim Township
(A) For the site work, construction,
infrastructure and costs associated
with an economic development,
healthcare or related project
Project Allocation 15,000,000
(iv) Borough of Chambersburg
(A) Site preparation, acquisition,
renovation, construction,
redevelopment, infrastructure and/or
other costs associated with the
development of community and/or
economic development project
Project Allocation 5,000,000
(v) Borough of Waynesboro
(A) Site preparation, acquisition,
renovation, construction,
redevelopment, infrastructure and/or
other associated costs for the
renovation and/or construction of a
community and/or economic development
20250HB1331PN2389 - 305 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
project
Project Allocation 5,000,000
(vi) Greene Township
(A) Site preparation, acquisition,
renovation, construction,
redevelopment, infrastructure and/or
other associated costs for the
construction of a community and/or
economic development project
Project Allocation 5,000,000
(B) Site preparation, acquisition,
renovation, construction,
redevelopment, infrastructure and/or
other associated costs for the
development of the Letterkenny Sports
Complex
Project Allocation 10,000,000
(vii) Guilford Township
(A) Construction, infrastructure and/or
other costs related to the building of
a training house to be used for fire,
EMS and police training exercises
Project Allocation 2,000,000
(viii) Quincy Township
(A) Site work, construction and/or other
associated costs related to upgrades
to municipal buildings
Project Allocation 500,000
(ix) Washington Township
(A) Acquisition, site development,
20250HB1331PN2389 - 306 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
infrastructure, construction,
abatement, equipment and other related
costs for a community or economic
development project
Project Allocation 10,000,000
(X) COUNTYWIDE
(A) CONSTRUCTION, RENOVATION,
INFRASTRUCTURE AND OTHER RELATED
ECONOMIC DEVELOPMENT NEEDS FOR A
CURRENT OR FORMER HIGHER EDUCATION
CAMPUS
PROJECT ALLOCATION 10,000,000
(29) Fulton County (Reserved)
(30) Greene County (Reserved)
(31) Huntingdon County (Reserved)
(32) Indiana County
(i) County projects
(A) Acquisition, rehabilitation,
infrastructure improvements,
construction and related costs for
industrial building development
projects
Project Allocation 15,000,000
(B) Acquisition, abatement, renovation,
rehabilitation, redevelopment,
infrastructure improvements,
construction and related costs for
economic development projects
Project Allocation 10,000,000
(C) Acquisition, rehabilitation,
20250HB1331PN2389 - 307 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
infrastructure improvements,
construction and related costs for
community/economic development
revitalization and blight-related
projects
Project Allocation 10,000,000
(D) Acquisition, rehabilitation,
infrastructure improvements,
construction and related costs for
business park development projects
Project Allocation 10,000,000
(E) Acquisition, rehabilitation,
renovations, infrastructure
improvements, construction and related
costs for building revitalization
projects, including historical
structures
Project Allocation 10,000,000
(F) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS, INCLUDING MACHINERY AND
EQUIPMENT, FOR AN ECONOMIC DEVELOPMENT
PROJECT IN INDIANA COUNTY
PROJECT ALLOCATION 10,000,000
(33) Jefferson County
(i) County projects
(A) Acquisition, construction,
infrastructure, redevelopment,
20250HB1331PN2389 - 308 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
renovation and/or other related costs
for a visitor's center
Project Allocation 500,000
(B) Acquisition, construction,
redevelopment, renovation and/or other
related costs to develop a new space
for Jefferson County Domestic
Relations and Magisterial District
Judge 54-3-03
Project Allocation 1,000,000
(C) Construction, renovation and/or other
related costs for a new 911 center
Project Allocation 5,000,000
(D) Acquisition, abatement, renovation,
rehabilitation, redevelopment,
infrastructure improvements,
construction and related costs for
economic development projects
Project Allocation 10,000,000
(ii) Brookville Borough
(A) Acquisition, construction,
renovation, redevelopment, site
development, infrastructure, abatement
of hazardous materials, equipment and
other related costs for community
revitalization and economic
development projects
Project Allocation 10,000,000
(B) Construction, renovation and/or other
related costs to address safety
20250HB1331PN2389 - 309 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
concerns at Jefferson County
facilities, including steps to the
courthouse and sidewalks in front of
the courthouse and Jefferson Place
Project Allocation 1,000,000
(34) Juniata County
(i) County projects
(A) Acquisition, construction,
infrastructure, abatement of hazardous
materials, redevelopment, renovation
and/or other costs related to economic
development
Project Allocation 10,000,000
(35) Lackawanna County
(i) County projects
(A) Construction, infrastructure,
improvements, acquisition,
renovations, abatement and other
related costs for an economic or
community development project in the
county
Project Allocation 50,000,000
(B) Acquisition, construction,
renovation, infrastructure and other
costs related to properties owned or
to be acquired by the Fellowship House
Foundation
Project Allocation 4,000,000
(C) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
20250HB1331PN2389 - 310 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
REDEVELOPMENT, RENOVATION, ABATEMENT
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS, INCLUDING MACHINERY AND
EQUIPMENT, FOR A MULTI-USE ECONOMIC
DEVELOPMENT PROJECT LOCATED IN THE 200
BLOCK OF WYOMING AVENUE IN THE CITY OF
SCRANTON
PROJECT ALLOCATION 30,000,000
(D) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS, INCLUDING MACHINERY AND
EQUIPMENT, FOR A PROJECT FOR LAKELAND
SCHOOL DISTRICT
PROJECT ALLOCATION 15,000,000
(E) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, MACHINERY, EQUIPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS, REHABILITATION AND OTHER
RELATED COSTS FOR HEALTH CARE AND
HOSPITAL PROJECTS IN LACKAWANNA COUNTY
PROJECT ALLOCATION 75,000,000
(F) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, REDEVELOPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS, MACHINERY AND EQUIPMENT AND
OTHER RELATED COSTS FOR ECONOMIC
DEVELOPMENT PROJECTS
PROJECT ALLOCATION 25,000,000
20250HB1331PN2389 - 311 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(I.1) REDEVELOPMENT AUTHORITY OF LACKAWANNA
COUNTY
(A) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, REDEVELOPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS, MACHINERY AND EQUIPMENT AND
OTHER RELATED COSTS FOR THE SCRANTON
SCHOOL FOR THE DEAF AND HARD OF
HEARING
PROJECT ALLOCATION 5,000,000
(ii) City of Carbondale
(A) Acquisition, construction,
renovation, infrastructure and other
costs related to properties owned or
to be acquired by Carbondale
Development Partners II, LLC
Project Allocation 2,500,000
(B) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, MACHINERY, EQUIPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS, REHABILITATION AND OTHER
RELATED COSTS FOR ECONOMIC DEVELOPMENT
AND COMMUNITY DEVELOPMENT PROJECTS
PROJECT ALLOCATION 5,000,000
(iii) City of Scranton
(A) Acquisition, construction,
renovation, infrastructure and other
costs related to the Medical Arts
Building located at 327 N. Washington
Avenue, Scranton, Pennsylvania
20250HB1331PN2389 - 312 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 4,000,000
(B) Acquisition, construction,
infrastructure, abatement of hazardous
materials, redevelopment, renovation
and/or other related costs for an
economic development project
Project Allocation 2,500,000
(C) ACQUISITION, DESIGN, CONSTRUCTION,
INFRASTRUCTURE IMPROVEMENTS,
RENOVATION AND OTHER RELATED COSTS FOR
A CAMPUS IMPROVEMENT PROJECT FOR THE
UNIVERSITY OF SCRANTON
PROJECT ALLOCATION 15,000,000
(D) CONSTRUCTION AND OTHER RELATED COSTS
FOR THE RENOVATION OR DEVELOPMENT OF
UNIVERSITY OF SCRANTON ATHLETIC
FACILITIES
PROJECT ALLOCATION 15,000,000
(E) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, RENOVATION, EQUIPMENT,
REHABILITATION, DEMOLITION AND OTHER
RELATED COSTS FOR JOHNSON COLLEGE
PROJECT ALLOCATION 15,000,000
(F) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, REDEVELOPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS, MACHINERY AND EQUIPMENT AND
OTHER RELATED COSTS FOR ECONOMIC
DEVELOPMENT PROJECTS
PROJECT ALLOCATION 25,000,000
20250HB1331PN2389 - 313 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(G) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, REDEVELOPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS, MACHINERY AND EQUIPMENT AND
OTHER RELATED COSTS FOR HISTORIC
NEIGHBORHOOD DEVELOPMENT PROJECT IN
THE PLOT SECTION OF SCRANTON
PROJECT ALLOCATION 5,000,000
(IV) ARCHBALD BOROUGH
(A) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, MACHINERY, EQUIPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS, REHABILITATION AND OTHER
RELATED COSTS FOR ECONOMIC DEVELOPMENT
AND COMMUNITY DEVELOPMENT PROJECTS
PROJECT ALLOCATION 5,000,000
(V) BLAKELY BOROUGH
(A) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, MACHINERY, EQUIPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS, REHABILITATION AND OTHER
RELATED COSTS FOR ECONOMIC DEVELOPMENT
AND COMMUNITY DEVELOPMENT PROJECTS
PROJECT ALLOCATION 5,000,000
(B) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, MACHINERY, EQUIPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS, REHABILITATION AND OTHER
RELATED COSTS FOR A COMMUNITY AND
RECREATION CENTER
20250HB1331PN2389 - 314 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
PROJECT ALLOCATION 10,000,000
(VI) CLARKS GREEN BOROUGH
(A) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, REDEVELOPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS, MACHINERY AND EQUIPMENT AND
OTHER RELATED COSTS FOR ECONOMIC
DEVELOPMENT PROJECTS
PROJECT ALLOCATION 5,000,000
(VII) CLARKS SUMMIT BOROUGH
(A) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, REDEVELOPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS, MACHINERY AND EQUIPMENT AND
OTHER RELATED COSTS FOR ECONOMIC
DEVELOPMENT PROJECTS
PROJECT ALLOCATION 5,000,000
(VIII) DICKSON CITY BOROUGH
(A) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, REDEVELOPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS, MACHINERY AND EQUIPMENT AND
OTHER RELATED COSTS FOR ECONOMIC
DEVELOPMENT PROJECTS
PROJECT ALLOCATION 5,000,000
(B) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, REDEVELOPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS, MACHINERY AND EQUIPMENT AND
OTHER RELATED COSTS FOR LACKAWANNA
20250HB1331PN2389 - 315 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
EXECUTIVE PARK
PROJECT ALLOCATION 5,500,000
(IX) DUNMORE BOROUGH
(A) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, MACHINERY, EQUIPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS, REHABILITATION AND OTHER
RELATED COSTS FOR ECONOMIC DEVELOPMENT
AND COMMUNITY DEVELOPMENT PROJECTS
PROJECT ALLOCATION 5,000,000
(X) JERMYN BOROUGH
(A) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, MACHINERY, EQUIPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS, REHABILITATION AND OTHER
RELATED COSTS FOR ECONOMIC DEVELOPMENT
AND COMMUNITY DEVELOPMENT PROJECTS
PROJECT ALLOCATION 5,000,000
(XI) JESSUP BOROUGH
(A) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, MACHINERY, EQUIPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS, REHABILITATION AND OTHER
RELATED COSTS FOR ECONOMIC DEVELOPMENT
AND COMMUNITY DEVELOPMENT PROJECTS
PROJECT ALLOCATION 5,000,000
(XII) MAYFIELD BOROUGH
(A) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, MACHINERY, EQUIPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
20250HB1331PN2389 - 316 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
MATERIALS, REHABILITATION AND OTHER
RELATED COSTS FOR ECONOMIC DEVELOPMENT
AND COMMUNITY DEVELOPMENT PROJECTS
PROJECT ALLOCATION 5,000,000
(XIII) OLYPHANT BOROUGH
(A) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, MACHINERY, EQUIPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS, REHABILITATION AND OTHER
RELATED COSTS FOR ECONOMIC DEVELOPMENT
AND COMMUNITY DEVELOPMENT PROJECTS
PROJECT ALLOCATION 5,000,000
(iv) (XIV) Taylor Borough
(A) Construction and infrastructure
related to Schiff's Food Service,
Inc., warehouse expansion
Project Allocation 1,750,000
(XV) THROOP BOROUGH
(A) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, MACHINERY, EQUIPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS, REHABILITATION AND OTHER
RELATED COSTS FOR ECONOMIC DEVELOPMENT
AND COMMUNITY DEVELOPMENT PROJECTS
PROJECT ALLOCATION 5,000,000
(XVI) VANDLING BOROUGH
(A) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, MACHINERY, EQUIPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS, REHABILITATION AND OTHER
20250HB1331PN2389 - 317 -
<--
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
RELATED COSTS FOR ECONOMIC DEVELOPMENT
AND COMMUNITY DEVELOPMENT PROJECTS
PROJECT ALLOCATION 5,000,000
(XVII) CARBONDALE TOWNSHIP
(A) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, MACHINERY, EQUIPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS, REHABILITATION AND OTHER
RELATED COSTS FOR ECONOMIC DEVELOPMENT
AND COMMUNITY DEVELOPMENT PROJECTS
PROJECT ALLOCATION 5,000,000
(XVIII) FELL TOWNSHIP
(A) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, MACHINERY, EQUIPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS, REHABILITATION AND OTHER
RELATED COSTS FOR ECONOMIC DEVELOPMENT
AND COMMUNITY DEVELOPMENT PROJECTS
PROJECT ALLOCATION 5,000,000
(XIX) JEFFERSON TOWNSHIP
(A) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, MACHINERY, EQUIPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS, REHABILITATION AND OTHER
RELATED COSTS FOR ECONOMIC DEVELOPMENT
AND COMMUNITY DEVELOPMENT PROJECTS
PROJECT ALLOCATION 5,000,000
(XX) NORTH ABINGTON TOWNSHIP
(A) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, REDEVELOPMENT,
20250HB1331PN2389 - 318 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS, MACHINERY AND EQUIPMENT AND
OTHER RELATED COSTS FOR ECONOMIC
DEVELOPMENT PROJECTS
PROJECT ALLOCATION 5,000,000
(XXI) SOUTH ABINGTON TOWNSHIP
(A) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, REDEVELOPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS, MACHINERY AND EQUIPMENT AND
OTHER RELATED COSTS FOR ECONOMIC
DEVELOPMENT PROJECTS
PROJECT ALLOCATION 5,000,000
(XXII) WAVERLY TOWNSHIP
(A) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, REDEVELOPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS, MACHINERY AND EQUIPMENT AND
OTHER RELATED COSTS FOR ECONOMIC
DEVELOPMENT PROJECTS
PROJECT ALLOCATION 5,000,000
(B) CONSTRUCTION, INFRASTRUCTURE,
ABATEMENT OF HAZARDOUS MATERIALS,
RENOVATIONS, REHABILITATION AND OTHER
RELATED COSTS FOR UPGRADES AT THE
WAVERLY COMMUNITY HOUSE
PROJECT ALLOCATION 1,663,000
(36) Lancaster County
(i) County projects
(A) Design, demolition, abatement of
20250HB1331PN2389 - 319 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
hazardous materials, extensions or
upgrading of utilities, site grading,
construction of new space, facade
preservation, fit-out of existing
space, infrastructure upgrade and
other related costs in Lancaster
County
Project Allocation 15,000,000
(B) Acquisition, site preparation,
renovation, construction, remediation,
infrastructure, and/or other
associated costs for a United
Disabilities Services Foundation
project in Lancaster County
Project Allocation 5,000,000
(C) Acquisition, construction,
infrastructure, machinery, equipment,
renovation, abatement of hazardous
materials and other related costs for
development projects at Franklin and
Marshall College in Lancaster County
Project Allocation 10,000,000
(D) ACQUISITION, SITE PREPARATION,
RENOVATION, CONSTRUCTION, REMEDIATION,
INFRASTRUCTURE AND/OR OTHER COSTS
ASSOCIATED WITH DEVELOPMENT OF A
UNITED DISABILITIES SERVICES
FOUNDATION RECUPERATIVE CARE FACILITY
PROJECT ALLOCATION 5,000,000
(E) ACQUISITION, DESIGN, DEMOLITION,
20250HB1331PN2389 - 320 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS, INCLUDING MACHINERY AND
EQUIPMENT, FOR AN ECONOMIC DEVELOPMENT
PROJECT IN MANHEIM TOWNSHIP
PROJECT ALLOCATION 30,000,000
(F) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS, INCLUDING MACHINERY AND
EQUIPMENT, FOR A COMMUNITY ASSET
PROJECT IN MANHEIM TOWNSHIP
PROJECT ALLOCATION 15,000,000
(G) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
OF HAZARDOUS MATERIALS, ROADWAY AND
UTILITY IMPROVEMENTS, STREETSCAPE
ENHANCEMENTS AND OTHER ASSOCIATED
COSTS, INCLUDING MACHINERY AND
EQUIPMENT, RELATED TO THE CONSTRUCTION
OF A NEW POLICE STATION AND
ADMINISTRATION BUILDING IN MANHEIM
TOWNSHIP
PROJECT ALLOCATION 20,000,000
(H) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
20250HB1331PN2389 - 321 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS, INCLUDING MACHINERY AND
EQUIPMENT, FOR AN ECONOMIC DEVELOPMENT
PROJECT ALONG CORPORATE BOULEVARD IN
WEST HEMPFIELD TOWNSHIP
PROJECT ALLOCATION 3,000,000
(I) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS, INCLUDING MACHINERY AND
EQUIPMENT, FOR A COMMUNITY ASSET
PROJECT IN EAST HEMPFIELD TOWNSHIP
PROJECT ALLOCATION 5,000,000
(J) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS, INCLUDING MACHINERY AND
EQUIPMENT, FOR AN ECONOMIC DEVELOPMENT
PROJECT ALONG HOLLAND STREET IN EAST
HEMPFIELD TOWNSHIP
PROJECT ALLOCATION 6,000,000
(K) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS, INCLUDING MACHINERY AND
EQUIPMENT, FOR AN ECONOMIC DEVELOPMENT
PROJECT ON OR RELATED TO THE THADDEUS
20250HB1331PN2389 - 322 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
STEVENS COLLEGE OF TECHNOLOGY CAMPUS
PROJECT ALLOCATION 25,000,000
(L) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS, INCLUDING MACHINERY AND
EQUIPMENT, FOR AN ECONOMIC DEVELOPMENT
PROJECT FOR A COMPANY INVOLVED WITH
RUBBER RECLAMATION
PROJECT ALLOCATION 10,000,000
(M) DESIGN, DEMOLITION, ABATEMENT OF
HAZARDOUS MATERIALS, EXTENSIONS OR
UPGRADING OF UTILITIES, SITE GRADING,
CONSTRUCTION OF NEW SPACE, FACADE
PRESERVATION, FIT-OUT OF EXISTING
SPACE, INFRASTRUCTURE UPGRADE AND
OTHER RELATED COSTS FOR DART CONTAINER
CORPORATION
PROJECT ALLOCATION 15,000,000
(N) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, REDEVELOPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS, MACHINERY AND EQUIPMENT AND
OTHER COSTS RELATED TO THE IMPROVEMENT
OF A DIRECT WIRE AND CABLE FACILITY IN
LANCASTER COUNTY
PROJECT ALLOCATION 10,000,000
(O) CONSTRUCTION, INFRASTRUCTURE,
ACQUISITION, REDEVELOPMENT,
20250HB1331PN2389 - 323 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
RENOVATION, REHABILITATION AND OTHER
RELATED COSTS FOR AN OZ FUND INC.-
AFFILIATED ECONOMIC DEVELOPMENT,
CULTURAL, HISTORICAL OR REVITALIZATION
PROJECT
PROJECT ALLOCATION 5,000,000
(P) ACQUISITION, CONSTRUCTION,
REHABILITATION, INFRASTRUCTURE,
DEMOLITION, SITE PREPARATION,
ENVIRONMENTAL REMEDIATION AND OTHER
RELATED COSTS FOR ECONOMIC DEVELOPMENT
PROJECTS IN LANCASTER COUNTY
PROJECT ALLOCATION 25,000,000
(Q) ACQUISITION, SITE PREPARATION,
REDEVELOPMENT, RENOVATION,
CONSTRUCTION, INFRASTRUCTURE,
ABATEMENT OF HAZARDOUS MATERIALS AND
OTHER RELATED COSTS FOR THE
DEVELOPMENT OF PENN MEDICINE AND THE
UNIVERSITY OF PENNSYLVANIA HEALTH
SYSTEM FACILITIES
PROJECT ALLOCATION 10,000,000
(ii) Lancaster County Housing and
Redevelopment Authority
(A) Acquisition, redevelopment,
renovation, construction,
infrastructure and other related costs
for economic development projects in
Lancaster County
Project Allocation 10,000,000
20250HB1331PN2389 - 324 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(iii) Lititz Regional Community Development
Corporation
(A) Acquisition, design, demolition,
construction, infrastructure,
redevelopment, renovation, abatement
of hazardous materials and other
related costs, including equipment and
machinery, for a community asset
project in Elizabeth Township
Project Allocation 15,000,000
(B) Acquisition, design, demolition,
construction, infrastructure,
redevelopment, renovation, abatement
of hazardous materials and other
related costs, including equipment and
machinery, for an economic development
project in Elizabeth Township
Project Allocation 30,000,000
(C) Acquisition, design, demolition,
construction, infrastructure,
redevelopment, renovation, abatement
of hazardous materials and other
related costs, including equipment and
machinery, for a community asset
project in Lititz Borough
Project Allocation 15,000,000
(D) Acquisition, design, demolition,
construction, infrastructure,
redevelopment, renovation, abatement
of hazardous materials and other
20250HB1331PN2389 - 325 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
related costs, including equipment and
machinery, for an economic development
project in Lititz Borough
Project Allocation 30,000,000
(E) Acquisition, design, demolition,
construction, infrastructure,
redevelopment, renovation, abatement
of hazardous materials and other
related costs, including equipment and
machinery, related to redevelopment of
properties situated between North
Broad Street and North Cedar Street
adjacent to the Norfolk Southern rail
line in Lititz Borough
Project Allocation 20,000,000
(F) Acquisition, design, demolition,
construction, infrastructure,
redevelopment, renovation, abatement
of hazardous materials and other
related costs, including equipment and
machinery, for an economic development
project in Warwick Township
Project Allocation 30,000,000
(G) Acquisition, design, demolition,
construction, infrastructure,
redevelopment, renovation, abatement
of hazardous materials and other
related costs, including equipment and
machinery, for a community asset
project in Warwick Township
20250HB1331PN2389 - 326 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 15,000,000
(iv) City of Lancaster
(A) Construction, renovation,
rehabilitation and other related costs
associated with renovations to the
YWCA in Lancaster City
Project Allocation 7,600,000
(B) Construction, abatement of hazardous
materials, acquisition, renovation,
rehabilitation and other related costs
to renovate Price Elementary School
Project Allocation 12,500,000
(C) Construction, infrastructure,
redevelopment and other related costs
for the Wheatland Avenue Habitat
Condominiums
Project Allocation 3,500,000
(D) Acquisition, construction,
infrastructure, redevelopment,
renovation, abatement of hazardous
materials, machinery and equipment and
other related costs for public works
infrastructure
Project Allocation 4,000,000
(E) Acquisition, construction,
infrastructure, redevelopment,
renovation, abatement of hazardous
materials, machinery and equipment for
capital improvements and expansion of
amenities at the Conestoga Pines Park
20250HB1331PN2389 - 327 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
and SE Parks
Project Allocation 5,000,000
(F) Acquisition, infrastructure,
remediation, abatement of hazardous
materials, renovation, construction
and other costs related to the
development and expansion of
multimodal transportation safety
initiatives
Project Allocation 5,000,000
(G) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, MACHINERY, EQUIPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS AND OTHER RELATED COSTS FOR
ECONOMIC DEVELOPMENT OR COMMUNITY
DEVELOPMENT PROJECTS
PROJECT ALLOCATION 15,000,000
(H) CONSTRUCTION, INFRASTRUCTURE,
RENOVATION, REHABILITATION AND OTHER
RELATED COSTS FOR THE YFORWARD PROJECT
PROJECT ALLOCATION 3,789,000
(I) CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION,
REHABILITATION AND OTHER RELATED COSTS
FOR A MIXED-USE DEVELOPMENT ON STEVENS
AVENUE
PROJECT ALLOCATION 1,500,000
(v) Ephrata Borough
(A) Acquisition, site preparation,
construction, rehabilitation and
20250HB1331PN2389 - 328 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
renovation activities related to the
development of a civic and/or economic
development project
Project Allocation 5,000,000
(vi) East Hempfield Township
(A) Acquisition, site preparation,
renovation, construction, remediation,
infrastructure and/or other associated
costs to improve or expand United
Disabilities Services Foundation
facilities in East Hempfield Township
Project Allocation 5,000,000
(vii) Manheim Township
(A) Design, construction, infrastructure
and related costs for Phase II and
Phase III of Overlook Community Park
master plan
Project Allocation 1,500,000
(B) Acquisition, construction,
infrastructure, redevelopment,
renovation, abatement of hazardous
materials and other associated costs,
including machinery and equipment,
related to the construction of a new
police station and administration
building in Manheim Township,
Lancaster County
Project Allocation 20,000,000
(C) Acquisition, design, demolition,
construction, infrastructure,
20250HB1331PN2389 - 329 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
redevelopment, renovation, abatement
of hazardous materials and other
related costs, including machinery and
equipment, for a community asset
project in Manheim Township, Lancaster
County
Project Allocation 15,000,000
(D) Acquisition, design, demolition,
construction, infrastructure,
redevelopment, renovation, abatement
of hazardous materials and other
related costs, including machinery and
equipment, for an economic development
project in Manheim Township, Lancaster
County
Project Allocation 30,000,000
(E) ACQUISITION, INFRASTRUCTURE, SITE
PREPARATION, ENVIRONMENTAL
REMEDIATION, CONSTRUCTION, EQUIPMENT
AND RELATED COSTS FOR AN ECONOMIC
DEVELOPMENT OR CAPITAL PROJECT
UNDERTAKEN BY ARCONIC, INC., AT ITS
LANCASTER FACILITY
PROJECT ALLOCATION 20,000,000
(VII.1) MILLERSVILLE BOROUGH
(A) REDEVELOPMENT, CONSTRUCTION,
INFRASTRUCTURE, ACQUISITION, ABATEMENT
OF HAZARDOUS MATERIALS, RENOVATION,
REHABILITATION AND OTHER RELATED COSTS
FOR MIXED-USE DEVELOPMENT AND HOUSING
20250HB1331PN2389 - 330 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
PROJECTS
PROJECT ALLOCATION 10,000,000
(viii) Penn Township
(A) Acquisition, site preparation,
infrastructure, remediation,
renovation, construction and/or other
related costs associated with the
development and/or expansion of a
wheat and rye processing facility
Project Allocation 4,000,000
(37) Lawrence County
(i) Lawrence County Economic Development
Corporation
(A) Acquisition, infrastructure,
rehabilitation, abatement of hazardous
materials, construction and other
related costs for arts and cultural
institutions in Lawrence County
Project Allocation 8,000,000
(B) Acquisition, infrastructure,
rehabilitation, abatement of hazardous
materials, construction and other
related costs for public services
buildings in Lawrence County
Project Allocation 2,500,000
(C) Acquisition, infrastructure,
rehabilitation, abatement of hazardous
materials, construction and other
related costs for libraries in
Lawrence County
20250HB1331PN2389 - 331 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 2,000,000
(D) Acquisition, infrastructure,
rehabilitation, abatement of hazardous
materials, construction and other
related costs for hospitals, medical
centers and public services facilities
in Lawrence County
Project Allocation 10,000,000
(E) Acquisition, infrastructure,
rehabilitation, abatement of hazardous
materials, construction and other
related costs for downtown
redevelopment and revitalization in
Lawrence County
Project Allocation 7,500,000
(F) Acquisition, infrastructure,
rehabilitation, abatement of hazardous
materials, construction and other
related costs for industrial
development in Lawrence County
Project Allocation 20,000,000
(G) Acquisition, infrastructure,
rehabilitation, abatement of hazardous
materials, construction and other
related costs for commercial
development in Lawrence County
Project Allocation 3,500,000
(H) Acquisition, infrastructure,
rehabilitation, abatement of hazardous
materials, construction and other
20250HB1331PN2389 - 332 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
related costs for the development of
an industrial multitenant facility in
Lawrence County
Project Allocation 3,500,000
(I) Acquisition, infrastructure,
rehabilitation, abatement of hazardous
materials, construction and other
related costs for brownfield
redevelopment in Lawrence County
Project Allocation 10,000,000
(J) Acquisition, infrastructure,
rehabilitation, abatement of hazardous
materials, construction and other
related costs of development
associated with agriculture processors
in Lawrence County
Project Allocation 10,000,000
(K) Acquisition, infrastructure,
rehabilitation, abatement of hazardous
materials, construction and other
related costs of development
associated with institutions of higher
education in Lawrence County
Project Allocation 8,000,000
(L) Acquisition, infrastructure,
rehabilitation, abatement of hazardous
materials, construction and other
related costs of industrial/commercial
development or revitalization in
Mahoning Township
20250HB1331PN2389 - 333 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 15,000,000
(38) Lebanon County
(i) County projects
(A) Acquisition, site preparation,
remediation, infrastructure,
construction and/or renovation
activities related to the development
and/or redevelopment of a large-scale
industrial site and/or facility
Project Allocation 10,000,000
(B) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS, INCLUDING MACHINERY AND
EQUIPMENT, FOR AN ECONOMIC DEVELOPMENT
PROJECT ON WEST WASHINGTON AVENUE IN
MYERSTOWN
PROJECT ALLOCATION 5,000,000
(ii) City of Lebanon
(A) Acquisition, demolition, site
preparation, infrastructure, new
construction for activities related to
a neighborhood revitalization
strategy, both commercial and
residential, from Cumberland Street to
Maple Street and 5th Avenue West to
12th Street
Project Allocation 25,000,000
(B) Acquisition, demolition, new
20250HB1331PN2389 - 334 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
construction, infrastructure,
remediation for housing and other
development projects in the City of
Lebanon in coordination with the City
of Lebanon Land Bank and/or the
Lebanon County Redevelopment Authority
Project Allocation 5,000,000
(C) Acquisition, design, demolition,
redevelopment, construction,
infrastructure and other costs related
to housing and other economic
development
Project Allocation 3,600,000
(39) Lehigh County
(i) County projects
(A) Acquisition, site preparation,
remediation, infrastructure,
construction and/or renovation
activities related to the development
and/or redevelopment of a large-scale
industrial site and/or facility in
Lehigh County
Project Allocation 10,000,000
(B) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, REDEVELOPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS, MACHINERY AND EQUIPMENT AND
OTHER RELATED COSTS FOR THE ALLENTOWN
ART MUSEUM EXPANSION AND RENOVATION
PROJECT
20250HB1331PN2389 - 335 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
PROJECT ALLOCATION 7,500,000
(C) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, ABATEMENT OF HAZARDOUS
MATERIALS, REDEVELOPMENT AND
RENOVATION/REHABILITATION OF COUNTY-
OWNED SKILLED NURSING FACILITY
PROJECT ALLOCATION 10,000,000
(D) CONSTRUCTION, RENOVATION,
INFRASTRUCTURE IMPROVEMENTS AND
BUSINESS DEVELOPMENT IN LEHIGH VALLEY
INTERNATIONAL AIRPORT TO SUPPORT
REGIONAL ECONOMIC GROWTH
PROJECT ALLOCATION 12,000,000
(E) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE AND OTHER RELATED COSTS
AT THE LEHIGH VALLEY ZOO
PROJECT ALLOCATION 10,000,000
(I.1) REDEVELOPMENT AUTHORITY OF LEHIGH
COUNTY
(A) CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT AND OTHER RELATED COSTS
FOR DEVELOPMENT ALONG ROUTE 145
PROJECT ALLOCATION 4,000,000
(I.2) WHITEHALL TOWNSHIP INDUSTRIAL AND
COMMERCIAL DEVELOPMENT AUTHORITY
(A) CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT AND OTHER RELATED COSTS
FOR REUSE OF THE FORMER DENT HARDWARE
FACTORY
PROJECT ALLOCATION 6,500,000
20250HB1331PN2389 - 336 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(ii) City of Allentown
(A) Acquisition, construction,
redevelopment and related assistance
for creation of a trucking parking lot
Project Allocation 500,000
(B) Construction, acquisition,
infrastructure, renovations, upgrades
and other related costs to a youth
facility/community center in central
Allentown
Project Allocation 7,500,000
(C) Construction, infrastructure,
renovations, upgrades and other
related costs for rehabilitation of
the former historic Liberty Bell site
in downtown Allentown
Project Allocation 1,500,000
(D) ACQUISITION, DESIGN, CONSTRUCTION,
INFRASTRUCTURE, REDEVELOPMENT,
RENOVATION AND OTHER RELATED COSTS FOR
A NEW POLICE TRAINING ACADEMY
PROJECT ALLOCATION 10,000,000
(E) ACQUISITION, DESIGN, CONSTRUCTION,
INFRASTRUCTURE, REDEVELOPMENT,
RENOVATION AND OTHER RELATED COSTS FOR
A HIGHER EDUCATION FACILITY
PROJECT ALLOCATION 10,000,000
(F) CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION AND OTHER
RELATED COSTS FOR JEWISH COMMUNITY
20250HB1331PN2389 - 337 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
CENTER CAMPUS AND FACILITIES
PROJECT ALLOCATION 10,000,000
(G) CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION AND OTHER
RELATED COSTS FOR FACILITY OWNED BY
ALLENTOWN BAND
PROJECT ALLOCATION 500,000
(H) CONSTRUCTION, INFRASTRUCTURE,
RENOVATION, REHABILITATION AND OTHER
RELATED COSTS FOR UPGRADES TO
FACILITIES WITHIN THE ALLENTOWN SCHOOL
DISTRICT
PROJECT ALLOCATION 1,000,000
(iii) Salisbury Township
(A) Construction, infrastructure,
redevelopment and other related costs
for the Lehigh Valley Hospital Cedar
Crest Campus to expand the Children's
Hospital
Project Allocation 20,000,000
(IV) SOUTH WHITEHALL TOWNSHIP
(A) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, ABATEMENT OF HAZARDOUS
MATERIALS, REDEVELOPMENT,
RENOVATION/REHABILITATION OF CULTURAL,
CIVIC, HISTORIC PROJECT IN SOUTH
WHITEHALL TOWNSHIP
PROJECT ALLOCATION 1,250,000
(B) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, ABATEMENT OF HAZARDOUS
20250HB1331PN2389 - 338 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
MATERIALS, REDEVELOPMENT,
RENOVATION/REHABILITATION FOR ECONOMIC
DEVELOPMENT PROJECT IN SOUTH WHITEHALL
TOWNSHIP
PROJECT ALLOCATION 7,500,000
(C) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, REDEVELOPMENT,
RENOVATION AND OTHER RELATED COSTS FOR
CONSTRUCTION OF FIRE AND EMERGENCY
MANAGEMENT FACILITIES
PROJECT ALLOCATION 4,000,000
(V) UPPER MACUNGIE TOWNSHIP
(A) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, REDEVELOPMENT,
RENOVATION AND OTHER RELATED COSTS FOR
CONSTRUCTION OF POLICE AND EMERGENCY
MANAGEMENT FACILITIES
PROJECT ALLOCATION 9,000,000
(B) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, REDEVELOPMENT,
RENOVATION AND OTHER RELATED COSTS FOR
CONSTRUCTION OF FIRE AND EMERGENCY
MANAGEMENT FACILITIES
PROJECT ALLOCATION 4,000,000
(C) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, REDEVELOPMENT,
RENOVATION AND OTHER RELATED COSTS FOR
CONSTRUCTION OF TOWNSHIP
ADMINISTRATIVE AND OPERATIONS FACILITY
PROJECT ALLOCATION 3,000,000
20250HB1331PN2389 - 339 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(D) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, REDEVELOPMENT,
RENOVATION AND OTHER RELATED COSTS FOR
SOCIAL SERVICES FACILITY IN UPPER
MACUNGIE TOWNSHIP
PROJECT ALLOCATION 3,000,000
(E) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, REDEVELOPMENT,
RENOVATION AND OTHER RELATED COSTS FOR
EARLY CHILDHOOD EDUCATION FACILITY IN
UPPER MACUNGIE TOWNSHIP
PROJECT ALLOCATION 1,000,000
(F) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, REDEVELOPMENT,
RENOVATION AND OTHER RELATED COSTS FOR
AFFORDABLE HOUSING FACILITY IN UPPER
MACUNGIE TOWNSHIP
PROJECT ALLOCATION 3,000,000
(G) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, ABATEMENT OF HAZARDOUS
MATERIALS, REDEVELOPMENT AND
RENOVATION/REHABILITATION OF
INDUSTRIAL PROJECT IN UPPER MACUNGIE
TOWNSHIP
PROJECT ALLOCATION 7,500,000
(H) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, ABATEMENT OF HAZARDOUS
MATERIALS, REDEVELOPMENT AND
RENOVATION/REHABILITATION OF MIXED-USE
FACILITY IN UPPER MACUNGIE TOWNSHIP
20250HB1331PN2389 - 340 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
PROJECT ALLOCATION 5,000,000
(I) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, ABATEMENT OF HAZARDOUS
MATERIALS, REDEVELOPMENT AND
RENOVATION/REHABILITATION OF PARKS AND
RECREATION FACILITIES IN UPPER
MACUNGIE TOWNSHIP
PROJECT ALLOCATION 2,500,000
(J) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, ABATEMENT OF HAZARDOUS
MATERIALS, REDEVELOPMENT AND
RENOVATION/REHABILITATION OF HEALTH
CARE FACILITIES IN UPPER MACUNGIE
TOWNSHIP
PROJECT ALLOCATION 5,000,000
(K) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, ABATEMENT OF HAZARDOUS
MATERIALS, REDEVELOPMENT AND
RENOVATION/REHABILITATION OF CULTURAL,
CIVIC AND HISTORIC PROJECT IN UPPER
MACUNGIE TOWNSHIP
PROJECT ALLOCATION 1,250,000
(40) Luzerne County
(i) County projects
(A) Acquisition, construction,
redevelopment, renovation,
rehabilitation, infrastructure,
abatement of hazardous materials, site
preparation and other related costs
associated with an economic
20250HB1331PN2389 - 341 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
development project
Project Allocation 10,000,000
(B) Acquisition, design, demolition,
construction, infrastructure,
redevelopment, renovation, abatement
of hazardous materials and other
related costs, including machinery and
equipment, for a project at the
Hazleton Area School District
Project Allocation 10,000,000
(C) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS, INCLUDING MACHINERY AND
EQUIPMENT, FOR A PROJECT FOR AN
ECONOMIC DEVELOPMENT PROJECT IN
LUZERNE COUNTY
PROJECT ALLOCATION 50,000,000
(D) CONSTRUCTION, RENOVATION,
INFRASTRUCTURE AND OTHER RELATED
ECONOMIC DEVELOPMENT NEEDS FOR A
CURRENT OR FORMER HIGHER EDUCATION
CAMPUS
PROJECT ALLOCATION 10,000,000
(ii) CAN DO, Inc.
(A) Acquisition, construction,
infrastructure and other related costs
for the CrossRoads East economic
development project and surrounding
20250HB1331PN2389 - 342 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
lands in Hazle Township
Project Allocation 15,000,000
(iii) The Greater Wilkes-Barre Industrial
Fund
(A) Acquisition, construction,
renovation, infrastructure and other
costs related to properties owned or
to be acquired by True North of NEPA,
LLC
Project Allocation 3,500,000
(III.1) LUZERNE COUNTY REDEVELOPMENT
AUTHORITY
(A) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE IMPROVEMENTS,
RENOVATION, EQUIPMENT AND OTHER
RELATED COSTS FOR THE WEINBERG
NORTHEAST PENNSYLVANIA REGIONAL FOOD
BANK AND ITS MEMBER AGENCIES
PROJECT ALLOCATION 5,000,000
(iv) City of Nanticoke
(A) Acquisition, construction,
redevelopment, renovation,
rehabilitation, infrastructure,
abatement of hazardous materials, site
preparation and other related costs
associated with an economic
development project
Project Allocation 10,000,000
(v) City of Pittston
(A) Acquisition, construction, site
20250HB1331PN2389 - 343 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
development, infrastructure, abatement
of hazardous materials, equipment and
other related costs for community
revitalization and economic
development projects at 234 N. Main
Street
Project Allocation 2,600,000
(V.1) CITY OF WILKES-BARRE
(A) ACQUISITION, SITE PREPARATION,
CONSTRUCTION, REHABILITATION,
INFRASTRUCTURE AND/OR RENOVATION
ACTIVITIES RELATED TO THE IMPROVEMENT
AND/OR EXPANSION OF FACILITIES FOR
WILKES UNIVERSITY
PROJECT ALLOCATION 5,000,000
(B) ACQUISITION, SITE AND INFRASTRUCTURE
IMPROVEMENTS, REDEVELOPMENT,
CONSTRUCTION,
RENOVATION/REHABILITATION, RELOCATION
AND OTHER RELATED COSTS FOR AN
ECONOMIC DEVELOPMENT PROJECT IMPACTING
SOCIAL SERVICE NEEDS PROVIDED BY
VOLUNTEERS OF AMERICA OF PENNSYLVANIA
PROJECT ALLOCATION 2,500,000
(C) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, RENOVATION, EQUIPMENT,
REHABILITATION, DEMOLITION AND OTHER
RELATED COSTS FOR MATERNAL AND FAMILY
HEALTH SERVICES
PROJECT ALLOCATION 15,000,000
20250HB1331PN2389 - 344 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(D) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, RENOVATION, EQUIPMENT,
REHABILITATION, DEMOLITION AND OTHER
RELATED COSTS FOR CHILDREN'S SERVICES
CENTER
PROJECT ALLOCATION 15,000,000
(vi) Edwardsville Borough
(A) Acquisition, construction,
redevelopment, renovation,
rehabilitation, infrastructure,
abatement of hazardous materials, site
preparation and other related costs
associated with an economic
development project
Project Allocation 10,000,000
(vii) Exeter Borough
(A) Construction, acquisition,
infrastructure, renovation,
rehabilitation, abatement of hazardous
materials and other related costs for
main streetscape and commercial
development
Project Allocation 2,500,000
(viii) Forty Fort Borough
(A) Acquisition, construction,
infrastructure and other related costs
for the redevelopment of land for the
headquarters of Forty Fort Public
Works and the West Side Council of
Governments
20250HB1331PN2389 - 345 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 2,000,000
(ix) Kingston Borough
(A) Acquisition, construction,
infrastructure, abatement of hazardous
materials, redevelopment, renovation
and/or other related costs for an
economic development project
Project Allocation 5,000,000
(B) Construction, renovation and other
related costs for redeveloping Church
Street and other Kingston Borough
parks
Project Allocation 750,000
(C) Redevelopment, renovation and other
related costs for redeveloping
Riverbend Park area
Project Allocation 1,500,000
(D) Acquisition, construction,
infrastructure, abatement of hazardous
materials, redevelopment, renovation
and/or other related costs for an
economic development project
Project Allocation 2,000,000
(E) Acquisition, construction,
infrastructure, abatement of hazardous
materials, redevelopment, renovation
and/or other related costs for an
economic development project
Project Allocation 2,500,000
(F) Construction, infrastructure,
20250HB1331PN2389 - 346 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
renovation and other related costs for
the redevelopment of blighted property
Project Allocation 1,500,000
(x) Luzerne Borough
(A) Acquisition, infrastructure,
redevelopment and other related costs
for economic development projects in
the historic and business districts
Project Allocation 2,000,000
(xi) Swoyersville Borough
(A) Construction, acquisition,
infrastructure, renovation,
rehabilitation, abatement of hazardous
materials and other related costs for
mixed-use housing and commercial
development
Project Allocation 7,500,000
(xii) West Hazleton Borough
(A) Acquisition, construction,
infrastructure, abatement of hazardous
materials, redevelopment, renovation
and/or other related costs for an
economic development project
Project Allocation 2,500,000
(xiii) Wyoming Borough
(A) Construction, infrastructure,
renovation and other related costs for
redeveloping Wyoming Borough's
economic and historic district
Project Allocation 2,000,000
20250HB1331PN2389 - 347 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(xiv) Hanover Township
(A) Acquisition, construction,
redevelopment, renovation,
rehabilitation, infrastructure,
abatement of hazardous materials, site
preparation and other related costs
associated with an economic
development project
Project Allocation 5,000,000
(B) Acquisition, construction,
infrastructure, abatement of hazardous
materials, redevelopment, renovation
and/or other related costs for an
economic development project
Project Allocation 2,500,000
(xv) Hazle Township
(A) Construction, acquisition,
infrastructure, renovation,
rehabilitation and other related costs
for a new ambulatory health care
campus for Lehigh Valley Health
Network
Project Allocation 10,000,000
(B) Demolition, construction,
infrastructure, renovation and/or
other costs associated with the
demolition of an existing hotel and
construction of a Country Inn & Suites
Hotel
Project Allocation 5,000,000
20250HB1331PN2389 - 348 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(C) Acquisition, construction,
infrastructure, abatement of hazardous
materials, redevelopment, renovation
and/or other related costs for an
economic development project
Project Allocation 3,000,000
(xvi) Jenkins Township
(A) Acquisition, construction,
infrastructure, and other related
costs for the CenterPoint East
Expansion economic development project
Project Allocation 2,600,000
(xvii) Rice Township
(A) Acquisition, construction,
redevelopment, renovation,
rehabilitation, infrastructure,
abatement of hazardous materials, site
preparation and other related costs
associated with an economic
development project
Project Allocation 10,000,000
(XVII.1) WHITEHALL TOWNSHIP
(A) CONSTRUCTION, DESIGN, ACQUISITION,
INFRASTRUCTURE, REDEVELOPMENT AND
OTHER ASSOCIATED COSTS FOR A
RECREATION AND LIFESTYLE FACILITY IN
WHITEHALL TOWNSHIP
PROJECT ALLOCATION 7,000,000
(xviii) Wright Township
(A) Acquisition, construction,
20250HB1331PN2389 - 349 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
redevelopment, renovation,
rehabilitation, infrastructure,
abatement of hazardous materials, site
preparation and other related costs
associated with an economic
development project
Project Allocation 10,000,000
(41) Lycoming County
(I) COUNTY PROJECTS
(A) ACQUISITION, REDEVELOPMENT,
RENOVATION, CONSTRUCTION,
INFRASTRUCTURE, EQUIPMENT AND OTHER
RELATED DEVELOPMENT NEEDS FOR LOCAL
ECONOMIC DEVELOPMENT PROJECTS AND
COMMUNITY GROWTH INITIATIVES
PROJECT ALLOCATION 15,000,000
(B) ACQUISITION, CONSTRUCTION, ABATEMENT
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS FOR A NEW BUILDING AND
EXPANSION OF EXISTING FACILITIES AT
THE PENNSYLVANIA COLLEGE OF TECHNOLOGY
PROJECT ALLOCATION 10,000,000
(i) (II) City of Williamsport
(A) Acquisition, reclamation,
infrastructure improvements and
construction to land and facilities at
the Pennsylvania College of Technology
in the city of Williamsport
Project Allocation 10,000,000
(B) Acquisition, construction,
20250HB1331PN2389 - 350 -
<--
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
renovation, redevelopment, site
development, infrastructure, abatement
of hazardous materials, equipment and
other related costs for community
revitalization and economic
development projects
Project Allocation 20,000,000
(42) McKean County
(i) County projects
(A) Acquisition, infrastructure,
construction and other related costs
for a health care facility that will
provide maternal care, including
childbirth services
Project Allocation 10,000,000
(B) Acquisition, infrastructure,
construction, redevelopment or other
related costs for a housing or
economic development project
Project Allocation 10,000,000
(C) ACQUISITION, DEMOLITION,
INFRASTRUCTURE AND OTHER RELATED COSTS
FOR THE UNIVERSITY OF PITTSBURGH AT
BRADFORD, INCLUDING RENOVATION AND
REHABILITATION OF EXISTING FACILITIES
AND CONSTRUCTION OF NEW FACILITIES
PROJECT ALLOCATION 10,000,000
(D) ACQUISITION, INFRASTRUCTURE,
CONSTRUCTION,
RENOVATION/REHABILITATION, EXPANSION
20250HB1331PN2389 - 351 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
AND OTHER RELATED COSTS FOR PROJECTS
AT BRADFORD REGIONAL MEDICAL CENTER
PROJECT ALLOCATION 15,000,000
(E) ACQUISITION, INFRASTRUCTURE, DESIGN,
ENGINEERING, CONSTRUCTION AND OTHER
RELATED COSTS TO BUILD A COMMUNITY
HOSPITAL
PROJECT ALLOCATION 20,000,000
(ii) City of Bradford
(A) Renovation of an existing building
for a new police station facility and
the construction of a new fire station
to replace antiquated and undersized
facilities
Project Allocation 5,000,000
(B) Acquisition, demolition,
infrastructure and other related costs
for the University of Pittsburgh at
Bradford, including renovation and
rehabilitation of existing facilities
and construction of new facilities
Project Allocation 10,000,000
(C) (B) Acquisition, demolition,
construction, renovation and other
related costs associated with
improvements to the Marilyn Horne Hall
Building and affiliated parking lots
at the University of Pittsburgh at
Bradford
Project Allocation 10,000,000
20250HB1331PN2389 - 352 -
<--
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(D) (C) Acquisition of property,
demolition, renovation, construction
and other related costs, including
related infrastructure improvements,
for the development of housing
Project Allocation 5,000,000
(E) (D) Renovation or replacement of the
swimming pool, splash pad and
adjoining bathhouse facility along
with the renovation of other
recreational facilities in Callahan
Park and improvements to the
recreational facilities at Kessel
Field
Project Allocation 5,000,000
(F) (E) Acquisition, demolition,
renovation, construction and other
related costs associated with the
development of a soccer/lacrosse
stadium, press box, concession, locker
room facility and field house, field
lighting and roadway improvements
located at the Kessel Athletic Complex
Project Allocation 10,000,000
(G) (F) Property acquisition and building
renovation/construction related to the
development of the Triangle Works
Collaborative, LLC, McKean County
Incubator-Accelerator facility in the
City of Bradford
20250HB1331PN2389 - 353 -
<--
<--
<--
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 5,000,000
(H) (G) Acquisition of land and/or
buildings, capital building
improvements, including construction
or renovation, and infrastructure and
site development costs to promote
economic development, community
development, downtown revitalization,
recreation and health care needs
Project Allocation 10,000,000
(iii) Port Allegany Borough
(A) Acquisition and other costs
associated with the relocation of all
utility infrastructure related to the
construction of a levee
Project Allocation 1,750,000
(43) Mercer County
(I) COUNTY PROJECTS
(A) ACQUISITION, ABATEMENT OF HAZARDOUS
MATERIALS, INFRASTRUCTURE,
CONSTRUCTION, REDEVELOPMENT, SITE
DEVELOPMENT AND OTHER RELATED COSTS OF
A PROJECT FOR THE NATIONAL ELECTRICAL
CONTRACTORS ASSOCIATION AND ITS
MEMBERSHIP
PROJECT ALLOCATION 7,000,000
(B) CONSTRUCTION, RENOVATION,
INFRASTRUCTURE AND OTHER RELATED
ECONOMIC DEVELOPMENT NEEDS FOR A
CURRENT OR FORMER HIGHER EDUCATION
20250HB1331PN2389 - 354 -
<--
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
CAMPUS
PROJECT ALLOCATION 10,000,000
(i) (II) Penn Northwest Development
Corporation
(A) Construction, infrastructure,
machinery and/or other costs related
to a facility expansion, development
of a GCFU molding machine, material
handling system and two compounding
lines for MoxieTec in Pine Township
Project Allocation 11,850,000
(ii) (III) Clark Borough
(A) Construction, infrastructure, site
preparation, renovation, environmental
remediation, repair and other related
costs to upgrade and renovate the
municipal and fire department
buildings
Project Allocation 10,000,000
(IV) GREENVILLE BOROUGH
(A) CONSTRUCTION, INFRASTRUCTURE,
RENOVATIONS, ACQUISITION AND OTHER
RELATED COSTS FOR THE REDEVELOPMENT OF
THE TRINITY NORTH AREA OF THE BOROUGH
PROJECT ALLOCATION 10,000,000
(44) Mifflin County (Reserved)
(I) COUNTY PROJECTS
(A) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
20250HB1331PN2389 - 355 -
<--
<--
<--
<--
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS, INCLUDING MACHINERY AND
EQUIPMENT, FOR A MULTI-USE FACILITY
OWNED AND OPERATED BY LEWISTOWN
BOROUGH
PROJECT ALLOCATION 5,000,000
(B) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS, INCLUDING MACHINERY AND
EQUIPMENT, FOR AN ECONOMIC DEVELOPMENT
OR COMMUNITY ASSET PROJECT IN MIFFLIN
COUNTY
PROJECT ALLOCATION 10,000,000
(II) LEWISTOWN BOROUGH
(A) PLANNING, DESIGN, CONSTRUCTION,
INFRASTRUCTURE, RENOVATION,
REHABILITATION AND OTHER RELATED COSTS
FOR IMPROVEMENTS TO THE SALVATION ARMY
LEWISTOWN CORPS SITE, INCLUDING
PARKING AREA AND CAMPUS IMPROVEMENT
PROJECT ALLOCATION 1,500,000
(45) Monroe County
(i) Monroe County Industrial Development
Authority
(A) Construction, infrastructure and/or
other costs related to renovations for
the Pleasant Valley School District in
Chestnuthill Township
20250HB1331PN2389 - 356 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 4,000,000
(I.1) EAST STROUDSBURG BOROUGH
(A) ACQUISITION, CONSTRUCTION,
RENOVATION, REHABILITATION AND OTHER
RELATED COSTS FOR THE REDEVELOPMENT OF
A VACANT MEDICAL BUILDING
PROJECT ALLOCATION 13,500,000
(ii) Stroudsburg Borough
(A) Acquisition, construction, site
development, infrastructure, abatement
of hazardous materials, equipment and
other related costs for community
revitalization and economic
development projects in Stroudsburg
Borough
Project Allocation 10,000,000
(B) Acquisition, construction, site
development, infrastructure, abatement
of hazardous materials, equipment and
other related costs for renovation of
Stroudsburg Borough Hall
Project Allocation 5,000,000
(C) ACQUISITION, CONSTRUCTION,
RENOVATION, REHABILITATION AND OTHER
RELATED COSTS FOR A MIXED-USE
DEVELOPMENT PROJECT
PROJECT ALLOCATION 16,148,000
(D) ACQUISITION, CONSTRUCTION,
RENOVATION, REHABILITATION AND OTHER
RELATED COSTS FOR REDEVELOPMENT OF A
20250HB1331PN2389 - 357 -
<--
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
FORMER HOTEL SITE
PROJECT ALLOCATION 27,700,000
(46) Montgomery County
(i) County projects
(A) Construction, infrastructure, site
preparation, renovation, environmental
remediation, repair and other related
costs to upgrade and renovate the
Montgomery County 4-H facility
Project Allocation 10,000,000
(B) Abatement, site work, acquisition,
construction, infrastructure and
redevelopment assistance,
environmental remediation and other
related costs for the redevelopment of
Elmwood Park Zoo
Project Allocation 30,000,000
(C) Construction, infrastructure, site
preparation, renovation, environmental
remediation, repair and other related
costs to redevelop, reconstruct and
recreate Methacton High School
Project Allocation 20,000,000
(D) Construction, infrastructure, site
preparation, renovation, environmental
remediation, repair and other related
costs to redevelop, reconstruct and
recreate the La Salle College High
School campus
Project Allocation 20,000,000
20250HB1331PN2389 - 358 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(E) Acquisition, demolition, site
infrastructure, including grading,
environmental, site and civil
engineering, architectural design,
mechanical, electrical, plumbing, and
structural engineering, development
fees, storm water, E&S controls,
paving, concrete curbing, concrete
sidewalks, site lighting, new water
and sewer lines, new gas lines, new
site electric, electrical substation
and telecommunication infrastructure,
including new fiber lines, for
Montgomery County supporting
infrastructure
Project Allocation 75,000,000
(F) Acquisition, site preparation,
renovation, construction,
infrastructure and other associated
costs for the improvement, expansion,
redevelopment and revitalization of a
Nemours Children's Health System
pediatric facility located in
Montgomery County
Project Allocation 20,000,000
(G) ACQUISITION, SITE PREPARATION,
RENOVATION, CONSTRUCTION AND
INFRASTRUCTURE COSTS FOR ECONOMIC
DEVELOPMENT PROJECTS IN MONTGOMERY
COUNTY
20250HB1331PN2389 - 359 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
PROJECT ALLOCATION 100,000,000
(H) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS, INCLUDING MACHINERY AND
EQUIPMENT, FOR A MIXED-USE ECONOMIC
DEVELOPMENT PROJECT IN MONTGOMERY
COUNTY
PROJECT ALLOCATION 10,000,000
(I) ACQUISITION, INFRASTRUCTURE,
RENOVATIONS, REHABILITATION,
CONSTRUCTION AND OTHER RELATED COSTS
FOR CAMPUS RENOVATION AND
MISCELLANEOUS IMPROVEMENT PROJECTS IN
THE JENKINTOWN SCHOOL DISTRICT
PROJECT ALLOCATION 17,000,000
(J) CONSTRUCTION, ACQUISITION, SITE
IMPROVEMENT, INFRASTRUCTURE,
ENVIRONMENTAL REMEDIATION,
REDEVELOPMENT AND OTHER RELATED COSTS
FOR A REDEVELOPMENT PROJECT AT GWYN
NOR ELEMENTARY SCHOOL
PROJECT ALLOCATION 21,562,000
(K) CONSTRUCTION, ACQUISITION, SITE
IMPROVEMENT, INFRASTRUCTURE,
ENVIRONMENTAL REMEDIATION,
REDEVELOPMENT AND OTHER RELATED COSTS
FOR A REDEVELOPMENT PROJECT AT OAK
PARK ELEMENTARY SCHOOL
20250HB1331PN2389 - 360 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
PROJECT ALLOCATION 16,641,000
(L) CONSTRUCTION, ACQUISITION, SITE
IMPROVEMENT, INFRASTRUCTURE,
ENVIRONMENTAL REMEDIATION,
REDEVELOPMENT AND OTHER RELATED COSTS
FOR ELEMENTARY SCHOOL PLAYGROUND
PROJECTS IN THE NORTH PENN SCHOOL
DISTRICT
PROJECT ALLOCATION 4,117,000
(M) CONSTRUCTION, ACQUISITION, SITE
IMPROVEMENT, INFRASTRUCTURE,
ENVIRONMENTAL REMEDIATION,
REDEVELOPMENT AND OTHER RELATED COSTS
FOR THE REDEVELOPMENT OF THE NORTH
PENN SCHOOL DISTRICT HIGH SCHOOL
PROJECT ALLOCATION 259,562,000
(N) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, REDEVELOPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS, MACHINERY AND EQUIPMENT AND
OTHER COSTS RELATED TO IMPROVING OR
CREATING AN SPCA FACILITY IN
MONTGOMERY COUNTY
PROJECT ALLOCATION 20,000,000
(O) CONSTRUCTION, RENOVATION,
INFRASTRUCTURE UPGRADES AND OTHER
RELATED COSTS FOR THE MODERNIZATION OF
THE NORRISTOWN PUBLIC LIBRARY
PROJECT ALLOCATION 28,060,000
(P) DEMOLITION, CONSTRUCTION, RENOVATION,
20250HB1331PN2389 - 361 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
INFRASTRUCTURE, SITE PREPARATION,
ENVIRONMENTAL REMEDIATION AND OTHER
RELATED COSTS FOR THE REDEVELOPMENT OF
CAMP RAINBOW IN SCHWENKSVILLE
PROJECT ALLOCATION 2,500,000
(Q) RENOVATION, REHABILITATION,
CONSTRUCTION AND OTHER RELATED COSTS
FOR UPGRADES AT ELEMENTARY SCHOOLS IN
THE NORTH PENN SCHOOL DISTRICT
PROJECT ALLOCATION 2,059,000
(R) ACQUISITION, SITE PREPARATION,
REDEVELOPMENT, RENOVATION,
CONSTRUCTION, INFRASTRUCTURE,
ABATEMENT OF HAZARDOUS MATERIALS AND
OTHER RELATED COSTS FOR THE
DEVELOPMENT OF PENN MEDICINE AND THE
UNIVERSITY OF PENNSYLVANIA HEALTH
SYSTEM FACILITIES
PROJECT ALLOCATION 10,000,000
(ii) Montgomery County Redevelopment
Authority
(A) Acquisition, construction,
demolition, renovations, site
improvements, infrastructure and other
related costs for the redevelopment
and improvement of the Norristown
State Hospital property and its
immediate surrounding area
Project Allocation 20,000,000
(B) Construction, infrastructure and
20250HB1331PN2389 - 362 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
renovations to the Lansdale Hospital
Project Allocation 5,000,000
(C) ACQUISITION, INFRASTRUCTURE,
CONSTRUCTION, REDEVELOPMENT,
RENOVATION, REHABILITATION AND OTHER
RELATED COSTS FOR DEVELOPMENT OF
SPORTS COMPLEXES
PROJECT ALLOCATION 10,000,000
(D) LAND ACQUISITION, INFRASTRUCTURE
IMPROVEMENTS, DEMOLITION, SITE
IMPROVEMENT, RENOVATION, ADDITION,
UTILITY EXPANSION, CONSTRUCTION,
PURCHASE OF MEDICAL EQUIPMENT AND
FIXTURES AND OTHER RELATED COSTS FOR
FACILITIES OF MAIN LINE HOSPITALS,
INC.
PROJECT ALLOCATION 20,000,000
(E) ACQUISITION, REDEVELOPMENT,
CONSTRUCTION, INFRASTRUCTURE,
REMEDIATION AND OTHER COSTS RELATED TO
A PROJECT IN MONTGOMERY COUNTY
PROJECT ALLOCATION 20,000,000
(F) SITE PREPARATION, ACQUISITION,
CONSTRUCTION, REDEVELOPMENT,
RENOVATION, REHABILITATION,
INFRASTRUCTURE AND OTHER RELATED COSTS
FOR THE EXPANSION OF THE MARTIN LUTHER
SCHOOL IN MONTGOMERY COUNTY
PROJECT ALLOCATION 5,000,000
(G) ACQUISITION, CONSTRUCTION,
20250HB1331PN2389 - 363 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
INFRASTRUCTURE, ABATEMENT OF HAZARDOUS
MATERIALS, REDEVELOPMENT, RENOVATION,
REHABILITATION AND OTHER RELATED COSTS
FOR A NEW HOSPITAL TOWER AT POTTSTOWN
HOSPITAL
PROJECT ALLOCATION 30,000,000
(iii) Abington Township Economic Development
Corporation
(A) Acquisition, construction, site
development, infrastructure, abatement
of hazardous materials, equipment and
other related costs for community
revitalization and economic
development projects in Abington
Township
Project Allocation 15,000,000
(III.1) CHELTENHAM COMMUNITY DEVELOPMENT
CORPORATION
(A) ACQUISITION, CONSTRUCTION, SITE
DEVELOPMENT, INFRASTRUCTURE
IMPROVEMENTS, ABATEMENT OF HAZARDOUS
MATERIALS AND EQUIPMENT PURCHASES FOR
COMMUNITY REVITALIZATION AND ECONOMIC
DEVELOPMENT PROJECTS WITHIN CHELTENHAM
TOWNSHIP
PROJECT ALLOCATION 15,000,000
(III.2) FRANCONIA SEWER AUTHORITY
(A) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE IMPROVEMENTS,
REDEVELOPMENT AND OTHER RELATED COSTS
20250HB1331PN2389 - 364 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
FOR THE CREATION OF A REGIONAL
WASTEWATER AUTHORITY
PROJECT ALLOCATION 10,000,000
(III.3) BRIDGEPORT BOROUGH
(A) INFRASTRUCTURE, CONSTRUCTION,
REDEVELOPMENT, DEMOLITION AND OTHER
RELATED COSTS FOR CONSTRUCTION OF A
PUBLIC SAFETY ANNEX
PROJECT ALLOCATION 5,000,000
(iv) Conshohocken Borough
(A) Construction, infrastructure and
redevelopment of a borough public
safety building
Project Allocation 5,000,000
(IV.1) HATFIELD BOROUGH
(A) CONSTRUCTION, INFRASTRUCTURE,
ACQUISITION, REDEVELOPMENT AND OTHER
COSTS RELATED TO THE DEVELOPMENT OF
THE HATFIELD TRAIN STATION AND
ADJACENT PARCELS
PROJECT ALLOCATION 5,000,000
(v) Jenkintown Borough
(A) Construction, acquisition,
redevelopment, infrastructure and
other related costs for the Jenkintown
School District to renovate recently
acquired property
Project Allocation 17,000,000
(V.1) LANSDALE BOROUGH
(A) CONSTRUCTION, RENOVATION,
20250HB1331PN2389 - 365 -
<--
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
INFRASTRUCTURE AND OTHER RELATED COSTS
FOR NORTH PENN SCHOOL DISTRICT OAK
PARK ELEMENTARY SCHOOL UPGRADES
PROJECT ALLOCATION 8,320,000
(B) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE IMPROVEMENTS,
REDEVELOPMENT, ABATEMENT OF HAZARDOUS
MATERIALS AND OTHER RELATED COSTS FOR
IMPROVEMENTS TO LANSDALE JEFFERSON
HOSPITAL
PROJECT ALLOCATION 10,000,000
(C) CONSTRUCTION, INFRASTRUCTURE,
ACQUISITION, REDEVELOPMENT AND OTHER
COSTS RELATED TO THE DEVELOPMENT OF
THE FORMER AMERICAN OLEAN TILE FACTORY
SITE
PROJECT ALLOCATION 10,000,000
(D) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE IMPROVEMENTS,
REDEVELOPMENT AND OTHER RELATED COSTS
FOR A PERFORMING ART, FILM AND MUSIC
VENUE INCLUDING HOUSING IN LANSDALE
BOROUGH
PROJECT ALLOCATION 10,000,000
(E) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE IMPROVEMENTS,
REDEVELOPMENT AND OTHER RELATED COSTS
FOR THE REDEVELOPMENT OF THE HILLCREST
SHOPPING CENTER
PROJECT ALLOCATION 5,000,000
20250HB1331PN2389 - 366 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(F) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE IMPROVEMENTS,
REDEVELOPMENT AND OTHER RELATED COSTS
FOR 421 W. MAIN STREET
PROJECT ALLOCATION 5,000,000
(G) CONSTRUCTION, REHABILITATION,
INFRASTRUCTURE, DEMOLITION, SITE
PREPARATION, ENVIRONMENTAL REMEDIATION
AND OTHER RELATED COSTS FOR A FACILITY
EXPANSION AT MITZVAH CIRCLE
PROJECT ALLOCATION 3,000,000
(vi) Norristown Borough
(A) Construction, redevelopment and other
related costs for renovations and
construction of portions of the
historic Centre Theater
Project Allocation 1,000,000
(B) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, MACHINERY, EQUIPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS AND OTHER RELATED COSTS FOR
ECONOMIC DEVELOPMENT OR COMMUNITY
DEVELOPMENT PROJECTS
PROJECT ALLOCATION 15,000,000
(C) CONSTRUCTION, RENOVATION,
INFRASTRUCTURE, SITE PREPARATION,
ENVIRONMENTAL REMEDIATION AND OTHER
RELATED COSTS FOR THE ADAPTIVE REUSE
OF THE HISTORIC AIRY STREET PRISON AND
ADJACENT PARKING LOT
20250HB1331PN2389 - 367 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
PROJECT ALLOCATION 10,000,000
(vii) Pennsburg Borough
(A) Construction, infrastructure and
other related costs for the renovation
and improvement of the Pennsburg
Borough Hall building and the
municipal garage
Project Allocation 976,000
(VII.1) POTTSTOWN BOROUGH
(A) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, EQUIPMENT PURCHASES
AND OTHER RELATED COSTS FOR COMMUNITY
AND ECONOMIC GROWTH INITIATIVES
PROJECT ALLOCATION 5,000,000
(viii) Trappe Borough
(A) Construction, infrastructure,
redevelopment and other related costs
for the construction of a welcome
center and museum collections facility
Project Allocation 3,000,000
(ix) West Conshohocken Borough
(A) Site infrastructure, construction,
renovation and other related costs,
including acquisition, grading,
environmental, site and civil
engineering, architectural design,
mechanical, electrical, plumbing, and
structural engineering, development
fees, storm water, E&S controls,
paving, concrete curbing, concrete
20250HB1331PN2389 - 368 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
sidewalks, site lighting, new water
and sewer lines, new site electric,
electrical substation and
telecommunication infrastructure,
including new fiber lines, building
core and shell infrastructure,
including building structure and
exterior shell, mechanical, electrical
and plumbing systems, elevators and
standby power systems
Project Allocation 60,000,000
(x) Abington Township
(A) Acquisition, construction,
infrastructure, redevelopment,
renovation and other related costs for
improvement projects at Abington
Hospital
Project Allocation 5,000,000
(B) Construction, infrastructure and
other related costs for renovations
and upgrades to the Abington Township
Police Department's training facility
Project Allocation 4,000,000
(xi) Cheltenham Township
(A) Construction, infrastructure
improvements, development and other
related costs for the MossSMART Center
at Einstein Medical Center in Elkins
Park
Project Allocation 5,000,000
20250HB1331PN2389 - 369 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(B) Construction, infrastructure,
rehabilitation, acquisition,
renovation and other related costs for
the Cheltenham Township Administration
Services Building
Project Allocation 2,500,000
(C) Construction and other related costs
for Conklin Pool in Cheltenham
Township
Project Allocation 2,000,000
(D) Construction, renovation,
rehabilitation and other related costs
for the Cheltenham Township Emergency
Medical Services Building
Project Allocation 1,000,000
(E) Construction and other related costs
for the Glenside Community Center
Project Allocation 1,000,000
(F) Construction and other related costs
for Glenside Pool in Cheltenham
Township
Project Allocation 2,000,000
(G) Construction and other related costs
for the Cheltenham Library
Project Allocation 5,000,000
(H) Construction and other related costs
for the Cheltenham Police Department
Project Allocation 2,500,000
(I) Construction and other related costs
for the Cheltenham Public Works
20250HB1331PN2389 - 370 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Facility
Project Allocation 2,000,000
(J) Construction and other related costs
for the Rowland Community Center
Project Allocation 2,500,000
(K) Construction, renovation,
rehabilitation and other related costs
for the LaMott A Fire Company
Project Allocation 2,000,000
PROJECT ALLOCATION 2,500,000
(xii) Douglass Township
(A) Construction, infrastructure,
renovation and/or other costs related
to the Douglas Township Administration
Building renovation project
Project Allocation 1,500,000
(xiii) East Norriton Township
(A) Construction, infrastructure, site
preparation, renovation, environmental
remediation, repair and other related
costs to upgrade and renovate a
firehouse
Project Allocation 10,000,000
(xiv) Franconia Township
(A) Construction, infrastructure,
renovation and/or other costs related
to the Memory Care Household Model at
Peter Becker Community project
Project Allocation 6,250,000
(XIV.1) HATFIELD TOWNSHIP
20250HB1331PN2389 - 371 -
<--
<--
<--
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE IMPROVEMENTS,
REDEVELOPMENT, ABATEMENT OF HAZARDOUS
MATERIALS AND OTHER RELATED COSTS FOR
A NEW HEADQUARTERS FOR VMSC EMERGENCY
MEDICAL SERVICES
PROJECT ALLOCATION 5,000,000
(B) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE IMPROVEMENTS,
REDEVELOPMENT AND OTHER RELATED COSTS
FOR HEADQUARTERS FOR THE TWIN WOODS
PROPERTY
PROJECT ALLOCATION 10,000,000
(xv) Limerick Township
(A) Demolition, site preparation,
construction, infrastructure,
rehabilitation equipment and other
related costs for the expansion of a
Pharmaceutical Product and Technology
Development and Commercial
Manufacturing Center
Project Allocation 10,000,000
(xvi) Lower Frederick Township
(A) Construction, infrastructure, site
preparation, renovation, environmental
remediation, repair and other related
costs to upgrade and renovate the
Lower Frederick Fire Company building
Project Allocation 5,000,000
(xvii) Lower Gwynedd Township
20250HB1331PN2389 - 372 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) Construction, infrastructure,
abatement of hazardous materials,
renovations, rehabilitation and other
related costs for Gwynedd Mercy
University's campus
Project Allocation 12,500,000
(B) Construction, infrastructure,
acquisition and other related costs
for an economic development project
Project Allocation 14,000,000
(xviii) Lower Merion Township
(A) Construction, infrastructure, site
preparation, improvements,
renovations, upgrades, environmental
remediation, repairs and other related
costs for the redevelopment of
Rosemont College
Project Allocation 10,000,000
(B) Construction, infrastructure and
redevelopment of the Merion Mercy
Academy
Project Allocation 10,000,000
(C) ACQUISITION, SITE PREPARATION,
CONSTRUCTION, REHABILITATION,
INFRASTRUCTURE AND/OR RENOVATION
ACTIVITIES RELATED TO THE IMPROVEMENT
AND/OR EXPANSION OF FACILITIES AT
SAINT JOSEPH'S UNIVERSITY
PROJECT ALLOCATION 10,000,000
(D) CONSTRUCTION, INFRASTRUCTURE,
20250HB1331PN2389 - 373 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
ABATEMENT OF HAZARDOUS MATERIALS,
REDEVELOPMENT, RENOVATION,
REHABILITATION AND OTHER RELATED COSTS
FOR PUBLIC WORKS AND EMERGENCY SERVICE
OPERATIONAL UPGRADES
PROJECT ALLOCATION 10,000,000
(xix) Lower Moreland Township
(A) Infrastructure, construction and
other related costs for the
construction of a new fire station for
the Fetters Mill Fire Rescue
Project Allocation 10,000,000
(xx) Lower Providence Township
(A) Construction, infrastructure, site
preparation, renovation, environmental
remediation, repair and other related
costs to support improvements and
upgrades for the Arc Alliance
Project Allocation 1,000,000
(XX.1) MONTGOMERY TOWNSHIP
(A) CONSTRUCTION, INFRASTRUCTURE,
RENOVATION, REHABILITATION AND OTHER
RELATED COSTS FOR UPGRADES TO THE
MONTGOMERY TOWNSHIP FIRE HOUSE
PROJECT ALLOCATION 1,500,000
(B) CONSTRUCTION, RENOVATION,
REHABILITATION AND OTHER RELATED COSTS
FOR RENOVATION OF A HISTORIC FARMHOUSE
AT WINDLESTRAE PARK
PROJECT ALLOCATION 500,000
20250HB1331PN2389 - 374 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(C) CONSTRUCTION AND OTHER RELATED COSTS
FOR A BANDSHELL IN MONTGOMERY TOWNSHIP
PROJECT ALLOCATION 500,000
(D) CONSTRUCTION, RENOVATION,
REHABILITATION AND OTHER RELATED COSTS
FOR A PUBLIC WORKS BUILDING IN
MONTGOMERY TOWNSHIP
PROJECT ALLOCATION 500,000
(E) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE IMPROVEMENTS,
REDEVELOPMENT AND OTHER RELATED COSTS
FOR REDEVELOPMENT OF THE MONTGOMERY
MALL PROPERTY
PROJECT ALLOCATION 25,000,000
(F) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE IMPROVEMENTS,
REDEVELOPMENT AND OTHER RELATED COSTS
FOR HEADQUARTERS FOR THE MONTGOMERY
TOWNSHIP FIRE SERVICES
PROJECT ALLOCATION 3,000,000
(G) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE IMPROVEMENTS,
REDEVELOPMENT AND OTHER RELATED COSTS
FOR RENOVATION AND/OR CONSTRUCTION OF
A PUBLIC WORKS BUILDING
PROJECT ALLOCATION 1,000,000
(XX.2) PLYMOUTH TOWNSHIP
(A) SITE INFRASTRUCTURE, INCLUDING
ACQUISITION, GRADING, ENVIRONMENTAL,
SITE AND CIVIL ENGINEERING,
20250HB1331PN2389 - 375 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
ARCHITECTURAL DESIGN, MECHANICAL,
ELECTRICAL, PLUMBING AND STRUCTURAL
ENGINEERING, DEVELOPMENT FEES,
STORMWATER, E&S CONTROLS, PAVING,
CONCRETE CURBING, CONCRETE SIDEWALKS,
SITE LIGHTING, NEW SITE ELECTRICAL
INFRASTRUCTURE, ELECTRICAL SUBSTATION
AND POWER GENERATION INFRASTRUCTURE,
INCLUDING STANDBY POWER GENERATION FOR
A PROJECT AT INNOVATION 900
PROJECT ALLOCATION 60,000,000
(XX.3) SOUDERTON BOROUGH
(A) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE IMPROVEMENTS,
REDEVELOPMENT AND OTHER RELATED COSTS
FOR HEADQUARTERS FOR THE KEYSTONE
OPPORTUNITY CENTER
PROJECT ALLOCATION 7,000,000
(xxi) Springfield Township
(A) Construction, redevelopment and other
related costs for the Springfield
Township Recreation Center
Project Allocation 10,000,000
(B) CONSTRUCTION, ACQUISITION,
INFRASTRUCTURE, RENOVATIONS AND OTHER
RELATED COSTS FOR MOUNT ST. JOSEPH
ACADEMY CAMPUS IMPROVEMENTS
PROJECT ALLOCATION 3,000,000
(xxii) Towamencin Township
(A) Construction and other related costs
20250HB1331PN2389 - 376 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
for Veterans Memorial Park
Project Allocation 1,250,000
(B) Construction and other related costs
for pickleball courts at Butch Clemens
Park
Project Allocation 500,000
(C) Construction and other related costs
for the Central Drive storm sewer
project
Project Allocation 600,000
(D) Construction, infrastructure,
redevelopment, renovation,
rehabilitation and other related costs
for the Towamencin Fire Company
building improvements
Project Allocation 1,200,000
(E) RENOVATION, REHABILITATION,
CONSTRUCTION AND OTHER RELATED COSTS
FOR UPGRADES TO THE NORTH PENN HIGH
SCHOOL IN THE NORTH PENN SCHOOL
DISTRICT
PROJECT ALLOCATION 130,000,000
(xxiii) Upper Gwynedd Township
(A) Acquisition, construction,
renovation, rehabilitation and related
costs for the Jaisohn Community
Wellness Plaza
Project Allocation 3,000,000
(B) CONSTRUCTION, RENOVATION,
REHABILITATION AND OTHER RELATED COSTS
20250HB1331PN2389 - 377 -
<--
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
FOR NORTH PENN SCHOOL DISTRICT GWYN
NOR ELEMENTARY SCHOOL UPGRADES
PROJECT ALLOCATION 10,781,000
(xxiv) Upper Merion Township
(A) Acquisition, construction,
infrastructure, site preparation,
renovation, environmental remediation,
repair and other related costs to
support the development and
redevelopment of The Discovery Labs
Project Allocation 125,000,000
(B) Construction, infrastructure,
acquisition, redevelopment,
rehabilitation, renovation and other
related costs for properties located
at 411 Swedeland Road
Project Allocation 48,000,000
(C) Construction, infrastructure,
acquisition, redevelopment,
rehabilitation, renovation and other
related costs for properties located
at 3200 Horizon Drive
Project Allocation 18,000,000
(D) Construction, infrastructure,
acquisition, redevelopment,
rehabilitation, renovation and other
related costs for properties located
at 3400 Horizon Drive
Project Allocation 15,000,000
(E) Construction, infrastructure,
20250HB1331PN2389 - 378 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
acquisition, redevelopment,
rehabilitation, renovation and other
related costs for properties located
at 2100 Renaissance Boulevard
Project Allocation 20,000,000
(F) Construction, infrastructure,
acquisition, redevelopment,
rehabilitation, renovation and other
related costs for properties located
at 2501 Renaissance Boulevard
Project Allocation 40,000,000
(G) Construction, infrastructure,
acquisition, redevelopment,
rehabilitation, renovation and other
related costs for properties located
at 2520 Renaissance Boulevard
Project Allocation 6,000,000
(H) Construction, infrastructure,
acquisition, redevelopment,
rehabilitation, renovation and other
related costs for properties located
at 2560 Renaissance Boulevard
Project Allocation 5,000,000
(I) Construction, infrastructure,
acquisition, redevelopment,
rehabilitation, renovation and other
related costs for properties located
on the 600 block of Schuylkill River
Road
Project Allocation 50,000,000
20250HB1331PN2389 - 379 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(J) Construction, infrastructure,
acquisition, redevelopment,
rehabilitation, renovation and other
related costs for properties located
in the 600 Block of Front Street
Project Allocation 60,000,000
(K) Construction, infrastructure,
acquisition, redevelopment,
rehabilitation, renovation and other
related costs for properties located
in the 500 Block of Swedeland Road
Project Allocation 60,000,000
(L) CONSTRUCTION, INFRASTRUCTURE AND
OTHER RELATED COSTS FOR THE
CONSTRUCTION OF A MUNICIPAL OWNED
MULTIPURPOSE STADIUM FACILITY AND
OUTDOOR MUSIC VENUE
PROJECT ALLOCATION 75,000,000
(M) CONSTRUCTION, INFRASTRUCTURE AND
OTHER RELATED COSTS FOR THE KING OF
PRUSSIA MULTIMODAL TRAIN NETWORK
PROJECT ALLOCATION 6,500,000
(N) CONSTRUCTION, INFRASTRUCTURE,
DEMOLITION, REHABILITATION AND OTHER
RELATED COSTS FOR RENOVATIONS AT THE
MAURICE STEPHENS HOUSE
PROJECT ALLOCATION 2,000,000
(xxv) Upper Dublin Township
(A) Construction, infrastructure,
redevelopment and other related costs
20250HB1331PN2389 - 380 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
for upgrades to Fairwold Academy
Project Allocation 2,500,000
(XXV.1) UPPER MORELAND TOWNSHIP
(A) ACQUISITION, CONSTRUCTION,
RECONSTRUCTION, REHABILITATION,
ENVIRONMENTAL AND/OR HAZARDOUS
ASSESSMENT AND REMEDIATION, SITE
PREPARATION, INFRASTRUCTURE
IMPROVEMENTS, INCLUDING IMPROVEMENTS
RELATED TO ENERGY, TRANSPORTATION,
PARKING, UTILITIES, STORM WATER
MANAGEMENT AND COMMON AREAS, AND ALL
OTHER RELATED COSTS FOR THE
CONSTRUCTION, RENOVATION,
REHABILITATION, REDEVELOPMENT,
EXPANSION AND/OR REUSE OF UPPER
MORELAND TOWNSHIP FACILITY PROJECT FOR
EDUCATIONAL, CULTURAL AND/OR
ADMINISTRATIVE PURPOSES WITHIN
MONTGOMERY COUNTY
PROJECT ALLOCATION 1,000,000
(xxvi) Whitemarsh Township
(A) Construction and infrastructure
improvements related to the Miquon
School's redevelopment and expansion
Project Allocation 5,000,000
(xxvii) Worcester Township
(A) Construction, acquisition,
infrastructure, redevelopment and
other related costs for the renovation
20250HB1331PN2389 - 381 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
and expansion of the Variety, the
Children's Charity of the Delaware
Valley campus
Project Allocation 10,000,000
(47) Montour County
(i) County projects
(A) Construction, acquisition,
infrastructure, redevelopment and
other related costs for economic and
community development projects
Project Allocation 25,000,000
(48) Northampton County
(I) COUNTY PROJECTS
(A) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS, INCLUDING MACHINERY AND
EQUIPMENT, FOR A MULTI-USE ECONOMIC
DEVELOPMENT OR COMMUNITY ASSET PROJECT
IN NORTHAMPTON COUNTY AT THE SITE OF
THE FORMER BETHLEHEM STEEL FACTORY
PROJECT ALLOCATION 30,000,000
(B) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS, INCLUDING MACHINERY AND
EQUIPMENT, FOR A PROJECT FOR PROJECT
OF EASTON
20250HB1331PN2389 - 382 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
PROJECT ALLOCATION 10,000,000
(C) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS, INCLUDING MACHINERY AND
EQUIPMENT, FOR A COMMUNITY CENTER THAT
INCLUDES GYMNASIUM, EDUCATIONAL/HEAD
START SPACE, COUNSELING CENTER, EVENT
CENTER AND JOB TRAINING CENTER
PROJECT ALLOCATION 6,000,000
(D) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS, INCLUDING MACHINERY AND
EQUIPMENT, FOR A MIXED-USE ECONOMIC
DEVELOPMENT PROJECT IN NORTHAMPTON
COUNTY
PROJECT ALLOCATION 10,000,000
(i) (I.1) City of Easton
(A) Construction, acquisition,
infrastructure, redevelopment and
other costs associated with renovating
the 6th Street Fire Station
Project Allocation 3,500,000
(B) Construction, acquisition,
infrastructure, redevelopment and
other costs associated with renovating
the College Hill Fire Station
20250HB1331PN2389 - 383 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 2,000,000
(C) Construction, acquisition,
infrastructure, redevelopment and
other costs associated with renovating
the South Side Fire Station
Project Allocation 2,500,000
(D) Construction, acquisition,
infrastructure, redevelopment and
other costs associated with the
creation of a community center
Project Allocation 4,000,000
(E) Construction, infrastructure,
redevelopment and other related costs
for Shiloh Commons
Project Allocation 5,000,000
(F) Construction, infrastructure,
redevelopment and other related costs
to support a tourism facility
Project Allocation 10,000,000
(G) Land acquisition, construction and
other related costs to develop a full
service community center in the city's
West Ward
Project Allocation 4,000,000
(H) Construction, infrastructure and
other related costs for the Greater
Community Empowerment Center
Project Allocation 5,500,000
(I) Construction, infrastructure and
other related costs for a community
20250HB1331PN2389 - 384 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
center
Project Allocation 4,000,000
(J) ACQUISITION, CONSTRUCTION,
RENOVATION, INFRASTRUCTURE,
REHABILITATION AND OTHER RELATED COSTS
FOR THE CREATION OF A TRAILHEAD PARK
PROJECT ALLOCATION 1,250,000
(K) ACQUISITION, CONSTRUCTION,
RENOVATION, INFRASTRUCTURE,
REHABILITATION AND OTHER RELATED COSTS
FOR THE CREATION OF A BOAT LAUNCH AND
SKATE PARK
PROJECT ALLOCATION 1,250,000
(L) CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, BUILDING MODIFICATIONS,
RENOVATIONS, FIT-OUT, EQUIPMENT AND
OTHER RELATED COSTS TO SUPPORT A
CRITICAL TOURISM FACILITY
PROJECT ALLOCATION 10,000,000
(ii) Wilson Borough
(A) Construction, infrastructure,
renovation, rehabilitation abatement
of hazardous materials and other costs
related to the redevelopment of the
former Dixie Cup Site in Wilson
Borough
Project Allocation 25,000,000
(B) Construction, infrastructure,
abatement of hazardous materials,
acquisition, redevelopment, renovation
20250HB1331PN2389 - 385 -
<--
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
and rehabilitation of the Dixie Cup
Factory Redevelopment and New Life
District
Project Allocation 25,000,000
(III) PALMER TOWNSHIP
(A) CONSTRUCTION, INFRASTRUCTURE,
DEVELOPMENT AND OTHER RELATED COSTS
FOR THE PALMER TOWNSHIP COMMUNITY
POLICE STATION
PROJECT ALLOCATION 16,300,000
(49) Northumberland County (Reserved)
(I) COUNTY PROJECTS
(A) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS, INCLUDING MACHINERY AND
EQUIPMENT, FOR AN ECONOMIC DEVELOPMENT
OR COMMUNITY ASSET PROJECT IN
NORTHUMBERLAND COUNTY
PROJECT ALLOCATION 15,000,000
(B) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS, INCLUDING MACHINERY AND
EQUIPMENT, FOR AN ECONOMIC DEVELOPMENT
PROJECT IN NORTHUMBERLAND COUNTY
PROJECT ALLOCATION 15,000,000
(50) Perry County
20250HB1331PN2389 - 386 -
<--
<--
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(i) County projects
(A) Land acquisition, construction,
infrastructure, development, design,
equipment or other costs related to a
medical facility
Project Allocation 20,000,000
(B) Land acquisition, construction,
infrastructure, development, design,
equipment, redevelopment, renovation
and other costs related to an
emergency services facility
Project Allocation 15,000,000
(C) Land acquisition, construction,
infrastructure, development, design,
equipment and other costs related to a
multiuse municipal building, including
training space and other events
Project Allocation 10,000,000
(D) Land acquisition, construction,
infrastructure, development, design,
equipment and other costs related to a
hotel and conference center
Project Allocation 15,000,000
(E) Land acquisition, construction,
infrastructure, development, design,
equipment or other costs related to a
regional sports, recreational, health
and wellness facility
Project Allocation 15,000,000
(F) Acquisition of land, infrastructure,
20250HB1331PN2389 - 387 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
development, redevelopment of a
building site or building renovation,
design, construction for site
improvements and other related costs
for housing facilities to serve
seniors and/or those of low-to-
moderate income
Project Allocation 20,000,000
(G) Construction, infrastructure,
acquisition and other related
development costs for a new Government
Center
Project Allocation 10,000,000
(H) Acquisition, construction,
infrastructure, redevelopment or other
related costs to improve downtown
public spaces and amenities, assist
land and business owners with facade
and infrastructure, improvements to
redevelop and/or rehabilitate business
in the county's boroughs
Project Allocation 5,000,000
(51) Philadelphia County
(I) COUNTY PROJECTS
(A) ACQUISITION, SITE PREPARATION,
REDEVELOPMENT, RENOVATION,
CONSTRUCTION, INFRASTRUCTURE,
ABATEMENT OF HAZARDOUS MATERIALS AND
OTHER RELATED COSTS FOR THE
DEVELOPMENT OF PENN MEDICINE AND THE
20250HB1331PN2389 - 388 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
UNIVERSITY OF PENNSYLVANIA HEALTH
SYSTEM FACILITIES
PROJECT ALLOCATION 10,000,000
(i) (I.1) Philadelphia Authority for
Industrial Development
(A) Construction, infrastructure,
abatement of hazardous materials,
renovation, rehabilitation and other
related costs for repairs to the First
Unitarian Church of Philadelphia
Project Allocation 10,000,000
(B) CONSTRUCTION, INFRASTRUCTURE,
RENOVATION, REHABILITATION AND OTHER
RELATED COSTS FOR THE SAINT MARK'S
CHURCH MASTER PLAN HISTORIC
PRESERVATION
PROJECT ALLOCATION 10,000,000
(I.2) PHILADELPHIA INDUSTRIAL DEVELOPMENT
CORPORATION
(A) CONSTRUCTION, INFRASTRUCTURE
IMPROVEMENTS, ACQUISITION, ABATEMENT
AND OTHER RELATED COSTS FOR A HOTEL
PROJECT ADJACENT TO THE STADIUM
DISTRICT
PROJECT ALLOCATION 10,000,000
(B) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, REDEVELOPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS, MACHINERY AND EQUIPMENT AND
OTHER RELATED COSTS FOR THE
20250HB1331PN2389 - 389 -
<--
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
PENNSYLVANIA SCHOOL FOR THE DEAF
PROJECT ALLOCATION 5,000,000
(C) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, REDEVELOPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS AND OTHER RELATED COSTS FOR
A DOMESTIC VIOLENCE SAFE HAVEN
PROJECT ALLOCATION 20,000,000
(D) RENOVATION, REHABILITATION,
CONSTRUCTION AND OTHER RELATED COSTS
TO REVITALIZE BUILDINGS AND GROUNDS ON
THE PROPERTY SITE OF PENN ALEXANDER
SCHOOL
PROJECT ALLOCATION 5,000,000
(E) CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
OF HAZARDOUS MATERIALS, MACHINERY AND
EQUIPMENT AND OTHER RELATED COSTS FOR
A BEHAVIORAL HEALTH HOSPITAL IN THE
CITY OF PHILADELPHIA
PROJECT ALLOCATION 3,000,000
(ii) City of Philadelphia
(A) Construction, infrastructure, site
preparation, renovation, environmental
remediation, repair and other related
costs for America250PA preparation
Project Allocation 20,000,000
(B) Construction, infrastructure,
renovations and other related costs
for the Avenue of the Arts, Inc., to
20250HB1331PN2389 - 390 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
maintain, expand, repair and enhance
South Broad Street in Philadelphia
Project Allocation 50,000,000
(C) Construction, infrastructure, site
preparation, improvements,
renovations, upgrades, environmental
remediation, repairs and other related
costs for the development of AHARI's
Veterans Village housing project
Project Allocation 4,000,000
(D) Demolition, acquisition,
construction, infrastructure and other
costs for Liddonfield revitalization,
renovation and rehabilitation project
Project Allocation 35,000,000
(E) Acquisition, construction,
redevelopment and infrastructure
related to One River marina
Project Allocation 10,000,000
(F) Redevelopment, infrastructure and
other related costs for renovation of
Russo Park in the City of Philadelphia
Project Allocation 4,100,000
(G) Construction, infrastructure,
acquisition, redevelopment and other
related costs for capital improvements
and renovations to the St. Hubert High
School buildings and campus at the
Northeast Philadelphia campus
Project Allocation 10,000,000
20250HB1331PN2389 - 391 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(H) Construction, infrastructure,
redevelopment and other related costs
at FDR Park in South Philadelphia
Project Allocation 20,000,000
(I) Construction, infrastructure,
redevelopment and other related costs
at West Fairmount Park in West
Philadelphia
Project Allocation 8,000,000
(J) Construction, infrastructure,
redevelopment and other related costs
at the R.W. Brown Boys & Girls Club in
North Central Philadelphia
Project Allocation 10,000,000
(K) Construction, infrastructure,
acquisition, redevelopment and other
related costs for capital improvements
and renovations to the Paul Robeson
House and Museum
Project Allocation 1,500,000
(L) Construction, infrastructure and
related costs for improvements to Lee
Cultural Center
Project Allocation 7,000,000
(M) Construction, infrastructure and
other related costs for recreation
center and playground improvements in
Philadelphia
Project Allocation 11,500,000
(N) Acquisition, construction,
20250HB1331PN2389 - 392 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
infrastructure, renovations and other
related costs for Rhoads Industries
industrial and manufacturing center at
the Navy Yard
Project Allocation 50,000,000
(O) Acquisition, construction,
infrastructure, renovations and other
related costs for the Woodmere Art
Museum restoration and expansion of
the Frances M. Maguire Hall
Project Allocation 10,000,000
(P) Construction, infrastructure, site
preparation and other related costs to
support the development of The African
American Museum in Philadelphia
Project Allocation 50,000,000
(Q) Design, demolition, abatement of
hazardous materials, construction,
infrastructure upgrades, sidewalk and
streetscape improvements and other
related costs within an area bounded
by 23rd Street, Market Street,
Chestnut Street and previously vacated
24th Street in Philadelphia
Project Allocation 20,000,000
(R) Design, demolition and deconstruction
of decommissioned equipment, abatement
of hazardous materials, extensions or
upgrading of utilities, site grading,
storm water management, construction
20250HB1331PN2389 - 393 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
of new space, renovation of existing
space, infrastructure upgrades,
installation of electric boilers,
installation of an industrial scale
heat pump complex and other related
costs within an area bounded by:
39.942855, -75.190676; 39.9443160,
-75.190155; 39.942541, -75.186930;
39.941051, -75.186806
Project Allocation 15,000,000
(S) Design, demolition, abatement of
hazardous materials, construction,
infrastructure and other related costs
within an area bounded by D Street, E.
Luzerne Street, E. Erie Ave, and I
Street in Philadelphia
Project Allocation 15,000,000
(T) Modernization, construction,
rehabilitation site work and other
related costs for the retrofit,
adaption of and improvements to the
Inglis House Campus located at 2600
Belmont Avenue
Project Allocation 20,000,000
(U) Construction, acquisition,
infrastructure and redevelopment for
the Cottman/Edmund Revitalization
Project
Project Allocation 2,750,000
(V) Construction, infrastructure and
20250HB1331PN2389 - 394 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
related costs for renovations to the
Lawncrest Recreation Center
Project Allocation 3,500,000
(W) Construction, acquisition,
infrastructure, redevelopment and
other costs associated with Hispanic
North Philadelphia community
improvements and institutional growth
Project Allocation 10,000,000
(X) Construction, infrastructure and
other related costs to build the
Philadelphia Museum of Sports in the
Philadelphia Sports Complex
Project Allocation 5,000,000
(Y) Construction, infrastructure,
redevelopment and other related costs
for renovations the Weitzman Museum on
Independence Mall
Project Allocation 10,000,000
(Z) Construction, infrastructure,
redevelopment and other related costs
for the restoration of the Cobbs Creek
Golf Course and surrounding areas
Project Allocation 25,000,000
(AA) Dredging and improvements of the
ponds at Franklin Delano Roosevelt
Park in the City of Philadelphia
Project Allocation 3,000,000
(BB) Acquisition, demolition, site
preparation, renovation, construction,
20250HB1331PN2389 - 395 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
remediation, infrastructure and/or
other associated costs to support
Moore College's campus and facilities
Project Allocation 10,000,000
(CC) Renovation, rehabilitation and other
related costs for redevelopment at the
National Constitution Center
Project Allocation 10,000,000
(DD) Construction, infrastructure,
redevelopment and other related costs
for Walnut Park Plaza
Project Allocation 3,000,000
(EE) Construction, infrastructure,
redevelopment and other related costs
for the expansion of Cornerstone
Christian Academy
Project Allocation 5,000,000
(FF) Construction, infrastructure and
other related costs for improvements
in the University City neighborhood
Project Allocation 30,000,000
(GG) Construction, acquisition, abatement
of hazardous materials and related
costs for the Mummer's Museum
Project Allocation 2,500,000
(HH) Land acquisition, site preparation,
demolition, construction,
infrastructure, redevelopment and
other related costs for Thomas
Jefferson University
20250HB1331PN2389 - 396 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 30,000,000
(II) Acquisition, abatement,
infrastructure, construction,
renovation and other related costs for
the expansion of Thomas Jefferson
University Hospital post-anesthesia
care units
Project Allocation 4,000,000
(JJ) Acquisition, demolition, renovation,
construction and other related costs
for Thomas Jefferson University
Hospital facilities
Project Allocation 50,000,000
(KK) Acquisition, construction,
infrastructure improvements,
redevelopment, renovation and related
project costs at Temple University
domestic campuses
Project Allocation 50,000,000
(LL) Construction, abatement of hazardous
materials, redevelopment, renovation,
rehabilitation, acquisition,
infrastructure and other related costs
for the Philadelphia Youth Orchestra
Music Institute
Project Allocation 10,000,000
(MM) Construction, renovation,
infrastructure and other related costs
for the Broad Street Love Building
rehabilitation project
20250HB1331PN2389 - 397 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 10,000,000
(NN) Construction, acquisition,
infrastructure, redevelopment and
other related costs for the Community
College of Philadelphia capital
facilities plan
Project Allocation 25,000,000
(OO) Construction, infrastructure,
redevelopment and other related costs
for the Forman Arts Initiative
community complex
Project Allocation 20,000,000
(PP) Construction, redevelopment and
other related costs for the Barnes
Foundation facility improvements
Project Allocation 10,000,000
(QQ) Construction, infrastructure,
redevelopment and other related costs
for capital needs at the Philadelphia
Zoo
Project Allocation 15,000,000
(RR) Construction, infrastructure,
redevelopment and other related costs
for the buildout of the University
City Science Center campus
Project Allocation 20,000,000
(SS) Construction, infrastructure,
redevelopment and other related costs
for redevelopment of the PHMC Public
Health Campus on Cedar
20250HB1331PN2389 - 398 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 40,000,000
(TT) Construction, acquisition,
infrastructure, redevelopment and
other related costs for the Wharton
Piers waterfront development project
Project Allocation 25,000,000
(UU) Construction, site preparation,
expansion, infrastructure and other
related costs for renovation of an
apprenticeship school campus or
academic facility located in the
northeast section of Philadelphia
containing zip code 19154 or 19114
Project Allocation 10,000,000
(VV) Construction, site preparation,
expansion, infrastructure and other
related costs for construction of a
high school academic facility located
in the northeast section of
Philadelphia containing zip codes
19114, 19136, 19152 and/or 19154
Project Allocation 5,000,000
(WW) Construction, site preparation,
expansion, infrastructure and other
related costs for construction of a
facility located in the northeast
section of Philadelphia containing zip
codes 19114 and/or 19154
Project Allocation 10,000,000
(XX) Acquisition, construction,
20250HB1331PN2389 - 399 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
rehabilitation, renovation,
environmental and hazardous assessment
remediation and other related costs
for the development of industrial
warehouse facilities located in the
northeast section of Philadelphia
containing zip codes 19114 and/or
19154
Project Allocation 10,000,000
(YY) Infrastructure and other related
costs for upgrades at Reading Terminal
Market
Project Allocation 5,000,000
(ZZ) ACQUISITION, SITE PREPARATION,
RENOVATION, CONSTRUCTION AND
INFRASTRUCTURE COSTS FOR ECONOMIC
DEVELOPMENT PROJECTS IN THE CITY OF
PHILADELPHIA
PROJECT ALLOCATION 500,000,000
(AAA) CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION,
REHABILITATION, ABATEMENT OF HAZARDOUS
MATERIALS AND OTHER RELATED COSTS FOR
IMPROVEMENTS TO THE ATTIC YOUTH CENTER
PROJECT ALLOCATION 5,000,000
(BBB) ACQUISITION, INFRASTRUCTURE, SITE
PREPARATION, ENVIRONMENTAL
REMEDIATION, CONSTRUCTION, EQUIPMENT
AND OTHER RELATED COSTS FOR AN
IMPROVEMENT PROJECT AT A RECOVERY HIGH
20250HB1331PN2389 - 400 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
SCHOOL
PROJECT ALLOCATION 10,000,000
(CCC) CONSTRUCTION, INFRASTRUCTURE,
RENOVATION, REHABILITATION AND OTHER
RELATED COSTS FOR THE REDEVELOPMENT OF
THE OUTDOOR CAMPUS AND THE INTERIOR
BUILDINGS FOR THE WOODMERE ART MUSEUM
RESTORATION AND EXPANSION PROJECT
PROJECT ALLOCATION 5,000,000
(DDD) PLANNING, DESIGN, CONSTRUCTION,
INFRASTRUCTURE, RENOVATION,
REHABILITATION AND OTHER RELATED COSTS
FOR THE REDEVELOPMENT OF BUILDINGS AND
OUTDOOR FACILITIES AT THE SCHUYLKILL
CENTER FOR ENVIRONMENTAL EDUCATION,
RESTORATION AND EXPANSION PROJECT
PROJECT ALLOCATION 6,000,000
(EEE) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, RENOVATIONS AND OTHER
RELATED COSTS FOR RHOADS INDUSTRIES
INDUSTRIAL MANUFACTURING CENTER AT THE
NAVY YARD
PROJECT ALLOCATION 15,000,000
(FFF) CONSTRUCTION, INFRASTRUCTURE AND
OTHER RELATED COSTS TO THE SMITH
MEMORIAL PLAYGROUND AND PLAYHOUSE IN
FAIRMOUNT PARK
PROJECT ALLOCATION 4,000,000
(GGG) ACQUISITION, INFRASTRUCTURE,
RENOVATIONS, REHABILITATION,
20250HB1331PN2389 - 401 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
CONSTRUCTION AND OTHER RELATED COSTS
FOR PROJECTS AT THE SEDGWICK THEATER
PROJECT ALLOCATION 4,000,000
(HHH) CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, ABATEMENT OF HAZARDOUS
MATERIALS AND OTHER RELATED COSTS FOR
CAPITAL IMPROVEMENTS AND RENOVATIONS
TO THE SELF HELP MOVEMENT, INC
BUILDINGS AND CAMPUS
PROJECT ALLOCATION 5,000,000
(III) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS, INCLUDING MACHINERY AND
EQUIPMENT, FOR A PROJECT FOR REUSE OF
BUILDINGS ON A FORMER HOSPITAL AND
HOSPITAL CAMPUS
PROJECT ALLOCATION 30,000,000
(JJJ) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS, INCLUDING MACHINERY AND
EQUIPMENT, FOR A PROJECT AT THE 800
BLOCK OF GIRARD AVENUE
PROJECT ALLOCATION 10,000,000
(KKK) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
20250HB1331PN2389 - 402 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS, INCLUDING MACHINERY AND
EQUIPMENT, FOR A PROJECT FOR
SETTLEMENT MUSIC SCHOOL
PROJECT ALLOCATION 5,000,000
(LLL) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS, INCLUDING MACHINERY AND
EQUIPMENT, FOR A PROJECT AT THE BETSY
ROSS HOUSE IN CONJUNCTION WITH
HISTORIC PHILADELPHIA, INC.
PROJECT ALLOCATION 2,000,000
(MMM) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS, INCLUDING MACHINERY AND
EQUIPMENT, FOR ANY TEMPLE HEALTH
PROJECTS WITHIN PHILADELPHIA COUNTY
PROJECT ALLOCATION 100,000,000
(NNN) ACQUISITION, CONSTRUCTION, SITE
PREPARATION, REHABILITATION,
RENOVATION, ENVIRONMENTAL AND
HAZARDOUS ASSESSMENT AND REMEDIATION,
INFRASTRUCTURE IMPROVEMENTS AND OTHER
RELATED COSTS FOR THE ORGANIZATION,
ADMINISTRATION AND OPERATION OF A
PUBLIC AIR SHOW LOCATED AT THE
20250HB1331PN2389 - 403 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
NORTHEAST PHILADELPHIA AIRPORT, 9800
ASHTON ROAD, PHILADELPHIA, PA 19114
PROJECT ALLOCATION 3,000,000
(OOO) ACQUISITION, CONSTRUCTION,
DEMOLITION, INFRASTRUCTURE, RENOVATION
AND OTHER RELATED COSTS FOR THE
LUTHERAN THEOLOGICAL SEMINARY ON
GERMANTOWN AVENUE IN PHILADELPHIA
PROJECT ALLOCATION 10,000,000
(PPP) PLANNING, DESIGN, CONSTRUCTION,
INFRASTRUCTURE, RENOVATION,
REHABILITATION AND OTHER RELATED COSTS
FOR UPGRADES AND IMPROVEMENTS TO JEVS
HUMAN SERVICES, ORLEANS TECHNICAL
COLLEGE SITE
PROJECT ALLOCATION 4,000,000
(QQQ) PLANNING, DESIGN, CONSTRUCTION,
INFRASTRUCTURE, RENOVATION,
REHABILITATION AND OTHER RELATED COSTS
FOR IMPROVEMENTS TO THE SALVATION ARMY
PHILADELPHIA CENTRAL CORPS SITE AT
3225 REED STREET
PROJECT ALLOCATION 1,000,000
(RRR) PLANNING, DESIGN, CONSTRUCTION,
INFRASTRUCTURE, RENOVATION,
REHABILITATION AND OTHER RELATED COSTS
FOR IMPROVEMENTS TO THE SALVATION ARMY
PHILADELPHIA TABERNACLE SITE AT 3150
N. MASCHER STREET
PROJECT ALLOCATION 1,000,000
20250HB1331PN2389 - 404 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(SSS) ACQUISITION, INFRASTRUCTURE, SITE
PREPARATION, ENVIRONMENTAL
REMEDIATION, CONSTRUCTION, EQUIPMENT
AND RELATED COSTS FOR THE
REVITALIZATION OF THE SHOPPES AT
LASALLE COMMUNITY SHOPPING CENTER
PROJECT ALLOCATION 5,000,000
(TTT) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, REDEVELOPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS, MACHINERY AND EQUIPMENT AND
OTHER RELATED COSTS FOR THE OVERBROOK
SCHOOL FOR THE BLIND
PROJECT ALLOCATION 10,000,000
(UUU) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, REDEVELOPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS, MACHINERY AND EQUIPMENT AND
OTHER RELATED COSTS FOR AN ECONOMIC
DEVELOPMENT PROJECT AT THE
QUARTERMASTER SCIENCE + TECHNOLOGY
PARK
PROJECT ALLOCATION 25,000,000
(VVV) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, REDEVELOPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS, MACHINERY AND EQUIPMENT,
AND OTHER RELATED COSTS AT THE
PHILADELPHIA WHOLESALE PRODUCE MARKET
PROJECT ALLOCATION 20,000,000
20250HB1331PN2389 - 405 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(WWW) ACQUISITION, DESIGN, CONSTRUCTION,
RENOVATION, EXPANSION, MODERNIZATION,
ABATEMENT OF HAZARDOUS MATERIALS,
MACHINERY AND EQUIPMENT FOR PATIENT
CARE FACILITIES AND OTHER RELATED
COSTS FOR KENSINGTON HOSPITAL
PROJECT ALLOCATION 10,000,000
(XXX) ACQUISITION, DESIGN, CONSTRUCTION,
RENOVATION, EXPANSION, MODERNIZATION,
ABATEMENT OF HAZARDOUS MATERIALS,
MACHINERY AND EQUIPMENT FOR PATIENT
CARE FACILITIES AND OTHER RELATED
COSTS FOR THE MAZZONI CENTER
PROJECT ALLOCATION 10,000,000
(YYY) REHABILITATION, RENOVATION,
CONSTRUCTION, INFRASTRUCTURE,
ABATEMENT AND OTHER COSTS RELATED TO
REDEVELOPMENT OF THE PHILADELPHIA
ORCHESTRA AND KIMMEL CENTER, INC.,
ACADEMY OF MUSIC
PROJECT ALLOCATION 20,000,000
(ZZZ) CONSTRUCTION, INFRASTRUCTURE,
RENOVATION, REHABILITATION, ABATEMENT
OF HAZARDOUS MATERIALS AND OTHER COSTS
RELATED TO FACILITY UPGRADES AT THE
KIMMEL CENTER FOR THE PERFORMING ARTS
PROJECT ALLOCATION 30,000,000
(AAAA) CONSTRUCTION, INFRASTRUCTURE,
RENOVATION, REHABILITATION,
REDEVELOPMENT AND OTHER COSTS FOR AN
20250HB1331PN2389 - 406 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
UPGRADE PROJECT AT THE MILLER THEATER
(FORMERLY MERRIAM THEATER) IMPROVEMENT
PROJECT
PROJECT ALLOCATION 15,000,000
(BBBB) ACQUISITION, DESIGN, CONSTRUCTION,
RENOVATION, EXPANSION, MODERNIZATION,
ABATEMENT OF HAZARDOUS MATERIALS AND
MACHINERY AND EQUIPMENT FOR PATIENT
CARE FACILITIES AND OTHER RELATED
COSTS FOR PHILADELPHIA FIGHT
PROJECT ALLOCATION 10,000,000
(CCCC) DESIGN, DEMOLITION AND
DECONSTRUCTION OF DECOMMISSIONED
EQUIPMENT, ABATEMENT OF HAZARDOUS
MATERIALS, EXTENSIONS OR UPGRADING OF
UTILITIES, SITE GRADING, STORM WATER
MANAGEMENT, CONSTRUCTION OF NEW SPACE,
RENOVATION OF EXISTING SPACE,
INFRASTRUCTURE UPGRADES, INSTALLATION
OF ELECTRIC BOILERS, INSTALLATION OF
AN INDUSTRIAL-SCALE HEAT PUMP COMPLEX
AND OTHER RELATED COSTS, WITHIN AN
AREA BOUNDED BY THE SCHUYLKILL RIVER
TO THE WEST AND THE CROSS STREETS OF
CHRISTIAN STREET, GRAYS FERRY AVENUE,
ELLSWORTH STREET, SOUTH 26TH STREET,
AND SOUTH 28TH STREET, INCLUDING
ADJACENT LOTS
PROJECT ALLOCATION 10,000,000
(DDDD) ACQUISITION, CONSTRUCTION,
20250HB1331PN2389 - 407 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
INFRASTRUCTURE, MACHINERY, EQUIPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS AND OTHER RELATED COSTS FOR
GIRARD COLLEGE FACILITIES
PROJECT ALLOCATION 20,000,000
(EEEE) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, MACHINERY, EQUIPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS AND OTHER RELATED COSTS FOR
WALNUT STREET THEATRE FACILITIES
PROJECT ALLOCATION 20,000,000
(FFFF) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, REDEVELOPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS AND OTHER RELATED COSTS FOR
A DOMESTIC VIOLENCE SAFE HAVEN
PROJECT ALLOCATION 10,000,000
(GGGG) CONSTRUCTION, RENOVATION,
REHABILITATION AND OTHER RELATED COSTS
FOR SAFETY UPGRADES AND RENOVATIONS AT
A COURT FACILITY
PROJECT ALLOCATION 2,500,000
(HHHH) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, RENOVATION, EQUIPMENT,
REHABILITATION, DEMOLITION AND OTHER
RELATED COSTS FOR THE PHILADELPHIA
BALLET
PROJECT ALLOCATION 15,000,000
(IIII) CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT AND OTHER ASSOCIATED
20250HB1331PN2389 - 408 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
COSTS FOR THE WILLIAM WAY LGBT
COMMUNITY CENTER
PROJECT ALLOCATION 25,000,000
(JJJJ) DESIGN, DEMOLITION, ABATEMENT OF
HAZARDOUS MATERIALS, EXTENSIONS OR
UPGRADING OF UTILITIES, SITE GRADING,
CONSTRUCTION OF NEW SPACE, FACADE
PRESERVATION, FIT-OUT OF EXISTING
SPACE, INFRASTRUCTURE UPGRADES,
MANUFACTURING EXPANSION CAPACITY AND
OTHER RELATED COSTS, WITHIN AN AREA
BOUNDED BY D STREET, EAST ERIE AVENUE,
EAST LUZERNE STREET AND I STREET,
INCLUDING ADJACENT LOTS, IN THE CITY
OF PHILADELPHIA
PROJECT ALLOCATION 20,000,000
(KKKK) DEMOLITION, ABATEMENT OF HAZARDOUS
MATERIALS, ENVIRONMENTAL REMEDIATION,
OFFSITE INFRASTRUCTURE UPGRADES,
ONSITE UTILITY UPGRADES, DESIGN, SITE
GRADING, CONSTRUCTION OF NEW SPACE AND
RELATED COSTS, WITHIN AN AREA BOUNDED
BY TORRESDALE AVENUE, RHAWN STREET,
ASHBURNER STREET AND I-95, INCLUDING
ADJACENT LOTS, WITHIN THE CITY OF
PHILADELPHIA
PROJECT ALLOCATION 11,000,000
(LLLL) DESIGN, SITE GRADING, STORM WATER
MANAGEMENT, LANDSCAPING, EXTENSIONS
AND UPGRADING OF UTILITIES ON AND OFF
20250HB1331PN2389 - 409 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
SITE, CURBING, TRAFFIC SIGNALS, ROAD
WIDENING, PAVING, INFRASTRUCTURE
UPGRADE ON AND OFF SITE AND OTHER
RELATED COSTS, WITHIN AN AREA BOUNDED
BY SOUTHAMPTON ROAD, ROOSEVELT
BOULEVARD, SUNFLOWER DRIVE AND
PAQUESSING CREEK, INCLUDING ADJACENT
LOTS, WITHIN THE CITY OF PHILADELPHIA
PROJECT ALLOCATION 4,000,000
(MMMM) CONSTRUCTION, RENOVATION,
REHABILITATION AND OTHER RELATED COSTS
FOR UPGRADES AT THE DA VINCI ART
ALLIANCE
PROJECT ALLOCATION 1,250,000
(NNNN) CONSTRUCTION, INFRASTRUCTURE, SITE
IMPROVEMENTS, RENOVATION,
REHABILITATION AND OTHER RELATED COSTS
FOR THE SEDGLEY CHILDREN ZONE
PROJECT ALLOCATION 8,300,000
(OOOO) CONSTRUCTION, INFRASTRUCTURE, SITE
IMPROVEMENTS, RENOVATION,
REHABILITATION AND OTHER RELATED COSTS
FOR A MINORITY SMALL BUSINESS
INCUBATOR
PROJECT ALLOCATION 4,000,000
(PPPP) ACQUISITION, SITE PREPARATION,
CONSTRUCTION, RENOVATION,
REDEVELOPMENT, INFRASTRUCTURE
IMPROVEMENTS, REMEDIATION AND OTHER
COSTS FOR THE BARTRAM'S GARDEN CAMPUS
20250HB1331PN2389 - 410 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
IMPROVEMENT PROJECT
PROJECT ALLOCATION 15,000,000
(QQQQ) CONSTRUCTION, INFRASTRUCTURE,
REHABILITATION AND OTHER RELATED COSTS
FOR A MIXED-USE DEVELOPMENT, INCLUDING
HOUSING, RETAIL, CHILDCARE SERVICES
AND A COMMUNITY EDUCATION CENTER
PROJECT ALLOCATION 10,000,000
(RRRR) CONSTRUCTION, REHABILITATION AND
OTHER RELATED COSTS FOR THE E.W.
RHODES SCHOOL POOL RENOVATION
PROJECT ALLOCATION 2,000,000
(SSSS) CONSTRUCTION, REHABILITATION AND
OTHER RELATED COSTS FOR THE WORK-TO-
RIDE STABLES
PROJECT ALLOCATION 1,000,000
(TTTT) CONSTRUCTION, REHABILITATION AND
OTHER RELATED COSTS FOR THE SHULER
RECREATION CENTER
PROJECT ALLOCATION 850,000
(UUUU) SITE PREPARATION, ACQUISITION,
INFRASTRUCTURE, DEMOLITION,
REHABILITATION, EXPANSION AND OTHER
RELATED COSTS FOR THE ENHANCEMENT AND
BUILD OUT OF A WORKFORCE DEVELOPMENT
CENTER ALONG THE NORTH BROAD STREET
CORRIDOR
PROJECT ALLOCATION 10,000,000
(VVVV) CONSTRUCTION, RECONSTRUCTION,
REHABILITATION, RENOVATION,
20250HB1331PN2389 - 411 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
ENVIRONMENTAL AND/OR HAZARDOUS
MATERIAL ASSESSMENT AND REMEDIATION,
INFRASTRUCTURE IMPROVEMENTS, INCLUDING
IMPROVEMENTS RELATED TO ENERGY,
TRANSPORTATION, PARKING AND COMMON
AREAS, AS WELL AS SPECIALIZED BUILDING
AND STRUCTURAL COSTS RELATED TO THE
INTENDED END USE OF ANY NEW STRUCTURES
TO BE LOCATED AT THE SITE OR SITES
WHERE BUILDING 16 IN THE PHILADELPHIA
NAVY YARD WAS ALL OR PARTLY LOCATED
PROJECT ALLOCATION 25,000,000
(WWWW) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS FOR HOUSING PROJECTS AS
PART OF A COMMUNITY REVITALIZATION
PLAN
PROJECT ALLOCATION 200,000,000
(XXXX) CONSTRUCTION, REDEVELOPMENT,
INFRASTRUCTURE AND OTHER RELATED COSTS
FOR OASIS MANOR SENIOR HOUSING
PROJECT ALLOCATION 7,500,000
(YYYY) ACQUISITION, REDEVELOPMENT,
RENOVATION AND OTHER RELATED COSTS FOR
THE EXPANSION OF FOOD PACKING AND
DELIVERY FOR CHARITABLE FOOD
DISTRIBUTION
PROJECT ALLOCATION 3,500,000
20250HB1331PN2389 - 412 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(ZZZZ) INFRASTRUCTURE, RENOVATION,
REHABILITATION, CONSTRUCTION AND OTHER
RELATED COSTS FOR UPGRADES AT MANTUA
HAVERFORD COMMUNITY CENTER
PROJECT ALLOCATION 1,000,000
(A5) CONSTRUCTION, INFRASTRUCTURE,
REHABILITATION AND OTHER RELATED COSTS
FOR THE FRANKFORD AFFORDABLE HOUSING
MIXED-USE PROJECT
PROJECT ALLOCATION 1,000,000
(B5) CONSTRUCTION, INFRASTRUCTURE,
ACQUISITION, REHABILITATION,
RENOVATION AND OTHER ASSOCIATED COSTS
FOR UPGRADES AT THE EASTWICK REC
CENTER
PROJECT ALLOCATION 3,000,000
(C5) CONSTRUCTION, INFRASTRUCTURE,
ACQUISITION, REHABILITATION,
RENOVATION AND OTHER ASSOCIATED COSTS
FOR UPGRADES AT THE MARIAN ANDERSON
REC CENTER
PROJECT ALLOCATION 2,500,000
(D5) DESIGN, DEMOLITION AND
DECONSTRUCTION OF DECOMMISSIONED
EQUIPMENT, ABATEMENT OF HAZARDOUS
MATERIALS, EXTENSIONS OR UPGRADING OF
UTILITIES, SITE GRADING, FACADE
PRESERVATION, FIT-OUT OF EXISTING
SPACE, INFRASTRUCTURE UPGRADES, STORM
WATER MANAGEMENT, CONSTRUCTION OF NEW
20250HB1331PN2389 - 413 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
SPACE AND OTHER RELATED COSTS WITHIN
AN AREA BOUNDED BY MARKET STREET, 23RD
STREET, 24TH STREET AND LUDLOW STREET,
INCLUDING ADJACENT LOTS
PROJECT ALLOCATION 9,000,000
(E5) CONSTRUCTION AND OTHER RELATED COSTS
FOR RENOVATIONS AT BELMONT MANSION
PROJECT ALLOCATION 1,500,000
(F5) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, RENOVATION,
REHABILITATION AND OTHER RELATED COSTS
FOR THE MILL PROJECT
PROJECT ALLOCATION 10,000,000
(G5) CONSTRUCTION, INFRASTRUCTURE,
RENOVATION, REDEVELOPMENT AND OTHER
RELATED COSTS FOR THE CECIL B. MOORE
LIBRARY
PROJECT ALLOCATION 10,000,000
(H5) CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION AND OTHER
ASSOCIATED COSTS FOR THE CREATION OF
COMMUNITY RECREATION SPACE AT PENN
ALEXANDER
PROJECT ALLOCATION 5,000,000
(I5) RENOVATION, REDEVELOPMENT,
CONSTRUCTION AND OTHER RELATED COSTS
FOR UPGRADES TO THE LIGUORI ACADEMY
EDUCATION CENTER
PROJECT ALLOCATION 17,000,000
(J5) RENOVATION, REDEVELOPMENT,
20250HB1331PN2389 - 414 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
CONSTRUCTION AND OTHER RELATED COSTS
FOR THE LIGUORI COMMUNITY INNOVATION
CENTER
PROJECT ALLOCATION 12,000,000
(K5) CONSTRUCTION, INFRASTRUCTURE AND
OTHER RELATED COSTS FOR STRUCTURAL AND
ELECTRICAL UPGRADES AT RIVERSIDE
MATERIALS, INC.
PROJECT ALLOCATION 1,900,000
(L5) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, MACHINERY, EQUIPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS AND OTHER RELATED COSTS FOR
AN OSHUN FAMILY CENTER FACILITY
PROJECT ALLOCATION 5,000,000
(M5) CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, REHABILITATION AND
OTHER RELATED COSTS FOR THE
DEVELOPMENT OF A STUDENT ACTIVITIES
CENTER AT NAZARETH ACADEMY HIGH SCHOOL
PROJECT ALLOCATION 4,000,000
(52) Pike County
(i) County projects
(A) Acquisition, construction,
infrastructure and other related costs
for the Pike County Hospital
Project Allocation 10,000,000
(B) Acquisition, site development,
construction, infrastructure,
redevelopment, equipment and other
20250HB1331PN2389 - 415 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
related costs for a career and
technical center
Project Allocation 15,000,000
(ii) Dingman Township
(A) Site preparation, construction,
infrastructure, redevelopment,
renovation and/or other related costs
for NJY Camps facilities
Project Allocation 5,500,000
(B) Security infrastructure, planning,
construction, equipment and related
costs for NJY Camps
Project Allocation 500,000
(iii) Lackawaxen Township
(A) Construction, site improvement,
infrastructure, environmental
remediation, redevelopment and other
related costs for the For Pete's Sake
cancer respite center at Woodloch
Project Allocation 15,000,000
(53) Potter County
(i) County projects
(A) Acquisition, infrastructure,
construction and other related costs
for a health care facility that will
provide maternal care, including
childbirth services
Project Allocation 10,000,000
(54) Schuylkill County
(i) County projects
20250HB1331PN2389 - 416 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) Acquisition, site preparation,
construction, rehabilitation and
renovation activities related to the
development of an agricultural
community and or economic development
project in Schuylkill County
Project Allocation 15,000,000
(B) Acquisition, design, demolition,
construction, infrastructure,
redevelopment, renovation, abatement
of hazardous materials and other
related costs, including machinery and
equipment, for a project at the
Hazleton Area School District
Project Allocation 10,000,000
(C) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS, INCLUDING MACHINERY AND
EQUIPMENT, FOR A COMMUNITY ASSET
PROJECT IN SCHUYLKILL COUNTY
PROJECT ALLOCATION 15,000,000
(D) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS, INCLUDING MACHINERY AND
EQUIPMENT, FOR AN ECONOMIC DEVELOPMENT
OR COMMUNITY ASSET PROJECT IN
20250HB1331PN2389 - 417 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
SCHUYLKILL COUNTY
PROJECT ALLOCATION 30,000,000
(E) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS, INCLUDING MACHINERY AND
EQUIPMENT, FOR A PROJECT FOR BLUE
MOUNTAIN SCHOOL DISTRICT
PROJECT ALLOCATION 10,000,000
(F) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS, INCLUDING MACHINERY AND
EQUIPMENT, FOR A PROJECT FOR NORTH
SCHUYLKILL SCHOOL DISTRICT
PROJECT ALLOCATION 3,000,000
(G) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS, INCLUDING MACHINERY AND
EQUIPMENT, FOR A PROJECT FOR THE
ORWIGSBURG FIRE DEPARTMENT
PROJECT ALLOCATION 3,000,000
(H) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
OF HAZARDOUS MATERIALS AND OTHER
20250HB1331PN2389 - 418 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
RELATED COSTS, INCLUDING MACHINERY AND
EQUIPMENT, FOR A PROJECT FOR
SHENANDOAH VALLEY SCHOOL DISTRICT
PROJECT ALLOCATION 5,000,000
(ii) CAN DO, Inc.
(A) Acquisition, construction,
infrastructure and other related costs
for the CrossRoads East economic
development project and surrounding
lands in East Union Township
Project Allocation 15,000,000
(iii) Schuylkill County Industrial
Development Authority
(A) Site preparation, acquisition,
renovation, construction,
redevelopment, infrastructure,
abatement of hazardous materials
and/or other associated costs for a
community and/or economic development
project of the former Ashland State
Hospital in Ashland, Schuylkill County
Project Allocation 15,000,000
(B) Site preparation, renovation,
building construction, redevelopment,
infrastructure, abatement of hazardous
materials and/or other associated
costs for a community and/or economic
development project in Highridge
Business Park, Lot 6 in Cass Township
Project Allocation 2,500,000
20250HB1331PN2389 - 419 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(C) Site preparation, renovation,
building construction, redevelopment,
infrastructure, abatement of hazardous
materials and/or other associated
costs for a community and/or economic
development project in Highridge
Business Park, Lot 12 in Foster
Township
Project Allocation 7,500,000
(D) Site preparation, renovation,
construction, redevelopment,
infrastructure, abatement of hazardous
materials and/or other associated
costs for an economic development
project at Keystone Potato Products
facility in Frailey Township
Project Allocation 35,000,000
(E) Site preparation, renovation,
demolition, building construction,
redevelopment, infrastructure,
abatement of hazardous materials
and/or other associated costs for a
community and/or economic development
project in Schuylkill Haven Borough
Project Allocation 7,500,000
(F) Acquisition, construction,
infrastructure, abatement of hazardous
materials, redevelopment, renovation
and/or other associated costs for the
construction and expansion of the
20250HB1331PN2389 - 420 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Kowalonek's Kielbasy Shop
Project Allocation 5,000,000
(G) Site preparation, renovation,
building construction, redevelopment,
infrastructure, abatement of hazardous
materials and/or other associated
costs for a community and/or economic
development project in Frackville
Industrial Park, West Mahanoy and Ryan
Townships, Schuylkill County
Project Allocation 7,500,000
(iv) Hubley Township
(A) Acquisition, site preparation,
construction, rehabilitation and
renovation activities related to the
development of an agricultural
community and or economic development
project in Schuylkill County
Project Allocation 15,000,000
(55) Snyder County (Reserved)
(56) Somerset County (Reserved)
(57) Sullivan County (Reserved)
(58) Susquehanna County (Reserved)
(59) Tioga County (Reserved)
(59) TIOGA COUNTY
(I) GRAND CANYON AIRPORT AUTHORITY
(A) CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION AND OTHER
RELATED COSTS FOR TERMINAL AREA AND
AIRPORT IMPROVEMENTS, INCLUDING SAFETY
20250HB1331PN2389 - 421 -
<--
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
IMPROVEMENTS TO INFRASTRUCTURE AND
DEVELOPMENT FOR NEW OPPORTUNITIES TO
ACCOMMODATE THE GROWING INTEREST IN
AVIATION AT HIGH SCHOOLS
PROJECT ALLOCATION 10,000,000
(60) Union County
(i) County projects
(A) Acquisition, construction,
infrastructure and other related costs
for economic development projects in
the county
Project Allocation 20,000,000
(61) Venango County (Reserved)
(62) Warren County (Reserved)
(63) Washington County
(I) COUNTY PROJECTS
(A) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS, INCLUDING MACHINERY AND
EQUIPMENT, FOR AN ECONOMIC DEVELOPMENT
PROJECT IN WASHINGTON COUNTY
PROJECT ALLOCATION 30,000,000
(B) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS, INCLUDING MACHINERY AND
EQUIPMENT, FOR A COMMUNITY ASSET
20250HB1331PN2389 - 422 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
PROJECT IN WASHINGTON COUNTY
PROJECT ALLOCATION 15,000,000
(i) (II) Redevelopment Authority of the
County of Washington
(A) Acquisition, renovation,
infrastructure, site preparation,
construction, redevelopment, abatement
and other costs associated with
Washington-East Washington Joint
Authority projects in the City of
Washington
Project Allocation 50,000,000
(B) Acquisition, renovation,
infrastructure, site preparation,
construction, redevelopment, abatement
and other costs associated with the
Washington & Jefferson College
Facilities expansion and renovation
and football stadium in the City of
Washington
Project Allocation 30,000,000
(ii) (III) Peters Township
(A) Construction, renovation and other
related costs to rehabilitate the
Peters Lake dam, including armoring
the breastworks of the dam with a
nonerosive treatment to comply with
current regulations
Project Allocation 3,850,000
(B) Acquisition, construction,
20250HB1331PN2389 - 423 -
<--
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
infrastructure, redevelopment,
renovation, abatement of hazardous
materials and/or related costs for a
redevelopment project
Project Allocation 10,000,000
(IV) ROBINSON TOWNSHIP
(A) INFRASTRUCTURE, ABATEMENT OF
HAZARDOUS MATERIALS AND OTHER RELATED
COSTS FOR THE CONSTRUCTION AND
DEVELOPMENT OF A CAMPUS FOR RESCUING
AND TRAINING OF MEDICAL SERVICE DOGS
FOR MILITARY VETERANS, FIRST
RESPONDERS AND CITIZENS WITH
DISABILITIES
PROJECT ALLOCATION 10,000,000
(64) Wayne County
(i) Greater Honesdale Partnership
(A) Construction, infrastructure,
redevelopment and/or other costs
related to improvements to the Main
Street corridor in Honesdale Borough
Project Allocation 5,000,000
(ii) Berlin Township
(A) Construction, infrastructure,
redevelopment and other related costs
for a first responders' training
center
Project Allocation 1,000,000
(iii) Prompton Borough
(A) Construction, renovation,
20250HB1331PN2389 - 424 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
infrastructure, redevelopment and
other related costs for park
improvement
Project Allocation 750,000
(iv) Texas Township
(A) Acquisition, construction,
infrastructure, abatement of hazardous
materials, redevelopment, renovation
and/or other related costs for an
economic development project
Project Allocation 3,000,000
(65) Westmoreland County
(I) COUNTY PROJECTS
(A) CONSTRUCTION, RENOVATION,
INFRASTRUCTURE AND OTHER RELATED
ECONOMIC DEVELOPMENT NEEDS FOR A
CURRENT OR FORMER HIGHER EDUCATION
CAMPUS
PROJECT ALLOCATION 10,000,000
(i) (I.1) Redevelopment Authority of the
County of Westmoreland
(A) Acquisition, construction,
redevelopment, abatement of hazardous
materials and other related costs to
adaptively reuse a building in the
City of Greensburg
Project Allocation 500,000
(ii) Latrobe Industrial Development Authority
(A) Construction, renovation,
redevelopment, infrastructure
20250HB1331PN2389 - 425 -
<--
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
improvements, capital improvements and
related costs for facilities on the
campus of Saint Vincent College in
Latrobe
Project Allocation 10,000,000
(II.1) WESTMORELAND COUNTY INDUSTRIAL
DEVELOPMENT CORPORATION
(A) CONSTRUCTION, INFRASTRUCTURE, SITE
IMPROVEMENTS, ROOF REPLACEMENTS,
POSSIBLE ABATEMENT OF HAZARDOUS
MATERIALS, RENOVATION/REHABILITATION
AND OTHER RELATED COSTS FOR AN
ECONOMIC DEVELOPMENT PROJECT RELATING
TO THE REDEVELOPMENT OF THE FORMER
ALCOA MANUFACTURING FACILITY LOCATED
IN THE CITIES OF ARNOLD AND NEW
KENSINGTON
PROJECT ALLOCATION 20,000,000
(II.2) WESTMORELAND COUNTY REDEVELOPMENT
AUTHORITY
(A) ACQUISITION, CONSTRUCTION,
REDEVELOPMENT, RENOVATION,
REHABILITATION, INFRASTRUCTURE
IMPROVEMENTS AND OTHER RELATED COSTS
FOR A FACILITY TO HOUSE A MEDICAL
SCHOOL FOR THE LAKE ERIE COLLEGE OF
OSTEOPATHIC MEDICINE (LECOM)
PROJECT ALLOCATION 10,000,000
(B) ACQUISITION, INFRASTRUCTURE,
REDEVELOPMENT, CONSTRUCTION AND OTHER
20250HB1331PN2389 - 426 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
RELATED COSTS FOR A HOTEL AND
CONFERENCE FACILITY IN HEMPFIELD
TOWNSHIP
PROJECT ALLOCATION 10,000,000
(II.3) CITY OF GREENSBURG
(A) CONSTRUCTION, RECONSTRUCTION,
RENOVATION, REHABILITATION,
RESTORATION, REPLACEMENT,
PRESERVATION, INSTALLATION AND
IMPROVEMENTS OF NEW AND EXISTING
FACILITIES AT THE WESTMORELAND MUSEUM
OF AMERICAN ART
PROJECT ALLOCATION 12,500,000
(B) ACQUISITION, CONSTRUCTION,
DEMOLITION, RENOVATION,
REHABILITATION, ABATEMENT OF HAZARDOUS
MATERIALS, INFRASTRUCTURE AND OTHER
RELATED COSTS FOR THE SETON HILL
UNIVERSITY CAMPUS.
PROJECT ALLOCATION 25,000,000
(II.4) NEW STANTON BOROUGH
(A) ACQUISITION, RENOVATION,
INFRASTRUCTURE, SITE PREPARATION,
CONSTRUCTION, REDEVELOPMENT, ABATEMENT
AND OTHER COSTS ASSOCIATED WITH THE
CENTRAL WESTMORELAND CAREER AND
TECHNOLOGY CENTER
PROJECT ALLOCATION 20,000,000
(iii) East Huntingdon Township
(A) Redevelopment, construction, site and
20250HB1331PN2389 - 427 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
infrastructure improvements, roof
replacements, renovations,
rehabilitation and other related costs
for an economic development project at
the Westmoreland Innovation facility
Project Allocation 10,000,000
(B) Construction, site and infrastructure
improvements and other related costs
for the development of a state-of-the-
art transportation testing facility at
the Westmoreland Innovation facility
Project Allocation 15,000,000
(iv) Hempfield Township
(A) Acquisition, renovation,
infrastructure, site preparation,
construction, redevelopment, abatement
and other costs associated with the
Hempfield Area School District
expansion and renovation
Project Allocation 30,000,000
(B) Acquisition, renovation,
infrastructure, site preparation,
construction, redevelopment, abatement
and other costs associated with the
Hempfield Township Conference and
Community Center Project
Project Allocation 30,000,000
(v) New Stanton Borough
(A) Acquisition, renovation,
infrastructure, site preparation,
20250HB1331PN2389 - 428 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
construction, redevelopment, abatement
and other costs associated with the
Central Westmoreland Career and
Technology Center
Project Allocation 20,000,000
(C) ACQUISITION, REDEVELOPMENT,
INFRASTRUCTURE IMPROVEMENTS,
CONSTRUCTION AND OTHER RELATED COSTS
FOR DEVELOPMENT OF MODERN SPORT,
CULTURAL AND RECREATIONAL FACILITIES
PROJECT ALLOCATION 11,900,000
(vi) (V) North Huntingdon Township
(A) Acquisition, renovation,
infrastructure, site preparation,
construction, redevelopment, abatement
and other costs associated with the
Norwin School District expansion and
renovation
Project Allocation 30,000,000
(vii) (VI) Penn Township
(A) Acquisition, renovation,
infrastructure, site preparation,
construction, redevelopment, abatement
and other costs associated with the
Penn Township Municipal Complex,
emergency services building and
community center
Project Allocation 20,000,000
(viii) (VII) Rostraver Township
(A) Acquisition, renovation,
20250HB1331PN2389 - 429 -
<--
<--
<--
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
infrastructure, site preparation,
construction, redevelopment, abatement
and other costs associated with the
Rostraver Township expansion and
renovations of facilities, municipal
complex and emergency services
Project Allocation 20,000,000
(ix) (VIII) Unity Township
(A) Acquisition, renovation,
infrastructure, site preparation,
construction, redevelopment, abatement
and other costs associated with the
Unity Township expansion and
renovations of facilities, municipal
complex and emergency services
Project Allocation 15,000,000
(IX) UPPER BURRELL TOWNSHIP
(A) CONSTRUCTION, ACQUISITION,
INFRASTRUCTURE, REDEVELOPMENT,
ABATEMENT OF HAZARDOUS MATERIALS AND
OTHER RELATED COSTS FOR THE EXPANSION
AND IMPROVEMENT OF FACILITIES TO
SUPPORT GROWTH IN PRODUCTION VOLUMES
AND JOBS FOR ARCONIC, INC.
PROJECT ALLOCATION 10,000,000
(66) Wyoming County (Reserved)
(I) COUNTY PROJECTS
(A) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
20250HB1331PN2389 - 430 -
<--
<--
<--
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS, INCLUDING MACHINERY AND
EQUIPMENT, FOR A PROJECT FOR
LACKAWANNA TRAIL SCHOOL DISTRICT
PROJECT ALLOCATION 2,000,000
(B) ACQUISITION, DESIGN, DEMOLITION,
CONSTRUCTION, INFRASTRUCTURE,
REDEVELOPMENT, RENOVATION, ABATEMENT
OF HAZARDOUS MATERIALS AND OTHER
RELATED COSTS, INCLUDING MACHINERY AND
EQUIPMENT, FOR A PROJECT FOR
TUNKHANNOCK AREA SCHOOL DISTRICT
PROJECT ALLOCATION 2,000,000
(67) York County
(I) COUNTY PROJECTS
(A) ACQUISITION, REDEVELOPMENT,
RENOVATION, CONSTRUCTION, ABATEMENT OF
HAZARDOUS MATERIALS AND/OR OTHER
RELATED COSTS FOR THE REDEVELOPMENT
AND/OR HISTORIC PRESERVATION OF
BUILDINGS AND/OR STRUCTURES LOCATED
WITHIN A DOWNTOWN AREA IN ONE OR MORE
OF YORK COUNTY'S BOROUGHS OR THE CITY
OF YORK
PROJECT ALLOCATION 10,000,000
(B) ACQUISITION, REDEVELOPMENT,
RENOVATION, CONSTRUCTION, ABATEMENT OF
HAZARDOUS MATERIALS, MODERNIZATION
AND/OR OTHER RELATED COSTS FOR THE
IMPROVEMENT OF MUNICIPAL BUILDINGS,
20250HB1331PN2389 - 431 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
PARKS AND/OR OTHER MUNICIPAL-OWNED
SITES(S) WITHIN YORK COUNTY
PROJECT ALLOCATION 10,000,000
(C) ACQUISITION, REDEVELOPMENT,
RENOVATION, CONSTRUCTION, ABATEMENT OF
HAZARDOUS MATERIALS AND/OR OTHER
RELATED COSTS FOR NEW DEVELOPMENT OR
REDEVELOPMENT OF AN EXISTING PUBLIC
EDUCATION CENTER TO IMPROVE FACILITIES
AND ENHANCE CAREER AND TECHNICAL
EDUCATION OPPORTUNITIES TO BETTER
IMPROVE THE SKILLED WORKFORCE PIPELINE
IN YORK COUNTY
PROJECT ALLOCATION 5,000,000
(D) ACQUISITION, REDEVELOPMENT,
RENOVATION, CONSTRUCTION, ABATEMENT OF
HAZARDOUS MATERIALS AND/OR OTHER
RELATED COSTS FOR THE MODERNIZATION,
EXPANSION OR CREATION OF NEW OR
EXISTING MANUFACTURING FACILITIES IN
YORK COUNTY
PROJECT ALLOCATION 8,000,000
(E) ACQUISITION, RENOVATION,
CONSTRUCTION, INFRASTRUCTURE,
ABATEMENT OF HAZARDOUS MATERIALS
AND/OR OTHER RELATED COSTS FOR
NONPROFIT REDEVELOPMENT, MODERNIZATION
AND SERVICE ENHANCEMENTS THROUGHOUT
YORK COUNTY
PROJECT ALLOCATION 12,000,000
20250HB1331PN2389 - 432 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(F) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, REDEVELOPMENT,
RENOVATION AND OTHER RELATED COSTS FOR
YORK COUNTY LIBRARY SYSTEM PROJECTS
PROJECT ALLOCATION 10,000,000
(G) A CAPITAL PROJECT WITHIN THE TRAIL
TOWN COMMUNITIES OF YORK CITY, SEVEN
VALLEYS, GLEN ROCK, RAILROAD, NEW
FREEDOM, HANOVER OR WRIGHTSVILLE, THAT
WILL EXPAND THE TRAIL TOWNS ASSET
DEVELOPMENT TO ENHANCE VISITOR
EXPERIENCE, ADAPTIVE REUSE OF A
HISTORIC PROPERTY OR ENHANCED
CONNECTIVITY TO THE HERITAGE RAIL
TRAIL
PROJECT ALLOCATION 8,000,000
(H) SITE PREPARATION, REMEDIATION,
CONSTRUCTION, INFRASTRUCTURE,
RENOVATION AND OTHER RELATED COSTS FOR
THE DEVELOPMENT AND SITE IMPROVEMENTS
FOR A YORK COLLEGE OF PA FACILITY
DEVELOPMENT OR EXPANSION
PROJECT ALLOCATION 8,000,000
(I) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, REDEVELOPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS, MACHINERY, EQUIPMENT AND
OTHER RELATED COSTS FOR AN ECONOMIC
DEVELOPMENT PROJECT AT THE FORMER
METSO MINERALS SITE
20250HB1331PN2389 - 433 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
PROJECT ALLOCATION 10,000,000
(J) ACQUISITION, REDEVELOPMENT,
RENOVATION, CONSTRUCTION,
INFRASTRUCTURE, ABATEMENT OF HAZARDOUS
MATERIALS AND OTHER RELATED COSTS FOR
THE ESTABLISHMENT OR EXPANSION OF A
MANUFACTURING FACILITY
PROJECT ALLOCATION 10,000,000
(K) CONSTRUCTION, RENOVATION,
INFRASTRUCTURE AND OTHER RELATED
ECONOMIC DEVELOPMENT NEEDS FOR A
CURRENT OR FORMER HIGHER EDUCATION
CAMPUS
PROJECT ALLOCATION 10,000,000
(i) (I.1) Susquehanna Area Regional Airport
Authority
(A) Abatement of hazardous materials,
site work, construction, renovations
and other costs associated for
economic development of business and
aviation facilities and infrastructure
at Capital City Airport in Fairview
Township
Project Allocation 2,500,000
(ii) York County Economic Alliance
(A) Acquisition, construction,
infrastructure, redevelopment,
renovation, abatement of hazardous
materials, machinery and equipment and
other related costs for the Steam Into
20250HB1331PN2389 - 434 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
History rail line extension project
Project Allocation 7,500,000
(B) Acquisition, redevelopment,
renovation, construction, abatement of
hazardous materials and other related
costs for the modernization, expansion
or creation of new or existing
manufacturing facilities in York
County
Project Allocation 8,000,000
(C) Acquisition, redevelopment,
renovation, construction, abatement of
hazardous materials and other related
costs for the modernization, expansion
or creation of new or existing
business operations in York County
Project Allocation 8,000,000
(D) Acquisition, redevelopment,
renovation, construction, abatement of
hazardous materials and other related
costs for the restoration and reuse of
a property in Hanover Borough
Project Allocation 20,000,000
(E) Acquisition, redevelopment,
renovation, construction, abatement of
hazardous materials and/or other
related costs for capital improvements
to expand Able Services' ability to
serve individuals with intellectual
disabilities in York County
20250HB1331PN2389 - 435 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 2,000,000
(II.1) CITY OF YORK
(A) ACQUISITION, REDEVELOPMENT,
RENOVATION, CONSTRUCTION, ABATEMENT OF
HAZARDOUS MATERIALS AND/OR OTHER
RELATED COSTS FOR RESTORATION AND
REUSE OF PROPERTY LOCATED WITHIN THE
CITY OF YORK
PROJECT ALLOCATION 10,000,000
(II.2) HANOVER BOROUGH
(A) ACQUISITION, RENOVATION,
REDEVELOPMENT AND ABATEMENT OF
HISTORIC DOWNTOWN PROPERTY FOR
ADAPTIVE REUSE TO COMPLEMENT DOWNTOWN
HANOVER
PROJECT ALLOCATION 10,000,000
(iii) Dover Township
(A) Construction, acquisition, site
improvement, infrastructure,
environmental remediation,
redevelopment and/or other related
costs for a community or economic
development project
Project Allocation 8,000,000
(B) CONSTRUCTION, ACQUISITION, SITE
IMPROVEMENT, INFRASTRUCTURE,
ENVIRONMENTAL REMEDIATION,
REDEVELOPMENT AND OTHER RELATED COSTS
FOR A COMMUNITY OR ECONOMIC
DEVELOPMENT PROJECT IN DOVER TOWNSHIP
20250HB1331PN2389 - 436 -
<--
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
PROJECT ALLOCATION 8,000,000
(iv) Spring Garden Township
(A) Construction, site improvement,
infrastructure, environmental
remediation, redevelopment and other
related costs to construct a new fire
and rescue service station in Spring
Garden Township
Project Allocation 5,000,000
(B) Acquisition, site preparation,
environmental remediation,
construction, rehabilitation and
renovation activities related to the
development of a community and/or
economic development project in Spring
Garden Township
Project Allocation 10,000,000
(V) WEST MANCHESTER TOWNSHIP
(A) ACQUISITION, REDEVELOPMENT,
RENOVATION, CONSTRUCTION, ABATEMENT OF
HAZARDOUS MATERIALS, INSTALLATION OF
NECESSARY MACHINERY AND EQUIPMENT
AND/OR OTHER RELATED COSTS FOR CAPITAL
IMPROVEMENTS TO MAINTAIN OR EXPAND
OPERATIONS AT MAGNESITA REFRACTORIES
COMPANY OPERATIONS IN WEST MANCHESTER
TOWNSHIP
PROJECT ALLOCATION 8,000,000
(68) Multiple counties
(I) ALLEGHENY AND WASHINGTON COUNTIES
20250HB1331PN2389 - 437 -
<--
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) SITE PREPARATION, REMEDIATION,
CONSTRUCTION, INFRASTRUCTURE,
RENOVATIONS, REDEVELOPMENT AND OTHER
RELATED COSTS FOR UPGRADING ALLEGHENY
VALLEY RAILROAD INFRASTRUCTURE
PROJECT ALLOCATION 13,500,000
(i) (I.1) Berks, Chester, Delaware,
Montgomery and Philadelphia Counties
(A) Acquisition, construction,
infrastructure, rehabilitation and
other related costs for renovations or
upgrades to existing Greater
Philadelphia YMCA facilities and new
YMCA facilities
Project Allocation 70,000,000
(I.2) CARBON, LACKAWANNA, LUZERNE, MONROE,
PIKE, SCHUYLKILL AND WAYNE COUNTIES
(A) ACQUISITION, DEMOLITION, SITE
DEVELOPMENT, CONSTRUCTION,
INFRASTRUCTURE, REDEVELOPMENT,
REHABILITATION, MODERNIZATION,
ENERGY UPGRADES, ABATEMENT OF
HAZARDOUS MATERIALS AND OTHER
RELATED COSTS FOR THE NEW
CONSTRUCTION, EXPANSION AND
IMPROVEMENT FOR VALUE-ADDED
BUSINESS, MANUFACTURING, NONPROFIT,
RECREATIONAL, TOURISM RELATED
FACILITIES THAT ARE PART OF THE
NORTHEASTERN PENNSYLVANIA
20250HB1331PN2389 - 438 -
<--
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
ALLIANCE'S COMPREHENSIVE ECONOMIC
DEVELOPMENT STRATEGY
PROJECT ALLOCATION 25,000,000
(ii) Chester and Delaware Counties
(A) Construction, infrastructure,
renovation, rehabilitation and other
related costs for restoration of
passenger rail service and improvement
to tourist and freight trains
Project Allocation 25,000,000
(B) ACQUISITION, DEMOLITION, SITE WORK,
REMEDIATION, RENOVATION, CONSTRUCTION
AND OTHER RELATED COSTS FOR CAPITAL
IMPROVEMENTS AT CHEYNEY UNIVERSITY
PROJECT ALLOCATION 5,000,000
(II.1) CHESTER, DELAWARE, MONTGOMERY AND
PHILADELPHIA COUNTIES
(A) CONSTRUCTION, ACQUISITION,
INFRASTRUCTURE, REDEVELOPMENT AND
OTHER RELATED COSTS FOR A
BIOTRANSFORMER PROJECT TO CONVERT FOOD
WASTE TO ESSENTIAL COMPONENTS OF
PHARMACEUTICALS
PROJECT ALLOCATION 15,000,000
(iii) Pike and Wayne Counties
(A) Acquisition, construction,
demolition, renovations, site
improvements, infrastructure and other
related costs for the development of a
career and technical educational
20250HB1331PN2389 - 439 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
school
Project Allocation 20,000,000
(IV) ADAMS, CUMBERLAND, FRANKLIN, LANCASTER
AND YORK COUNTIES
(A) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, MACHINERY, EQUIPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS AND OTHER RELATED COSTS FOR
FACILITIES TO DELIVER MEDICAL
SERVICES, CONDUCT RESEARCH, PROVIDE
MEDICAL EDUCATION AND OTHER RELATED
ACTIVITIES FOR WELLSPAN HEALTH AND ITS
AFFILIATES
PROJECT ALLOCATION 20,000,000
(V) BERKS, BUCKS, CARBON, LACKAWANNA, LEHIGH,
LUZERNE, MONROE, MONTGOMERY, NORTHAMPTON
AND SCHUYLKILL COUNTIES
(A) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, MACHINERY, EQUIPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS AND OTHER RELATED COSTS FOR
FACILITIES TO DELIVER MEDICAL
SERVICES, CONDUCT RESEARCH, PROVIDE
MEDICAL EDUCATION AND OTHER RELATED
ACTIVITIES FOR JEFFERSON HEALTH LEHIGH
VALLEY HEALTH SYSTEM AND ITS
AFFILIATES
PROJECT ALLOCATION 30,000,000
(VI) CENTRE, COLUMBIA, CUMBERLAND, DAUPHIN,
LACKAWANNA, LUZERNE, MIFFLIN, MONTOUR AND
20250HB1331PN2389 - 440 -
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
NORTHUMBERLAND COUNTIES
(A) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, REDEVELOPMENT AND
OTHER RELATED COSTS FOR FACILITIES TO
DELIVER MEDICAL SERVICES, CONDUCT
RESEARCH, PROVIDE MEDICAL EDUCATION
AND OTHER RELATED ACTIVITIES FOR
GEISINGER HEALTH AND ITS AFFILIATES
PROJECT ALLOCATION 15,000,000
(VII) CENTRE, COLUMBIA, LACKAWANNA, LUZERNE,
LYCOMING, MIFFLIN, MONTOUR,
NORTHUMBERLAND, SCHUYLKILL, SNYDER AND
UNION COUNTIES
(A) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, MACHINERY, EQUIPMENT,
RENOVATION, ABATEMENT OF HAZARDOUS
MATERIALS, AND OTHER RELATED COSTS FOR
FACILITIES TO DELIVER MEDICAL
SERVICES, CONDUCT RESEARCH, PROVIDE
MEDICAL EDUCATION, AND OTHER RELATED
ACTIVITIES FOR GEISINGER AND ITS
AFFILIATES
PROJECT ALLOCATION 20,000,000
(VIII) LEHIGH, NORTHAMPTON AND BUCKS COUNTIES
(A) ACQUISITION, CONSTRUCTION,
INFRASTRUCTURE, REHABILITATION AND
OTHER RELATED COSTS FOR RENOVATIONS OR
UPGRADES TO EXISTING RIVER CROSSING
YMCA FACILITIES AND NEW YMCA
FACILITIES
20250HB1331PN2389 - 441 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
PROJECT ALLOCATION 50,000,000
(IX) PHILADELPHIA AND MONTGOMERY COUNTIES
(A) ACQUISITION, RENOVATION,
INFRASTRUCTURE, CONSTRUCTION,
REDEVELOPMENT AND OTHER COSTS
ASSOCIATED WITH ECONOMIC DEVELOPMENT
PROJECTS NEAR CITY AVENUE AND THE CITY
AVENUE SPECIAL SERVICES DISTRICT
PROJECT ALLOCATION 20,000,000
Section 7. Itemization of flood control projects.
Additional capital projects in the category of flood control
projects to be constructed by the Department of Environmental
Protection, its successors or assigns and to be financed by the
incurring of debt are hereby itemized, together with their
respective estimated costs, as follows:
Project
Total Project
Allocation
(1) Department of Environmental Protection
(i) Core Creek Dam, Bucks County
(A) Rehabilitation project
Project Allocation 3,300,000
(ii) Thatcher Run Dam, Crawford County
(A) Rehabilitation project
Project Allocation 850,000
(iii) Rainbow Dam, Crawford County
(A) Rehabilitation project
Project Allocation 1,000,000
(iv) Kintz Creek Dam, Pike County
(A) Rehabilitation project
Project Allocation 850,000
20250HB1331PN2389 - 442 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(v) Hamilton Dam, Tioga County
(A) Rehabilitation project
Project Allocation 3,900,000
(vi) Flat Rock Dam, Montgomery and
Philadelphia Counties
(A) Dredging of Flat Rock Dam
Project Allocation 100,000,000
(2) (Reserved)
Section 8. Itemization of Pennsylvania Fish and Boat Commission
capital projects.
Capital projects in the category of public improvement
projects to be acquired or developed by the Pennsylvania Fish
and Boat Commission and to be financed by the incurring of debt
or by the current revenues of the Fish Fund and the Boat Fund
pursuant to executive authorizations are hereby itemized,
together with their respective estimated costs, as follows:
Project
Total Project
Allocation
(1) Fish and Boat Commission
(i) Fisheries Area 6 Office, Bucks County
(A) Design, permit, acquire properties
and construct, rehabilitate or replace
an office and storage facility for
fisheries and related operations
Project Allocation
3,000,000
(ii) Bellefonte State Fish Hatchery, Centre
County
(A) Design, permit, acquire properties
and construct fish rearing facilities,
buildings, effluent treatment,
20250HB1331PN2389 - 443 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
influent treatment and related
infrastructure
Project Allocation
5,000,000
(B) Design, permit, acquire properties
and construct, rehabilitate or replace
a pedestrian bridge, including repair
and replacement of amenities and
appurtenances
Project Allocation
1,600,000
(iii) Benner Spring State Fish Hatchery,
Centre County
(A) Design, permit, acquire properties
and construct fish rearing facilities,
buildings, effluent treatment,
influent treatment and related
infrastructure
Project Allocation
5,000,000
(B) Design, permit, acquire properties
and construct, rehabilitate or replace
bridge, including repair and
replacement of amenities and
appurtenances
Project Allocation
3,400,000
(iv) Pleasant Gap State Fish Hatchery, Centre
County
(A) Design, permit, acquire properties
and construct fish rearing facilities,
buildings, effluent treatment,
influent treatment and related
infrastructure
20250HB1331PN2389 - 444 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation
7,500,000
(v) Spring Creek Canyon Trail, Centre County
(A) Design, permit, acquire properties
and construct, rehabilitate or replace
a two-lane bridge, including repair
and replacement of amenities and
appurtenances
Project Allocation
2,800,000
(B) Design, permit, acquire properties
and construct, rehabilitate, remove or
replace a pedestrian bridge, including
repair and replacement of amenities
and appurtenances
Project Allocation
500,000
(C) Design, permit, acquire properties
and construct, rehabilitate or replace
a one-lane bridge, including repair
and replacement of amenities and
appurtenances
Project Allocation
2,200,000
(vi) Kahle Lake, Clarion and Venango Counties
(A) Design, permit, acquire properties
and construct a dam rehabilitation
project, including repair and
replacement of amenities,
appurtenances, ADA accessibility and
sediment removal operations as
necessary
Project Allocation
2,000,000
(vii) Tylersville State Fish Hatchery,
20250HB1331PN2389 - 445 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Clinton County
(A) Design, permit, acquire properties
and construct fish rearing facilities,
buildings, effluent treatment,
influent treatment and related
infrastructure
Project Allocation
8,000,000
(viii) Huntsdale State Fish Hatchery,
Cumberland County
(A) Design, permit, acquire properties
and construct fish rearing facilities,
buildings, effluent treatment,
influent treatment and related
infrastructure
Project Allocation
26,500,000
(B) Design, permit and construct
facilities for the remediation of PCB
contaminated soils and monitor
environmental remediations
Project Allocation
7,500,000
(ix) Lake Erie State Fish Hatchery, Erie
County
(A) Design, permit, acquire properties to
construct fish rearing and research
facilities, buildings, effluent
treatment, influent treatment and
related infrastructure for the
acquisition and development of the
Lake Erie State Fish Hatchery, or for
the expansion and development of
20250HB1331PN2389 - 446 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
another fish rearing facility in Erie
County
Project Allocation
25,000,000
(x) North East Marina, Erie County
(A) Design, permit, acquire properties
and construct new or rehabilitate
existing infrastructure to support a
day use/seasonal public access area
and boat launch
Project Allocation
18,000,000
(xi) Trout Run Steel Head Collection
Facility, Erie County
(A) Design, permit, construct,
rehabilitate or improve fish
collection facilities and related
infrastructure and demolition of
existing in-stream concrete
structures, retaining walls and
related infrastructure
Project Allocation
5,000,000
PROJECT ALLOCATION 7,000,000
(xii) Union City State Fish Hatchery AQUATIC
CONSERVANCY CENTER, Erie County
(A) Design, permit, acquire properties
and construct fish rearing facilities,
buildings, effluent treatment,
influent treatment and related
infrastructure
Project Allocation
2,500,000
PROJECT ALLOCATION 10,000,000
20250HB1331PN2389 - 447 -
<--
<--
<--
<--
<--
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(xiii) Walnut Creek Marina, Erie County
(A) Design, permit, acquire properties
and construct or rehabilitate marina-
related infrastructure to improve slip
capacity, parking and boating and
fishing access
Project Allocation
12,000,000
(xiv) Maintenance Area 1/Fisheries Area 2
Office, Forest County
(A) Design, permit, acquire properties
and construct, rehabilitate or replace
an office and storage facility for
fisheries and related operations
Project Allocation
3,000,000
(xv) Tionesta State Fish Hatchery, Forest
County
(A) Design, permit, acquire properties
and construct fish rearing facilities,
buildings, effluent treatment,
influent treatment and related
infrastructure
Project Allocation
5,000,000
(xvi) Hemlock Lake, Indiana County
(A) Design, permit, acquire properties
and construct a dam rehabilitation
project, including repair and
replacement of amenities,
appurtenances, ADA accessibility and
sediment removal operations as
necessary, at Hemlock Lake
20250HB1331PN2389 - 448 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation
2,000,000
(xvii) Cloe Lake, Jefferson County
(A) Design, permit, acquire properties
and construct a dam rehabilitation
project, including repair and
replacement of amenities,
appurtenances, ADA accessibility and
sediment removal operations as
necessary
Project Allocation
8,500,000
(xviii) Fords Lake, Lackawanna County
(A) Design, permit, acquire properties
and construct a dam rehabilitation
project, including repair and
replacement of amenities,
appurtenances, ADA accessibility and
sediment removal operations as
necessary
Project Allocation
2,000,000
(xix) Harris Pond, Luzerne County
(A) Design, permit, acquire properties
and construct a dam rehabilitation
project, including repair and
replacement of amenities,
appurtenances, ADA accessibility and
sediment removal operations as
necessary
Project Allocation
2,000,000
(xx) Minsi Lake, Northampton County
(A) Design, permit, acquire properties
20250HB1331PN2389 - 449 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
and construct, rehabilitate or replace
a bridge, including repair and
replacement of amenities and
appurtenances
Project Allocation
5,200,000
(xxi) Oswayo State Fish Hatchery, Potter
County
(A) Design, permit, acquire properties
and construct fish rearing facilities,
buildings, effluent treatment,
influent treatment and related
infrastructure
Project Allocation
6,500,000
(xxii) High Point Lake, Somerset County
(A) Design, permit, acquire properties
and construct a dam rehabilitation
project, including repair and
replacement of amenities,
appurtenances, ADA accessibility and
sediment removal operations as
necessary, at High Point Lake
Project Allocation
2,000,000
(xxiii) Hunters Lake, Sullivan County
(A) Design, permit, acquire properties
and construct a dam rehabilitation
project, including repair and
replacement of amenities,
appurtenances, ADA accessibility and
sediment removal operations as
necessary
20250HB1331PN2389 - 450 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation
1,500,000
(xxiv) Fisheries Area 5 Office, Wayne County
(A) Design, permit, acquire properties
and construct, rehabilitate or replace
an office and storage facility for
fisheries and related operations
Project Allocation
3,000,000
(xxv) Miller Pond, Wayne County
(A) Design, permit, acquire properties
and construct a dam rehabilitation
project, including repair and
replacement of amenities,
appurtenances, ADA accessibility and
sediment removal operations as
necessary at Miller Pond
Project Allocation
1,500,000
(xxvi) Pleasant Mount State Fish Hatchery,
Wayne County
(A) Design, permit, acquire properties
and construct fish rearing facilities,
buildings, effluent treatment,
influent treatment and related
infrastructure
Project Allocation
9,500,000
(B) Design, permit, acquire properties
and construct, rehabilitate or replace
bridges, including repair and
replacement of amenities and
appurtenances
Project Allocation
5,600,000
20250HB1331PN2389 - 451 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(C) Design, permit, acquire properties
and construct, rehabilitate or replace
a pedestrian bridge, including repair
and replacement of amenities and
appurtenances
Project Allocation
1,600,000
(xxvii) White Oak Pond, Wayne County
(A) Design, permit, acquire properties
and construct a dam rehabilitation
project, including repair and
replacement of amenities,
appurtenances, ADA accessibility and
sediment removal operations as
necessary at White Oak Pond
Project Allocation
1,500,000
(xxviii) Polk/Sandy Creek bridge removal,
Venango County
(A) Design, permit, acquire properties
and construct, rehabilitate or remove
an abandoned railroad bridge,
including repair and replacement of
amenities and appurtenances
Project Allocation
1,500,000
(2) (Reserved)
Section 9. Debt authorization.
(a) Public improvements.--The Governor, Auditor General and
State Treasurer are hereby authorized and directed to borrow
from time to time in addition to any authorization heretofore or
hereafter enacted, on the credit of the Commonwealth, subject to
the limitations provided in the current capital budget, money
20250HB1331PN2389 - 452 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
not exceeding in the aggregate the sum specified in section
2(a).
(b) Furniture and equipment.--The Governor, Auditor General
and State Treasurer are hereby authorized and directed to borrow
from time to time in addition to any authorization heretofore or
hereafter enacted on the credit of the Commonwealth, subject to
the limitations provided in the current capital budget, money
not exceeding in the aggregate the sum specified in section 2(b)
as may be found necessary to carry out the acquisition and
construction of the public improvement projects consisting of
the acquisition of original movable furniture and equipment
specifically itemized in the capital budget.
(c) Transportation assistance.--The Governor, Auditor
General and State Treasurer are hereby authorized and directed
to borrow from time to time in addition to any authorization
heretofore or hereafter enacted, on the credit of the
Commonwealth, subject to the limitations provided in the current
capital budget, money not exceeding in the aggregate the sum
specified in section 2(c) as may be found necessary to carry out
the acquisition and construction of the transportation
assistance projects specifically itemized in a capital budget.
(d) Redevelopment assistance.--Subject to the limitations in
section 2.1 of the act of May 29, 2020 (P.L.205, No.25), known
as the Capital Budget Act of 2019-2020, the Governor, Auditor
General and State Treasurer are hereby authorized and directed
to borrow from time to time in addition to any authorization
heretofore or hereafter enacted on the credit of the
Commonwealth, subject to the limitations provided in the current
capital budget, money not exceeding in the aggregate the sum
specified in section 2(d) as may be found necessary to carry out
20250HB1331PN2389 - 453 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
the redevelopment assistance capital projects specifically
itemized in the capital budget.
(e) Flood control.--The Governor, Auditor General and State
Treasurer are hereby authorized and directed to borrow from time
to time in addition to any authorization heretofore or hereafter
enacted, on the credit of the Commonwealth, subject to the
limitations provided in the current capital budget, money not
exceeding in the aggregate the sum specified in section 2(e) as
may be found necessary to carry out the acquisition and
construction of the flood control projects specifically itemized
in a capital budget.
(f) Pennsylvania Fish and Boat Commission projects.--The
Governor, Auditor General and State Treasurer are hereby
authorized and directed to borrow from time to time in addition
to any authorization heretofore or hereafter enacted, on the
credit of the Commonwealth, subject to the limitations provided
in the current capital budget, money not exceeding in the
aggregate specified in section 2(f) to carry out the acquisition
and construction of the Pennsylvania Fish and Boat Commission
projects specifically itemized in a capital budget.
Section 10. Issue of bonds.
The indebtedness authorized in this act shall be incurred
from time to time and shall be evidenced by one or more series
of general obligation bonds of the Commonwealth in such
aggregate principal amount for each series as the Governor, the
Auditor General and the State Treasurer shall determine, but the
latest stated maturity date shall not exceed the estimated
useful life of the projects being financed as stated in section
11.
Section 11. Estimated useful life and term of debt.
20250HB1331PN2389 - 454 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(a) Estimated useful life.--The General Assembly states that
the estimated useful life of the capital projects itemized in
this act is as follows:
(1) Public improvement projects, 30 years.
(2) Furniture and equipment, 10 years.
(3) Transportation assistance projects:
(i) Rolling stock, 15 years.
(ii) Passenger buses, 12 years.
(iii) Furniture and equipment, 10 years.
(iv) All others, 30 years.
(4) Redevelopment assistance projects, 30 years.
(b) Term of debt.--The maximum term of the debt authorized
to be incurred under this act is 30 years.
Section 12. Appropriations.
(a) Public improvements.--The net proceeds of the sale of
the obligations authorized in this act are hereby appropriated
from the Capital Facilities Fund to the Department of General
Services in the maximum amount specified in section 2(a) to be
used by it exclusively to defray the financial cost of the
public improvement projects specifically itemized in a capital
budget. After reserving or paying the expenses of the sale of
the obligation, the State Treasurer shall pay to the Department
of General Services the money as required and certified by it to
be legally due and payable.
(b) Furniture and equipment.--The net proceeds of the sale
of the obligations authorized in this act are hereby
appropriated from the Capital Facilities Fund to the Department
of General Services in the maximum amount specified in section
2(b) to be used by it exclusively to defray the financial cost
of the public improvement projects consisting of the acquisition
20250HB1331PN2389 - 455 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
of original movable furniture and equipment specifically
itemized in a capital budget. After reserving or paying the
expenses of the sale of the obligation, the State Treasurer
shall pay to the Department of General Services the money as
required and certified by it to be legally due and payable.
(c) Transportation assistance.--The net proceeds of the sale
of the obligations authorized in this act are hereby
appropriated from the Capital Facilities Fund to the Department
of Transportation in the maximum amount specified in section
2(c) to be used by it exclusively to defray the financial cost
of the transportation assistance projects specifically itemized
in a capital budget. After reserving or paying the expenses of
the sale of the obligation, the State Treasurer shall pay to the
Department of Transportation the money as required and certified
by it to be legally due and payable.
(d) Redevelopment assistance.--The net proceeds of the sale
of the obligations authorized in this act are hereby
appropriated from the Capital Facilities Fund to the Department
of Community and Economic Development in the maximum amount
specified in section 2(d) to be used by it exclusively to defray
the financial cost of the redevelopment assistance capital
projects specifically itemized in a capital budget. After
reserving or paying the expenses of the sale of the obligation,
the State Treasurer shall pay to the Department of Community and
Economic Development the money as required and certified by it
to be legally due and payable.
(e) Flood control.--The net proceeds of the sale of the
obligations authorized in this act are hereby appropriated from
the Capital Facilities Fund to the Department of Environmental
Protection in the maximum amount specified in section 2(e) to be
20250HB1331PN2389 - 456 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
used by it exclusively to defray the financial cost of the flood
control projects specifically itemized in a capital budget.
After reserving or paying the expenses of the sale of the
obligation, the State Treasurer shall pay to the Department of
Environmental Protection the money as required and certified by
it to be legally due and payable.
Section 13. Federal funds.
(a) Projects itemized in this act.--All money received from
the Federal Government for the projects specifically itemized in
this act are also hereby appropriated for those projects.
(b) Projects not requiring itemization.--Department of
Military and Veterans Affairs construction projects which are
totally federally funded and to be administered by the
Department of General Services are hereby authorized.
Section 14. Editorial changes.
In editing and preparing this act for printing following the
final enactment, the Legislative Reference Bureau shall insert
or revise letters or numbers for projects where the letters or
numbers are missing or require revision. The Legislative
Reference Bureau shall also revise the total monetary amounts
for the total authorization, debt authorization, appropriations
and department totals as necessary to agree with the total
monetary amounts of the projects.
Section 15. Delegation.
Notwithstanding any provision of law to the contrary, the
Department of General Services may delegate the design and
construction of the projects contained in:
(1) Section 3(1)(i) of this act to The Pennsylvania
State University.
(2) Section 3(1)(iii) of this act to the University of
20250HB1331PN2389 - 457 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Pennsylvania.
(3) Section 3(a)(1)(ii)(B) of the act of November 1,
2013 (P.L.680, No.85), known as the Capital Budget Project
Itemization Act of 2013-2014, to the University of
Pennsylvania.
Section 16. Effective date.
This act shall take effect immediately.
20250HB1331PN2389 - 458 -